Tier1 and Tier-2 Weekly Report 2009-06-30

General News

STEP09 Summary Results

Cloud Site # Jobs # Successful # Failed Efficiency #files #events Hz CPU/Wall
CA ALBERTA-LCG2_MCDISK 1081 876 205 0.810 5501 51921120 2.6 26.4
CA ANALY_ALBERTA 4289 3869 420 0.902 13851 133317962 5.3 28.7
CA ANALY_SFU 9825 9293 532 0.946 23752 213366325 6.1 27.6
CA ANALY_TORONTO 13532 8779 4753 0.649 12378 79182379 2.9 41.8
CA ANALY_VICTORIA 6505 4774 1731 0.734 12775 117612022 4.6 40.8
CA SFU-LCG2_MCDISK 1007 1000 7 0.993 6298 56797005 2.1 16.0
CA TORONTO-LCG2_MCDISK 4215 2338 1877 0.555 4334 29601011 1.0 40.3
CA VICTORIA-LCG2_MCDISK 1436 1377 59 0.959 8228 75722230 2.3 35.4

  • ADVANCED NOTICE: upcoming request to sites re: new accounts for pilot and poweruser0 roles within /atlas/ca group
    • the handling of new pilots associated with the new roles of 'pilot' and 'poweruser0' are being tested at TRIUMF and ALBERTA
      • once confirmed then sites will be requested to add a few needed local user pool-style accounts to accommodate these roles; more news to follow
    • additional changes in the panda-backend are being planned to bring about the ATLAS-Canada computing model

  • REMINDER #1: SiteTests package should be installed by all site admins and exercised regularly (daily) to confirm site functions for ganga and pathena

  • REMINDER #2: site and LFC clean-up needed of files and (empty) directories associated with ccrc08 [2009-06-09]

SAM Results

OPS VO

  • ops-availability-20090630.png:
    ops-availability-20090630.png

  • ops-reliability-20090630.png:
    ops-reliability-20090630.png

ATLAS VO

  • atlas-availability-20090630.png:
    atlas-availability-20090630.png

  • atlas-reliability-20090630.png:
    atlas-reliability-20090630.png

APEL Accounting

APEL Publishing Status

  • apel-status-20090630.png:
    apel-status-20090630.png

APEL Accounting Results

  • apel-statistics-20090630.png:
    apel-statistics-20090630.png

Data Subscription Requests

  • This past week:

Site Reports

Alberta

Recent Issues

Outstanding Issues

  • installation of grid services on new Westgrid-UA T2 site still to done

  • few minor issues pending correction on existing T2 facility:
    • full decoupling of WLCG accounts from cluster NIS to be done (see problem reported 2009-04-14)
    • pnfsd.log to be added to log-rotate [2009-03-31]
    • few WNs to be debugged with respect to missing stderr/stdout
    • still need to add 2nd Gigabit Ethernet nic to dCache pools for internal network access from WNs to avoid NAT

SFU

Recent Issues

Outstanding Issues

Victoria

Recent Issues

Outstanding Issues

Toronto

Recent Issues

Outstanding Issues

  • Still have two open GGUS tickets to resolve GIP information for the dCache 1.9
    installation. Not movement on this in over a week.
    https://gus.fzk.de/ws/ticket_info.php?ticket=48236
    https://gus.fzk.de/ws/ticket_info.php?ticket=48235

McGill

Recent Issues

  • status?

Outstanding Issues

  • attempts to restore the McGill site to up-and-running state have resumed [2009-03-25]
    • pilots (without payload) successfully running
    • next target is successful SAM tests
    • SE functionality still to be tested on current dCache instance with two pools

TRIUMF

Recent Issues

Outstanding Issues

Production

Summary

site success failure success (walltime) failure (walltime) efficiency efficiency (walltime)Sorted descending
TRIUMF-LCG2 21956 591 242328601 2429835 97.4% 99%
TORONTO-LCG2 1528 58 65167234 1065291 96.3% 98.4%
SFU-LCG2 1168 148 15622742 296420 88.8% 98.1%
total 30413 1168 421313189 8606830 96.3% 98%
ALBERTA-LCG2 3036 71 48427411 1598157 97.7% 96.8%
VICTORIA-LCG2 2725 300 49767201 3217127 90.1% 93.9%

Dashboard_summary.pdf

Failed Jobs

Panda monitor not providing information today so Information taken from the production dashboard (see above site links).

