Introduction

Hardware:

Worker nodes - b405-b407, b410-414, all X5650 - 6 cores, 2 GB/core, total 96 cores (effective 80 cores - see below)

Note that there is a vmem requirements for Atlas jobs in Torque:

resources_default.pvmem = 4000mb

It effectively lowers the number of usable cores to 10 per node (because we have 24 GB RAM and 16 GB swap - total 40GB)

This has always been the case for all previous jobs.

Similar to June2013 Tests

  • The cluster is ready in exactly the same configuration as we had in June of 2013. The only difference is:
    • the WNs are running SL6.4
    • Torque server (bugaboo-dev.westgrid.ca) is running SL6.4 and Torque-5.1.0 Moab-8.1.0
    • The CE configurations are unchanged since June 2013. CVMFS-2.1.20 The endpoints are mounted on the WNs using autofs

HC Configuration

Submission to test queues require the extra option use_all_spacetokens and -o[Panda]siteType=all -o[Panda]processingType=hammercloud -o[Panda]siteType=all

Tests

Test 20055342

Test 20055524

Test 20055499

Results

PD3P Benchmarks

UA Benchmarks

These cannot be compared with the Nov 2013 results as the number of jobs are different - there were many major changes during this interval (JEDI, rucio) and we don't have resources to track this down.

Topic attachments
ISorted ascending Attachment History Action Size Date Who Comment
PDFpdf SFU-Arbutus.pdf r1 manage 431.1 K 2015-05-07 - 21:37 AsokaDeSilva  

This topic: AtlasCanada > WebHome > GridActivities > HammercloudTests > SFU-Apr2015
Topic revision: r19 - 2015-05-08 - AsokaDeSilva
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback