Tier-1 and Tier-2 Weekly Report 2009-02-17

SAM Results

  • ops-availability-20090217.png:
    ops-availability-20090217.png

  • ops-reliability-20090217.png:
    ops-reliability-20090217.png

  • atlas-availability-20090217.png:
    atlas-availability-20090217.png

  • atlas-reliability-20090217.png:
    atlas-reliability-20090217.png

APEL Accounting Publishing Status

  • apel-status-20090217.png:
    apel-status-20090217.png

APEL Accounting Results

  • apel-table-20090217.png:
    apel-table-20090217.png

General News

  • next round of distributed analysis stress tests across CA sites https://twiki.atlas-canada.ca/bin/view/AtlasCanada/DAChallenge
    • Test 132 [all sites] - large amounts of failures at SFU (100%) and Alberta (53%) [2009-02-10]
    • Test 140 [SFU, Alberta only] - large amounts of failures at SFU (80%) - isolated 6 problematic WNs for further investigation [2009-02-13]
    • next iteration of tests (including File_Stager) on hold until Feb24 in order to resolve WN issues

  • panda pilots to start verifying credentials of the panda server sometime this week and thus requires sites ensure CA certificates properly installed and accessible from WNs [2009-02-13]
    • either through correct definition of X509_CERT_DIR or the default search path of /etc/grid-security/certificates/.
    • sites should consider setting X509_CERT_DIR to be certain and check environment setup on all WNs but should be alright already if your site is passing the critical SAM CA tests

  • distribution of reprocessed DPD datasets started by ATLAS DDM operations [2009-02-16]
    • subscriptions to TRIUMF and within CA cloud to T2s on hold for 3 - 4 days to first clear up backlog of file registrations in the TRIUMF LFC (not a site issue)
    • currently allocated to T2s as per usual AOD distribution (55% SFU, 20% Alberta, 15% Toronto, 10% Victoria)

Site Reports

Alberta

Recent Issues

  • [20090213] problematic WN resulted in failed ganga hammercloud tests with only 47% passing; isolated to a single WN (glite-WN installed directly instead of via tarball as rest of cluster) ; removed from torque/maui nodes list for repair
  • [20090217] added logrotate for dCache SE catalina.out logfile

Outstanding Issues

  • few WNs to be debugged with respect to missing stderr/stdout
  • still need to add 2nd GigE nics to dCache pools for internal network access from WNs to avoid NAT

SFU

Recent Issues

  • 100% failure of previous weeks hammercloud DA tests [2009-02-11] - list of 6 failing WNs identified and being debugged [2009-02-13]
    • see reference below about ganga jobs
  • SFU panda production queue issue - long running jobs in condorg but none in torque/moab - site torque/moab restarted; condorg cleared-up automatically [2009-02-11]
    • no new production pilots submitted during backlog of jobs in transfer state > 3K, was resolved [2009-02-13]
  • site BDII advertising GlueCEPolicyMaxCPUTime 0 [2009-02-12]; other CA sites 2880
    • reconfigured queues in torque to remove use of resources_max.cput setting; the site values then changed to 0 causing no jobs to match jdl requirement
      • a priori it is not known if pilots will run for 10 minutes or 3 days ; resources_max.cput setting may have adverse effects wrt torque/moab scheduling of backfill jobs on shared cluster facilities ; issue raised with DA team - likely needs further escalation within gLite team
  • experiment software directory access (ls) issues [2009-02-13]
    • VO_*_SW_DIR not defined on 31/32 WNs; corrected [2009-02-17]
    • 1 powersupply out of 5 failed on one of the HP blade chassis - still operating but no redundancy [2009-02-17]

Outstanding Issues

  • Ganga jobs failing at SFU a large fraction of the time and outstanding since 2008-11-10 - 100% failure of previous weeks hammercloud DA tests - under ongoing investigation

Victoria

Recent Issues

Outstanding Issues

  • A. Agarwal now away on holiday (return after CHEP?); local admins keeping watch (and A. Agarwal remotely when possible)

Toronto

Recent Issues

  • analysis pilot errors in previous 24 hours (500 in prior 72 hours) [2009-02-13] with resulting FTS state failure to TRIUMF
    • site SE /var became full and was rebooted after some clean-up; un-needed replica managers running creating large log files [2009-02-17]
    • under further investigation and may need downtime to resolve - pnfsd issues

Outstanding Issues

  • scripts for auto-updating grid-mapfile on glite 3.0 dCache admin node

TRIUMF

Recent Issues

  • scheduled outage (1 hr) of FTS for service upgrade to v2.1 [2009-02-12]
    • new hardware for FTS reduces load by factor of 4 with better performance
    • adjusted number of concurrent transfers to/from T2s from 5 to 10
    • adjusted number of multiple streams per transfer down from 7 to 1 - testing for Toronto needs to be done to determine appropriate settings
  • According to ADC operations, there is a backlog of 80K files to be registred in TRIUMF's LFC: "This has raised the problem of slow LFC registration due to the long RTT. ATLAS will try to weed out less useful transfers (Jean-Phillipe reported that the requested new LFC bulk methods have been delivered)". Jean-Phillipe is the LFC developer...
  • DPDs distribution to TRIUMF is put on hold due to above (50K files, 6TB data volume)

Outstanding Issues

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)
TRIUMF-LCG2 8752 1028 216879210 6511925 89.5% 97.1%
TORONTO-LCG2 63 1901 3013646 22366365 3.2% 11.9%
ALBERTA-LCG2 766 17 24900711 307377 97.8% 98.8%
SFU-LCG2 507 274 14674788 60672 64.9% 99.6%
VICTORIA-LCG2 110 184 4346037 423304 37.4% 91.1%
total 10198 3404 263814392 29669643 75% 89.9%

DashboardSummary.pdf

Failed Jobs

FailedJobs-17Feb09.pdf

Notes

Numbers in Dashboard and Panda monitor Failed Jobs may not be matching because some of the failed jobs were because of transfer timeouts.

-- BryanCaron - 17 Feb 2009

Topic attachments
ISorted ascending Attachment History Action Size Date Who Comment
PDFpdf DashboardSummary.pdf r1 manage 89.5 K 2009-02-17 - 14:46 AsokaDeSilva  
PDFpdf FailedJobs-17Feb09.pdf r1 manage 42.3 K 2009-02-17 - 14:46 AsokaDeSilva  
PNGpng apel-status-20090217.png r1 manage 23.1 K 2009-02-17 - 07:43 BryanCaron  
PNGpng apel-table-20090217.png r1 manage 128.5 K 2009-02-17 - 07:44 BryanCaron  
PNGpng atlas-availability-20090217.png r1 manage 153.4 K 2009-02-17 - 07:41 BryanCaron  
PNGpng atlas-reliability-20090217.png r1 manage 104.9 K 2009-02-17 - 07:41 BryanCaron  
PNGpng ops-availability-20090217.png r1 manage 152.2 K 2009-02-17 - 07:40 BryanCaron  
PNGpng ops-reliability-20090217.png r1 manage 103.6 K 2009-02-17 - 07:40 BryanCaron  

This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20090217
Topic revision: r6 - 2009-02-17 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.