TRIUMF:

name,rank,value
TRF_SVRINIT ,1,390
TRF_OUTFILE ,2,78
TRF_UNKNOWN ,3,49
TRF_SEGFAULT ,4,26
EXEPANDA_JOBKILL_BYPILOT,5,18
EXEPANDA_JOBDISPATCHER_NOREPLYTOSENTJOB,6,17
EXEPANDA_DQ2PUT_FILECOPYERROR,7,6
EXEPANDA_GET_ADLER32MISMATCH,8,5
EXEPANDA_PUT_LFCMODULEIMPORT,9,1
EXEPANDA_JOBKILL_TOOMUCHSTDOUT,10,1
EXEPANDA_DQ2_STAGEIN,11,1


Alberta:

name,rank,value
TRF_OUTFILE ,1,25
TRF_UNKNOWN ,2,19
TRFERROR,3,12
EXEPANDA_JOBDISPATCHER_NOREPLYTOSENTJOB,4,4
TRF_SEGFAULT ,5,4
EXEPANDA_JOBKILL_SIGTERM,6,2
TRF_SVRINIT ,7,2
EXEPANDA_GET_REPLICANOTFOUND,8,1
EXEPANDA_JOBDISPATCHER_HEARTBEAT,9,1
EXEPANDA_JOBKILL_BYPILOT,10,1


SFU:

name,rank,value
EXEPANDA_GET_NOSUCHFILE,1,73
EXEPANDA_GET_NOSUCHDBRELEASEFILE,2,48
TRF_SVRINIT ,3,8
EXEPANDA_JOBDISPATCHER_NOREPLYTOSENTJOB,4,4
TRF_OUTFILE ,5,3
TRF_SEGFAULT ,6,3
EXEPANDA_DQ2PUT_FILECOPYERROR,7,3
EXEPANDA_DQ2_STAGEIN,8,2
TRF_UNKNOWN ,9,2
EXEPANDA_JOBDISPATCHER_HEARTBEAT,10,1
EXEPANDA_JOBKILL_BYPILOT,11,1


Toronto:

name,rank,value
TRF_OUTFILE ,1,23
TRF_UNKNOWN ,2,15
EXEPANDA_JOBDISPATCHER_NOREPLYTOSENTJOB,3,10
EXEPANDA_JOBKILL_BYPILOT,4,3
EXEPANDA_DQ2GET_INFILE,5,2
TRF_SEGFAULT ,6,2
EXEPANDA_JOBDISPATCHER_HEARTBEAT,7,1
EXEPANDA_JOBKILL_BYSERVER,8,1
EXEPANDA_DQ2PUT_FILECOPYERROR,9,1


Victoria:

name,rank,value
TRF_ARG ,1,201
TRF_OUTFILE ,2,31
TRF_UNKNOWN ,3,20
TRF_SVRINIT ,4,10
TRF_SEGFAULT ,5,9
EXEPANDA_JOBKILL_BYSERVER,6,8
EXEPANDA_JOBKILL_BYPILOT,7,6
EXEPANDA_DQ2GET_INFILE,8,4
EXEPANDA_DQ2PUT_FILECOPYTIMEOUT,9,3
EXEPANDA_JOBDISPATCHER_HEARTBEAT,10,3
EXEPANDA_JOBKILL_SIGTERM,11,3
EXEPANDA_JOBDISPATCHER_NOREPLYTOSENTJOB,12,2

-- BryanCaron - 30 Jun 2009

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf Dashboard_summary.pdf r1 manage 97.9 K 2009-06-30 - 19:04 AsokaDeSilva  
PNGpng apel-statistics-20090630.png r1 manage 118.1 K 2009-06-30 - 19:27 BryanCaron  
PNGpng apel-status-20090630.png r1 manage 22.7 K 2009-06-30 - 19:27 BryanCaron  
PNGpng atlas-availability-20090630.png r1 manage 239.7 K 2009-06-30 - 19:26 BryanCaron  
PNGpng atlas-reliability-20090630.png r1 manage 161.5 K 2009-06-30 - 19:27 BryanCaron  
PNGpng ops-availability-20090630.png r1 manage 238.9 K 2009-06-30 - 19:26 BryanCaron  
PNGpng ops-reliability-20090630.png r1 manage 158.9 K 2009-06-30 - 19:26 BryanCaron  

This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20090630
Topic revision: r3 - 2009-06-30 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback