Tier1 and Tier-2 Weekly Report 2011-01-25
General News
- ADC News [20110125]
- This Week
- Last Week
- WLCG Management Board [20110118] http://indico.cern.ch/conferenceDisplay.py?confId=116293
- CA Tier2 site resource capacity publishing confirmed correct overall, with some fixes needed for VO specific views (TBD)
- migration of Tier-2 MCDISK to DATADISK started [20110118]
- T2 sites requested to reallocate current free space in MCDISK to DATADISK
- CA Cloud Squad Actions [20110125]
- DaTRI requests approved / processed (last week)
- TRIUMF-LCG2_LOCALGROUPDISK: 0 / 0 GB
- Australia-ATLAS_LOCALGROUPDISK: 0 / 156 GB
- CA-ALBERTA-WESTGRID-T2_LOCALGROUPDISK: 0 / 0 GB
- CA-SCINET-T2_LOCALGROUPDISK: 0 / 142.5 GB
- CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK: 0 / 0 GB
- SFU-LCG2_LOCALGROUPDISK: 0 / 0GB
- ATLAS Site Exclusion Savannah entries [20110125]
- queue operations
- HammerCloud autoexclusions
- CA-SCINET-T2 production queues and analysis queue set to test by CA cloud squad for scheduled downtime [20110118]
- site analysis queue set online [20110121] by CA cloud squad and production queues validated and set online by ADCoS shifter [20110122]
- other cloud squad related savannah and / or ROC ggus tickets [20110125]
- PD2P (dynamic data placement) in CA cloud (20110125)
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets) [Last 7 days shown]
- note that only DATADISK is now a destination for PD2P [since 20110112]
-
- REMINDER: new TRIUMF pilot factory history monitor for sites and queues (Asoka) [20110117]
- new outside (CERN) pilot factory submitting production jobs to CA cloud sites [20110124]
- Open Issues and Ongoing Discussions
- published site installed resource capacity information to be investigated and confirmed against WLCG information [20100928]
- CREAM CE deployment preparations
- new TWiki page https://twiki.atlas-canada.ca/bin/view/AtlasCanada/CreamCE [20101019]
- [20110112] the plan is to first do the switch at TRIUMF, sometime after the scheduled downtime that takes place early next week coincident with the ADC outage, followed by a scale-up of the number of WNs at the site that receive jobs from the CREAM CE
-
- HammerCloud
- HammerCloud tests of TRIUMF completed via panda to compare direct i/o via dcap, FileStager and full file copy
- HammerCloud tests of CA clouds sites is planned to be resumed soon to help measure site performance and identify any site setup bottlenecks [2010803]
- issue of sites within Cloud None within the production dashboard [20100829]
- issue raised to ADC operations email list given that there was no ADC Weekly meeting yesterday
- reply from ADC monitoring coordinator (A. Read) is that this long-standing problem is known and being worked on, but is difficult to fix
- this problem will be on the agenda for the next ADC monitoring meeting scheduled for next week
- UPDATE (20101221): will follow-up in new year with this as the production system dashboard is no longer used and instead there is a historical job history available within the ADC Monitoring pages
- Previously Reported Information on this topic:
- escalate query to ATLAS dashboard support regarding missing CA-SCINET-T2 site in the ARDA dashboard production activity display [20100216]
- reminder message posted to the Dashboard Savannah entry for this problem https://savannah.cern.ch/bugs/index.php?64507
[20100518] (updated 20101012)
- news from ADC monitoring coordinator A. Read (20101013):
- "The cloud issue has proven difficult to deal with in the present production dashboard framework. This month and next we are discussing changes in direction which we hope will make it much more straightforward to deal with the clouds."
- CA-VICTORIA-WESTGRID-T2 site missing from the ATLAS dashboard SAM Visualization page [20100824]
- request submitted to Panda team for functionality to set site Panda queues offline automatically based upon scheduled outages/availability [20100216]
- Security News [20110125]
- REMINDER: High Risk Vulnerability CVE-2010-3859 kernel: heap overflow in tipc_msg_build() [EGI-ADV-20110701]
- gLite News [20110125]
- ACTION REQUEST: sites should comment on their plans with respect to the glite-MON to glite-APEL migration
- gLite Release of UPDATE 21 to gLite 3.2 Priority: Normal [20110118]
- host certificate update for VOMS service on lcg-voms.cern.ch (atlas, ops VOs) [20110113]
- REMINDER: sites are required to add EGI voms servers for dteam to their site configurations
- as of this morning [20110104] the following (in the CA cloud and other legacy sites) were missing: https://gus.fzk.de/ws/ticket_info.php?ticket=65299
- list of misconfigured sites to be re-evaluated following return of CERN from winter closure [20110105]
- UPDATE [20110111]: list (CA) includes:
- atlaslcgce.clumeq.mcgill.ca, atlasse.clumeq.mcgill.ca
- fts-sb.triumf.ca, fts.triumf.ca, t1-ppsce.triumf.ca
- lcg-se.lps.umontreal.ca
- UPDATE [20110117]: support for dteam VO will be removed entirely from CERN VOMS servers on 20110126
- REMINDER: gLite 3.1 Retirement of glite-VOMS and glite-MON [20101214]
- REMINDER: gLite 3.1 Retirement Calendar http://glite.web.cern.ch/glite/packages/R3.1/
- ROC_Canada News [20110125]
- Squid Deployment [20110125]
- CA cloud Frontier and Squid deployment information (versions and network information)
- SAM tests: (CA Link)
, (Aus Link)
: currently status as of this morning (WARN is ok) [20110125]
- CA-ALBERTA-WESTGRID-T2 OK (OK for local squid; OK backup to SFU)
- CA-SCINET-T2: OK (both for local squid and backup to SFU)
- CA-VICTORIA-WESTGRID-T2 OK (OK for local squid; OK for backup to CA-ALBERTA-WESTGRID-T2)
- SFU-LCG2 OK (both CEs; both for local squid and backup to CA-VICTORIA-WESTGRID-T2)
- ATLAS_AUSTRALIA - OK (OK for local squid and backup to CA-VICTORIA-WESTGRID-T2)
- TRIUMF-LCG2 OK (ce1) OK (ce2) (local Frontier launchpad and BNL as backup)
- VICTORIA-LCG2 OK (OK for local squid and backup to CA-VICTORIA-WESTGRID-T2)
SAM Results
- site service status via Gridview
- Please check your site
- DECEMBER 2010 NOTES
- From 20101222 onward the ATLAS results show as 'not available' across many T1 and T2 sites (including those in CA cloud); central SAM issue
- UPDATE: test status and results restored beginning around 20110105
- CA-SCINET-T2 in December 2010
- See 20101204 to 20101206, and 20101209
- See 20101214, 20101217 and 20101220
- See 20101223 and 20101224 [ACTION REQUEST: SIR to be completed since service errors lasted greater than 24 hours]
- January 2011 (valid only until 20110125)
- January 2011 Detailed Site Information (valid only until 20110125):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
- OPS (this month)
- snowpatch-hep CE problems - since 20110102 to 20110110
- ATLAS (this month)
- repeatable and periodic ATLAS VO CE job failures throughout the month
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
- see gLite news above regarding the end-of-life with regards to glite-MON on SL4 and the migration to glite-APEL on SL5
- NOTE [20110125]: Tier-1 APEL dashboard information not correctly showing Tier-1 statistics other than for CERN (other sites omitted); to be followed-up
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
- scheduled downtime to glite-MON for migration to glite-APEL [20110124]
Outstanding Issues
- dCache door network tuning
- cream CE testing
- dCache testbed - futher studies regarding dCache upgrade path
- additional open items being followed-up:
- need to update to dCache golden release cycle from currently running 1.9.3-3 - targetting mid-September for upgrade - delayed
- performance of fairshare trees configuration to be studied with WestGrid site admins in regards to priorities, non-NRAC allocations and effect upon priority of ATLAS jobs
- network cabling maintenance planned for lighpath connection [postponed from 20100319]
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
- dCache restart to resolve observed job failures with srm lcg_cr timeouts [20110120]
- corrected published values of PhysicalCPUs and LogicalCPUs to remove double counted resources from CREAM CE [20110121]
- updated CEs to include lsc files needed to support BNL VOMS server based proxies [20110124]
- see section above for SAM Results regarding regular ATLAS VO test failures which occur at regular intervals over the month [20110125]
Outstanding Issues
- cream CE installation and testing started [20100929]
- test installation (blackhole.westgrid.ca) at first which will subsequently be applied to update the lcg-CEs (snowpatch then bugaboo)
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
- corrected published values of PhysicalCPUs and LogicalCPUs to remove double counted resources from CREAM CE [20110121]
- CREAM CE debugging ongoing
Outstanding Issues
- CREAM CE installation to be performed in next few weeks [20101005]
- Occasionally some jobs fail to stage-in .gpg files via scp and have to be terminated. (20100928)
- 20101214 - This is believed to be fixed now. The probable cause was LDAP connections being sporadically broken, due to the ldap user account on the LDAP server occasionally hitting the ulimit of 1024 open files. We have not observed the problem for awhile now.
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
- scheduled downtime for maintenance including site chiller [20110117 to 20110121]
- see section above SAM Results for lcg-ce1 ops test failures on 20110124 for 18 hours [20110125]
Outstanding Issues
- gpfs problems required scheduler shutdown and gpfs restart causing all running jobs to be lost [20101225]
- tcp tuning exercise [20101116]
- corrected routing issue between doors and pools which previously were transferring data to pools over external nics rather than internal network [20101112]
- improvements in communication between LFC server and site WNs observed
- retry ENV variables to be added still
- dCache error investigations
- Occassional "There is no file with pnfsid=.." errors (20100430)
- under discussion with dCache experts at TRIUMF and elsewhere
- dCache PutUseSpaceCallbacks errors (20100504)
- Q: Are these still an issue and under investigation? (BC) [20101026]
- SciNet-TRIUMF lightpath network use and optimization [20100413]
- BGP established on Force 10 router for link to TRIUMF [20100407]
- Information Request: is a failover test to the ORAN planned? A: Not yet.
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
- identified clock skew associated with Grid Canada CRL server that was causing proxy errors (see ggus 66313); corrected by Grid Canada
- migration of T1 MC datasets on MCDISK to DATADISK to commence centrally by ADC DDM team, with reassignment of cleanedup space in MCDISK to DATADISK [20110125]
Outstanding Issues
- configured CREAM CE [20100929]
- under local test and debugging of ENV settings
- HammerCloud tests of TRIUMF completed via panda to compare direct i/o via dcap, FileStager and full file copy [20100827]
- PFC creation time and gaps under investigation following production errors [20100729]
- solved by subsequent PFC update but larger issue of PFC update timing needs attention
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
- identified bug in SL53/54 x86_64 where a combination of specific LD_PRELOAD and LD_LIBRARY_PATH can cause core binaries (ls, rm etc.) to segfault
McGill
Recent Issues
Outstanding Issues
Production
Summary
CA Cloud Statistics Reference Link (Last Week)
Overall Statistics Reference Link (Last Week)
-
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud (Panglia
View):
- How we fared to other ATLAS sites during the past week:
- Alternate Views (Source link
for last 7 days):
Time interval: 2011-01-18 00:00:00 to 2011-01-25 00:00:00
cloud: [FINISHED/FAILED]
US (852725/91662)
DE (377953/62109)
FR (384350/36953)
UK (309806/36186)
CERN (232491/37703)
NL (174529/19071)
IT (155465/10358)
ND (124877/10456)
CA (94957/13523)
ES (60016/21362)
TW (70102/4250)
Cloud: [FINISHED/FAILED]
CA (94957/13523)
Production Site:
Australia-ATLAS (2319/35)
CA-ALBERTA-WESTGRID-T2 (5123/182)
CA-SCINET-T2 (753/29)
CA-VICTORIA-WESTGRID-T2 (4806/36)
SFU-LCG2 (3041/107)
TRIUMF (19019/1667)
Analysis Site:
ANALY_AUSTRALIA (7745/2646)
ANALY_ALBERTA-WG1 (8979/617)
ANALY_SCINET (3975/551)
ANALY_VICTORIA-WG1 (3576/1364)
ANALY_SFU (1879/439)
ANALY_SFU_bugaboo (1631/278)
ANALY_TRIUMF (32111/5572)
Failed Jobs
- From Panda Monitor (last week)
You can find the meanings of the transform error codes on
this link.
- Yuri's notes: (Jan 18 - 24, 2011)
Not Yet Available.
--
BryanCaron - 2011-01-25