Tier-2 Weekly Report 2008-11-25

SAM Results

  • sam-ops-availability-20081125.png:
    sam-ops-availability-20081125.png

  • sam-ops-reliability-20081125.png:
    sam-ops-reliability-20081125.png

  • sam-atlas-availability-20081125.png:
    sam-atlas-availability-20081125.png

  • sam-atlas-reliability-20081125.png:
    sam-atlas-reliability-20081125.png

APEL Accounting Publishing Status

  • apel-chart-20081125.png:
    apel-chart-20081125.png

APEL Accounting Results

  • apel-gant-20081125.png:
    apel-gant-20081125.png

General News

  • Grid Canada CA CRL errors [2008-11-24]
    • the CRL was failing consistently for 24+ hours to be downloaded as part of the EUGRIDPMA crontab; confirmed this morning with Alberta CRL crontab log
    • Grid Canada rebooted web server evening of 2008-11-24; email notification from H. Guy regarding issue
    • correct access restored this morning

  • Tier-1/2 Manpower survey questions [2008-11-21]
    • reminder to sites to send MV requested information

  • Distributed Analysis Challenges
    • Meeting last week at CERN [2008-11-20]; A. de Silva will be contact for CA with distributed analysis (DA) team
    • purpose of challenges are to stress scaling capabilities of the systems; not a functional test (this is already done by the ganga robot)
    • tests will use the glite WMS and not Panda for this first set of tests. Therefore need to ensure proper maui configurations are in place at the sites so that the needed number of jobs can be run per user
    • Information requested of sites:
      • maui configuration (fairshare, priorities, max # jobs per atlas user, ...)
      • site admin availability over the next 1-2 weeks (for quick investigation of any reported issues)
      • site ganglia statistics and plots - please provide links for your site ganglia information so that it can be added to the operations TWiki
      • communications between DA team, A. de Silva and T2 sites via usual operations list please
    • need to collect this information prior to any coordinated test; we would like to include all the sites in the challenge.

Site Reports

Alberta

Outstanding and Recent Issues

  • installing secondary site infrastructure using vmware for gLite updates deployment testing prior to moving any service changes into production
  • stderr/stdout direction with a handful of remaining WNs
  • various gLite updates to CE, SE and MON pending (see above)

SFU

Outstanding and Recent Issues

  • python/dccp errors [2008-11-21; resolved?]
  • SFU-MCDISK became full [2008-11-23]; %share of AOD distribution temporarily ajusted during this period [BC]; increased in size [SC 2008-11-24]

Victoria

Outstanding and Recent Issues

  • corrected SE/SRM information in GOCDB for site [2008-11-23]

  • apel accounting statistics investigation - why are they so low? cronjob error is believed to be the reason.

Toronto

Outstanding and Recent Issues

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 11138 2643 87213925 4574549 80.8% 95%
SFU-LCG2 2368 706 25112066 706636 77% 97.3%
VICTORIA-LCG2 2446 620 47439503 4747939 79.8% 90.9%
TORONTO-LCG2 1712 682 59110395 4074599 71.5% 93.6%
ALBERTA-LCG2 1344 765 24817827 2537665 63.7% 90.7%
total 19008 5416 243693716 16641388 77.8% 93.6%

dashboard_summary.pdf

Failed Jobs

ProductionFailedJobs-25Nov08.pdf

Notes

-- BryanCaron - 25 Nov 2008

Topic attachments
I Attachment History ActionSorted ascending Size Date Who Comment
PDFpdf ProductionFailedJobs-25Nov08.pdf r1 manage 51.5 K 2008-11-25 - 18:30 AsokaDeSilva  
PNGpng apel-chart-20081125.png r1 manage 1001.5 K 2008-11-25 - 18:40 BryanCaron apel-chart-20081125.png
PNGpng apel-gant-20081125.png r1 manage 22.5 K 2008-11-25 - 18:40 BryanCaron apel-gant-20081125.png
PDFpdf dashboard_summary.pdf r1 manage 90.8 K 2008-11-25 - 18:30 AsokaDeSilva  
PNGpng sam-atlas-availability-20081125.png r1 manage 2146.4 K 2008-11-25 - 18:39 BryanCaron sam-atlas-availability-20081125.png
PNGpng sam-atlas-reliability-20081125.png r1 manage 2032.4 K 2008-11-25 - 18:39 BryanCaron sam-atlas-reliability-20081125.png
PNGpng sam-ops-availability-20081125.png r2 r1 manage 2082.1 K 2008-11-25 - 18:37 BryanCaron sam-ops-availability-20081125.png
PNGpng sam-ops-reliability-20081125.png r2 r1 manage 1984.1 K 2008-11-25 - 18:38 BryanCaron sam-ops-reliability-20081125.png
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2008-11-25 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback