Tier-2 Weekly Report 2009-01-13

-- BryanCaron - 13 Jan 2009

SAM Results

  • ops-availability-20090113.png:
    ops-availability-20090113.png

  • ops-reliability-20090113.png:
    ops-reliability-20090113.png

  • atlas-availability-20090113.png:
    atlas-availability-20090113.png

  • atlas-reliability-20090113.png:
    atlas-reliability-20090113.png

APEL Accounting Publishing Status

  • apel-gant-20090113.png:
    apel-gant-20090113.png

APEL Accounting Results

  • apel-chart-20090113.png:
    apel-chart-20090113.png

General News

  • PANDA queues noticed as temporarily offline for the CA CLOUD - reason why unknown [January 8]
    • brief scheduled downtime for TRIUMF but why all others offline? No answer determined from ADC Ops.
    • all sites reset to online by ADC Ops shifter

  • Site Test Package (A. de Silva)

  • Tier1/2 face-to-face meeting at TRIUMF scheduled for January 26 (full day) and 27 (half day) agenda link

Site Reports

Alberta

Outstanding and Recent Issues

  • no issues in last week
  • scheduled downtime for Thursday January 15 for 6 hours starting at 08:00 MST due to interruption of chilled water service to HVAC unit in our computing centre

  • installing secondary site infrastructure using Xen for gLite updates deployment testing prior to moving any service changes into production
    • Xen VMs running (4); new host certificates created; CE glite middleware installed so far
  • stderr/stdout direction with a handful of remaining WNs
  • various gLite updates to CE, SE and MON pending (see above)

SFU

Outstanding and Recent Issues

  • SFU and Ganga issues - software release area missing ; remounted; 1 WN offline [January 6]
  • gridstore not responding due to running out of memory ; hard restart required [January 11]
  • SFU analysis jobs issues - zero analysis pilots running (all job slots full of running production pilots) [January 12]
  • tomcat restarted saturday [January 10]

Victoria

Outstanding and Recent Issues

  • unix gid mapping error causing failure of globus-url-copy from /atlas/ca role; resolved [January 6,7]
  • SE gridmapfile update issues - missing DN for JSteele - manual update still required [January 6,7]
    • automatic cross-check with CE grid-mapfile would be good to have in place
  • caching of globus-job-run output seen (from December 15) - problem persisting [January 9]
    • problem related to different source job submitter systems (one real the other a VM)

Toronto

Outstanding and Recent Issues

  • SE gridmapfile update issues - missing DN for JSteele - manual update still required [January 6,7]
    • automatic cross-check with CE grid-mapfile would be good to have in place

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)Sorted descending
TRIUMF-LCG2 13184 1059 133411670 62564173 92.6% 68.1%
SFU-LCG2 3871 629 28657172 21354624 86% 57.3%
total 23290 2690 186795571 167930323 89.6% 52.7%
TORONTO-LCG2 6012 326 20947746 48964726 94.9% 30%
VICTORIA-LCG2 223 217 3778983 32658706 50.7% 10.4%
ALBERTA-LCG2 0 459 0 2388094 0% 0%

dashboard-summary.pdf

Failed Jobs

(The detailed Panda information is missing - I have asked the experts to fix this issue, hopefully we will have this prior to the meeting.)

ProductionFailedJobs-13Jan09.pdf

In the meantime, the dashboard summarizes the types of errors for the cloud as:

name,rank,value
EXEPANDA_JOBEXPIRED_SIXDAYS,1,562
EXEPANDA_JOBKILL_SIGTERM,2,446
TRF_EXC ,3,394
EXEPANDA_DQ2PUT_FILECOPYERROR,4,365
EXEPANDA_JOBDISPATCHER_HEARTBEAT,5,345
EXEPANDA_JOBKILL_BYPILOT,6,293
EXEPANDA_DQ2_STAGEIN,7,142
TRF_OUTFILE ,8,51
TRF_SEGFAULT ,9,35
EXEPANDA_DQ2PUT_FILECOPYTIMEOUT,10,30
EXEPANDA_GRID-PROXY_INVALID,11,15
TRF_PYT_SYNTAX ,12,5
EXEPANDA_GET_SIZEMISMATCH,13,3
EXEPANDA_DQ2GET_INFILE,14,2
TRF_SEGVIO ,15,2

Notes

-- BryanCaron - 13 Jan 2009

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf ProductionFailedJobs-13Jan09.pdf r1 manage 29.2 K 2009-01-13 - 18:46 AsokaDeSilva  
PDFpdf Tier2_Reliab_200810.pdf r1 manage 78.7 K 2009-01-15 - 18:08 BryanCaron  
PNGpng apel-chart-20090113.png r1 manage 972.5 K 2009-01-13 - 18:16 BryanCaron  
PNGpng apel-gant-20090113.png r1 manage 23.0 K 2009-01-13 - 18:16 BryanCaron  
PNGpng atlas-availability-20090113.png r1 manage 1424.0 K 2009-01-13 - 18:17 BryanCaron  
PNGpng atlas-reliability-20090113.png r1 manage 1253.4 K 2009-01-13 - 18:18 BryanCaron  
PDFpdf dashboard-summary.pdf r1 manage 90.4 K 2009-01-13 - 18:45 AsokaDeSilva  
PNGpng ops-availability-20090113.png r1 manage 1448.9 K 2009-01-13 - 18:17 BryanCaron  
PNGpng ops-reliability-20090113.png r1 manage 1289.4 K 2009-01-13 - 18:17 BryanCaron  

This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20090113
Topic revision: r8 - 2009-01-15 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback