Tier1 and Tier-2 Weekly Report 2011-08-16

General News

  • ADC and ATLAS Computing News [20110815]
    • ADC Weekly meeting
    • The release 17 reprocessing campaign has just started (Fri with rel 17.0.2.8) with the data from period H. The data will then be processed in reverse time-order until period B is reached. Data from after the technical stop in June (period I+) will be reprocessed in a second step (around Sept 1) after the Tier0 has switched to release 17.
    • Discussions about reprocessing at https://groups.cern.ch/group/atlas-project-adc-operations/Lists/Archive/Flat.aspx?RootFolder=%2fgroup%2fatlas-project-adc-operations%2fLists%2fArchive%2fStart%20of%20Release%2017%20Reprocessing&FolderCTID=0x012002006AFDB9BC20AB0641A7D18AE730BAEECA&TopicsView=https%3A%2F%2Fgroups.cern.ch%2Fgroup%2Fatlas-project-adc-operations%2Fdefault.aspx
      • Small change in the workflow, to avoid split lumiblocks. Produce the final AODs directly from the ESDs (no AOD merging), together with TAG and DESD datasets. * The only major problem identified so far is that the DESDM-MET seems to be broken, merging jobs will fail. * Problem understood, but needs new cache to fix. Will likely need to re-generate and merge all the DESDM MET files. * Not a big deal for the physics results though, but may require to keep the ESDs around until this can be done.
    • Many minor issues being resolved at most T1's for reprocessing campaign.
    • Issue with getting replacement for some central service machines whose warranties run out at end of the year as can't get 4-core processors as easily. Probably go with 24-core boxes. Define VM's with 2-4 cores (if 8 or more needed use a separate box?).
      • Some central services should run on physically independent machines.
    • There was a high load on the ATLR offline database caused by high rate of T0 jobs. Will attempt Frontier to protect the load on Oracle servers.
    • WLCG announced CVMFS namespace upgrade on Monday. The new layout on lxbatch broke CERN prod/analy for a while. RAL also affected.
    • DDM report. Cleanup of empty directories not currently supported. LFC limited to 1M files per subdirectory. Caused blacklisting at some sites due to Hammercloud tests writing into /grid/atlas/users/pathena/user.elmsheus and filling either local storage (65k max) capacity or LFC.
    • End of summer at least before fix is in central deletion service
    • Cloud squads should take note and action if necessary https://twiki.cern.ch/twiki/bin/view/Atlas/SquadHowTo#Deletion of empty directories
    • 12 New T2Ds proposed (not been a T1 meeting since SW week to push this forward)
      • CA : CA-VICTORIA-WESTGRID-T2, CA-SCINET-T2.
      • Recommended number of concurrent files for these channels is 20.
    • List of all T2Ds and how to configure the channels in : https://twiki.cern.ch/twiki/bin/view/Atlas/DDMOperationsFTS#T2Ds channels
  • CA Cloud Squad Actions [20110816]
    • DaTRI requests approved / processed (last month)
SITE NumRequests NumDatasets NumSubscribed SizeofAllDatasets (GB)
AUSTRALIA-ATLAS-LOCALGROUPDISK 0 0 0 0
AUSTRALIA-ATLAS_SCRATCHDISK 24 1376 437 6489
CA-SCINET-T2_LOCALGROUPDISK 0 0 0 0
CA-SCINET-T2_PHYS-TOP 0 0 0 0
CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK 2 247 242 4470
CA-VICTORIA-WESTGRID-T2_PHYS_EXOTICS 6 72 72 36
SFU-LCG2_LOCALGROUPDISK 1 118 115 5475
SFU-LCG2_PHYS-SM 0 0 0 0
TRIUMF-LCG2_LOCALGROUPDISK 0 0 0 0
TRIUMF-LCG2_SCRATCHDISK 1 1 1 0.5
TRIUMF-LCG2_PERF-TAU 0 0 0 0
TOTAL 34 1814 867 16472

    • Declared Downtimes
      • CA-MCGILL-CLUMEQ-T2 UNSCHEDULED downtime (OUTAGE) [08-08-2011 14:10 to 15-08-2011 00:00 UTC ] - site still down for re-installation and recovery.
      • SFU-LCG2 SCHEDULED downtime (OUTAGE) [15-08-2011 20:00 to 26-08-2011 23:55 UTC ] Major site upgrade - UDPs, hardware, OS
      • SFU-LCG2 SCHEDULED downtime (OUTAGE) [20-08-2011 20:00 to 26-08-2011 23:55 UTC ] Major site upgrade - UDPs, hardware, OS
      • CA-MCGILL-CLUMEQ-T2 SCHEDULED downtime (OUTAGE) [16-08-2011 13:00 to 30-08-2011 00:00 UTC ] Extending dowtime to allow time for re-installation and recovery from the security breach.
      • CA-ALBERTA-WESTGRID-T2 UNSCHEDULED downtime (OUTAGE) [15-08-2011 15:50 to 15-08-2011 16:30 UTC] NFS is stuck which makes Checkers scheduling system lame
      • CA-MCGILL-CLUMEQ-PPS SCHEDULED downtime (OUTAGE) [17-08-2011 17:10 to 16-09-2011 00:00 UTC ] Downtime to allow time for restallation and recovery from a security breach.
    • ATLAS Site Exclusion Savannah entries [20110621]
      • HammerCloud autoexclusions
        • ANALY_ALBERTA-WG1 Auto-Excluded at Tue Aug 9 02:30:04 2011 CET
        • ANALY_ALBERTA-WG1 reset online at Tue Aug 9 14:00:04 2011 CET
        • ANALY_ALBERTA-WG1 Auto-Excluded at Sun Aug 14 19:00:05 2011 CET
        • ANALY_ALBERTA-WG1 reset online at Mon Aug 15 20:30:04 2011 CET
        • ANALY_ALBERTA-WG1 Auto-Excluded at Tue Aug 16 06:00:06 2011 CET
        • ANALY_ALBERTA-WG1 reset online at Tue Aug 16 12:30:08 2011 CET
    • other cloud squad related savannah and / or ROC ggus tickets [20110705]
pd2p_t1_20110816.png
pd2p_t2_20110816.png

  • Security News [20110621]
    • [20110524] UVic and Toronto participated in SSC5 (23 May - 03 June 2011) - final reports to be sent to SSC5
    • [20110616] EGI CSIRT ADVISORY [EGI-ADV-20110615-02] Vulnerability for LRMS (details to be posted later)

  • gLite News [20110705]
    • [20110705] [https://operations-portal.egi.eu/broadcast/archive/id/420][EGI Trust Anchor release 1.40-1] is now final - please install.
    • [20110504] [https://operations-portal.egi.eu/broadcast/archive/id/378 ][gLite 3.2 WN release] has an important known issue detailed here: http://glite.cern.ch/glite-WN/known_issues
    • [20110627] New IGTF distribution (certificates) and version 3 of the CRL retrieval tool Fetch-crl https://dist.eugridpma.info/distribution/util/fetch-crl3/. Version 1.39 was updated to 1.40 on 2011-06-28.
    • [20110628] [https://operations-portal.egi.eu/broadcast/archive/id/410][gLite 3.2 update 30 release] The highlights of the update are:
      • New version of glite-BDII_top
      • New version of glite-CREAM (to support changes for SGE)
      • New version of glite-LB
      • New version of glite-SGE_utils

  • ROC_Canada News [20110809]

  • General Computing News

SAM Results

  • site service status via Gridview - Please check your site

  • August 9-16, 2011
sam_au_20110816.png
sam_alberta_20110816.png
sam_mcgill_20110816.png
sam_scinet_20110816.png

sam_vic_20110816.png
sam_triumf_20110816.png

APEL Accounting

APEL Publishing Status

apel_status_au_20110816.png
apel_status_ca_20110816.png

APEL Accounting Results

apel_report_au_20110816.png
apel_report_ca_20110816.png

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • see "Notes" section below

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

McGill

Recent Issues

Outstanding Issues

TRIUMF

Recent Issues

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • see "Notes" section below

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

  • production job issues
    • See "Production" Activities section below

  • analysis job issues
    • See "Notes" section below

Outstanding Issues

Production

panglia_world_prod_20110816.pngpanglia_world_ana_20110816.png
panglia_ca_prod_20110816.pngpanglia_ca_ana_20110816.png

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):


Highlights from world-wide weekly ADCoS operations status report - Torsten Harenberg

- still open
+ solved/closed

Friday 12-AUG-2011

Reprocessing:

- NIKHEF-ELPROD produced SEGFAULTS plus problems with CVMFS (Sasha asked Rod to exclude)
? RAL SEGFAULTS
 -> discussion on cvmfs-talk mailing list about that.
- FR cloud SEGFAULS (software setup/AFS problems)

Saturday 13-AUG-2011

Reprocessing

+ task 488929 high failure rate, sr #85521 submitted
+ task 491111: all jobs fail due to missing input files: Savannah 85494
+ NL/NIKHEF: set offline by Rod, bad cvmfs WNs, Savannah 122828 (site excl.), 85479 (repro), GGUS to site: 73451
 -> (later) NIKHEF fixed some scripts, asking GDP is queue can be set back online
 -> GDP approved, set NIKHEF back online
 -> at 2130h error rates at NIKHEF rise (60 within 1 hours), updated Savannah
 -> CVMFS developers contacted by NIKHEF on cvmfs-talk
+ ND: repro task 492193: 10 jobs fail (sr #85527)

Sunday 14-AUG-2011

Reprocessing

+ US/BNL: task definition problem which occurred to be "checksum mismatch", accidentally GGUS #73467 opened to site; was no site problem, sr #85597
task 492289: input GUID not found in DQ2, sr# 85528, task aborted by Sasha
+ tasks 492367 and 492368: ad idem, sr# 85530, task aborted by Sasha
+ task 492265: ad idem, sr# 85531, later aborted by Sasha

Monday 15-AUG-2011

+ CA/SFU: one CE down for SD, sr #122856

Reprocessing
- 492650 , 492829, 492833, and 492844 (data11_7TeV 17.0.2.8 merge) fail at several sites with SEGFAULT, sr# 85568
+ US/BNL: failed jobs (wrong checksum), turned out to be job definition problem, sr #85597, Sasha aborted the tasks (accidentally shifter sent a GGUS to BNL)
+ 493230, 493358, 493388: input files missing, aborted by Sasha, sr #85601
+ 493269, 492788, 493269, 493464, 493579, 493713, 493635, 493652, 493713: TRF_EXC, aborted and re-submitted by Sasha, sr #85600



-- LeslieGroer - 2011-08-16

Topic attachments
I Attachment History Action Size DateSorted descending Who Comment
PNGpng apel_report_au_20110816.png r1 manage 50.6 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng apel_report_ca_20110816.png r1 manage 97.7 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng apel_status_au_20110816.png r1 manage 10.7 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng apel_status_ca_20110816.png r1 manage 22.1 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng panglia_ca_ana_20110816.png r1 manage 49.4 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng panglia_ca_prod_20110816.png r1 manage 44.1 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng panglia_world_ana_20110816.png r1 manage 53.5 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng panglia_world_prod_20110816.png r1 manage 53.6 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng pd2p_t1_20110816.png r1 manage 46.1 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng pd2p_t2_20110816.png r1 manage 28.4 K 2011-08-16 - 18:44 LeslieGroer  
PNGpng sam_alberta_20110816.png r1 manage 7.3 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_au_20110816.png r1 manage 7.2 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_mcgill_20110816.png r1 manage 7.4 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_scinet_20110816.png r1 manage 7.1 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_sfu_20110816.png r1 manage 7.1 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_triumf_20110816.png r1 manage 7.1 K 2011-08-16 - 18:45 LeslieGroer  
PNGpng sam_vic_20110816.png r1 manage 7.3 K 2011-08-16 - 18:45 LeslieGroer  

This topic: AtlasCanada > T2WeeklyReport20110816
Topic revision: r1 - 2011-08-16 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback