Tier1 and Tier-2 Weekly Report 2009-09-15

General News

  • ADC News (20090910)
    • no ADC ops meeting last week (CERN holiday)
    • ESD-to-ESD reprocessing campaign commenced (2009-09-11) See link for details.

  • Cloud operations [20090908]
    • to work around uncertainties in how the site queues are manually or automatically disabled within panda relative to the downtime status announced in GOCDB, if a CA site goes down for any reason cloud contacts (Bryan/Asoka/Di) will:
      • initiate setting the site queue(s) offline ourselves using the standard ADC procedure
      • email ADCoS shifters and ATCAN operations list for notification

  • REMINDER #1: reported SRM subsystem vulnerability in dCache [2009-07-27]
    • see dcache user-forum archives or forwarded email from Reda
    • all production versions affected and require advertised patches [2009-08-04]
      • 1.9.1-11, 1.9.2-11, 1.9.3-3, 1.9.4-2
    • I would like to see us take a detailed inventory of our current and planned site dCache configurations (hardware and service distribution) and deployed release versions
      • SFU: all nodes at 1.9.2-8 and client 1.9.2-4
      • Toronto: admin, chimera nodes at 1.9.0-8, srm/gip at 1.9.1-7, pools at 1.9.1-7
      • WestGrid-Alberta: all nodes at 1.9.3-3

  • REMINDER #4: site and LFC clean-up needed of files and (empty) directories associated with ccrc08 [2009-06-09]

SAM Results

OPS VO

  • ops-availability-t2-20090915.png:
    ops-availability-t2-20090915.png

  • ops-reliability-t2-20090915.png:
    ops-reliability-t2-20090915.png

ATLAS VO

  • atlas-availability-t2-20090915.png:
    atlas-availability-t2-20090915.png

  • atlas-reliability-t2-20090915.png:
    atlas-reliability-t2-20090915.png

APEL Accounting

APEL Publishing Status

  • apel-gantt-20090915.png:
    apel-gantt-20090915.png

APEL Accounting Results

  • apel-statistics-20090915.png:
    apel-statistics-20090915.png

Data Subscription Requests

  • This past week: None

Site Reports

Alberta

Recent Issues

  • installation status: WLCG on WestGrid-Alberta cluster [2009-09-15]
    • dCache upgraded to 1.9.3-3 and under test
    • APEL-MON services to be installed this week

Outstanding Issues

  • few minor issues pending correction on existing T2 facility:
    • full decoupling of WLCG accounts from cluster NIS to be done (see problem reported 2009-04-14)
    • pnfsd.log to be added to log-rotate [2009-03-31]
    • few WNs to be debugged with respect to missing stderr/stdout
    • still need to add 2nd Gigabit Ethernet nic to dCache pools for internal network access from WNs to avoid NAT

SFU

Recent Issues

  • commissioning of bugaboo (SL5 WNs) within Panda for production underway [20090908]
    • information system updates/fixes re: atlas releases - done
    • jobmanager issues overcome by yaim reconfigure of lcg-CE - done
    • python and version dependency issues via Ganga currently under investigation
    • production queue online in Panda [20090914]

Outstanding Issues

  • apel publishing [20090825]
    • publishing status for dteam appears empty since mid-July and coincides with appearance of the atcan group in the status graphs (see above)

Victoria

Recent Issues

  • unscheduled downtime for approx. 4 hours [20090912]
    • unscheduled power outage to the University brought down site services and nodes

Outstanding Issues

Toronto

Recent Issues

  • FileStager issues observed (GangaRobot and SiteTests) [20090909]
    • restarted srm and door services [20090909] [solved]

Outstanding Issues

McGill

Recent Issues

  • status?

Outstanding Issues

  • attempts to restore the McGill site to up-and-running state have resumed [2009-03-25]
    • pilots (without payload) successfully running
    • next target is successful SAM tests
    • SE functionality still to be tested on current dCache instance with two pools

TRIUMF

Recent Issues

  • 2h scheduled downtime to apply latest kernel updates [20090909]
  • scheduled downtime announced for [20090916] for dcache upgrade and other middleware reconfiguration

Outstanding Issues

  • scheduled downtime for dCache patch application [2009-07-30]
    • postponed: TRIUMF planned to upgrade to 1.9.1-10, but a bug warning was issued, we need to reevaluate which upgrade path is best.

Production

Summary

site success failure success (walltime)Sorted descending failure (walltime) efficiency efficiency (walltime)
total 2545 164 70186484 6452517 93.9% 91.6%
TORONTO-LCG2 684 56 27269735 4732766 92.4% 85.2%
VICTORIA-LCG2 521 46 20242075 1103359 91.9% 94.8%
TRIUMF-LCG2 958 49 14958916 490031 95.1% 96.8%
ALBERTA-LCG2 266 4 5985891 16461 98.5% 99.7%
SFU-LCG2 116 9 1729867 109900 92.8% 94%

DashboardSummary.pdf

Failed Jobs

From Panda Monitor: FailedJobs.pdf

From Dashboard:

You can find the meanings of the transform error codes on this link.

TRIUMF:

name,rank,value
TRF_SVRINIT ,1,33
EXEPANDA_ATHENA_RAN-OUT-OF-MEMORY,2,9
EXEPANDA_JOBKILL_SIGTERM,3,2
EXEPANDA_JOBKILL_BYPILOT,4,2
TRF_UNKNOWN ,5,2
EXEPANDA_JOBDISPATCHER_HEARTBEAT,6,1


Alberta:

name,rank,value
TRF_SVRINIT ,1,4


SFU:

name,rank,value
EXEPANDA_JOBKILL_SIGTERM,1,4
TRF_SVRINIT ,2,2
EXEPANDA_DQ2_STAGEIN,3,1
EXEPANDA_JOBDISPATCHER_HEARTBEAT,4,1
EXEPANDA_PUT_LFCMODULEIMPORT,5,1


Toronto:

name,rank,value
TRFERROR,1,38
TRF_SVRINIT ,2,14
TRF_UNKNOWN ,3,2
EXEPANDA_DQ2PUT_FILECOPYERROR,4,1
EXEPANDA_DQ2_STAGEIN,5,1


Victoria:

name,rank,value
EXEPANDA_JOBDISPATCHER_HEARTBEAT,1,22
TRF_SVRINIT ,2,13
EXEPANDA_DQ2_STAGEIN,3,5
EXEPANDA_JOBKILL_BYPILOT,4,4
EXEPANDA_DQ2GET_INFILE,5,1
TRFERROR,6,1

Notes

  • Very few jobs for the past week.
  • Toronto had SE issues GGUS 51524
  • Victoria - unexpected power outage (~4 hours, 12 Sep).

-- BryanCaron - 14 Sep 2009

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf DashboardSummary.pdf r1 manage 99.4 K 2009-09-15 - 17:15 AsokaDeSilva  
PDFpdf FailedJobs.pdf r1 manage 46.8 K 2009-09-15 - 17:15 AsokaDeSilva  
PNGpng apel-gantt-20090915.png r1 manage 22.5 K 2009-09-15 - 17:43 BryanCaron  
PNGpng apel-statistics-20090915.png r1 manage 129.6 K 2009-09-15 - 17:43 BryanCaron  
PNGpng atlas-availability-t2-20090915.png r1 manage 137.9 K 2009-09-15 - 17:42 BryanCaron  
PNGpng atlas-reliability-t2-20090915.png r1 manage 91.6 K 2009-09-15 - 17:42 BryanCaron  
PNGpng ops-availability-t2-20090915.png r1 manage 138.1 K 2009-09-15 - 17:41 BryanCaron  
PNGpng ops-reliability-t2-20090915.png r1 manage 91.7 K 2009-09-15 - 17:41 BryanCaron  

This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20090915
Topic revision: r4 - 2009-09-15 - BryanCaron
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback