Tier1 and Tier-2 Weekly Report 2011-08-23
General News
- ADC and ATLAS Computing News [20110822]
- ADC Weekly meeting
- Will distribute frozen showers DB Release files for large scale MC11 G4 (go to 4-digit DB release rather than 3-digit) * Based on 16.8.1, FSRelease-0.7.1.2.tar.gz
- BNL plans to move from pnfs to chimera at end of August
- LFC Consolidation testing ongoing with SARA
- verified 7.3M files transferred correctly. Need to check ACLs of a few directories
- Problems being identified e.g. >1M files in a directory. Many entries with no corresponding replica (~1/3?). Good opportunity to do big cleanup.
- Starting stress tests on ADCR. If works start the real migration of CERN LFC to ADCR on 29th, and the merge of SARA LFC 1 or 2 week afterwards.
- Production and Reprocessing:
- Power cut at CERN T0 limited reprocessed data distribution
- Central Catalog services had some problems - still being investigated
- Update CERN VOMS server from glite 3.2 to EMI 1 on Thursday installed old GridSites - caused drop in jobs for a day
- For many T1s : Files unaccessible on tape (INFN-T1, TRIUMF-LCG2, FZK-LCG2, PIC, IN2P3-CC).
- Some files couldnt be staged after many (>>5) attempts and then delay the end of reprocessing.
- Would be great if squads can act proactively and report to the tape experts files that cannot be staged after 2-3 attempts
- http://bourricot.cern.ch/dq2/media/stagein/StagingErrors
- Aim to have all data reprocessed with v17 for Oct/Nov in time for Winter conferences
- Two parts for >1PB of 2011 data: EPS dataset March-June, July-Aug in phase II. More than 1 fb^-1 each phase.
- For fast turnaround, three part workflow:
- RAW->ESD|HIST
- ESD->DESD|AOD|TAG, HIST->HIST.merge
- DESD -> DESD.merge, DESDM.merge, TAG.merge; HIST.supermerge
- After testing, about 1 week for full reprocessing (1099 tasks, 666k jobs, 0.54B events)
- CA did it's 5% share
- Some CVMFS problems at RAL and NIKHEF - being addressed but not recommended yet for reprocesing sites
- Half of T1's had problem retrieving RAW from tape, but fixed quickly.
- CA Cloud Squad Actions [20110816]
- DaTRI requests approved / processed (last month)
| SITE |
NumRequests |
NumDatasets |
NumSubscribed |
SizeofAllDatasets (GB) |
| AUSTRALIA-ATLAS-LOCALGROUPDISK |
0 |
0 |
0 |
0 |
| AUSTRALIA-ATLAS_SCRATCHDISK |
24 |
1376 |
437 |
6489 |
| CA-SCINET-T2_LOCALGROUPDISK |
0 |
0 |
0 |
0 |
| CA-SCINET-T2_PHYS-TOP |
0 |
0 |
0 |
0 |
| CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK |
2 |
247 |
242 |
4470 |
| CA-VICTORIA-WESTGRID-T2_PHYS_EXOTICS |
6 |
72 |
72 |
36 |
| SFU-LCG2_LOCALGROUPDISK |
1 |
118 |
115 |
5475 |
| SFU-LCG2_PHYS-SM |
0 |
0 |
0 |
0 |
| TRIUMF-LCG2_LOCALGROUPDISK |
0 |
0 |
0 |
0 |
| TRIUMF-LCG2_SCRATCHDISK |
1 |
1 |
1 |
0.5 |
| TRIUMF-LCG2_PERF-TAU |
0 |
0 |
0 |
0 |
| TOTAL |
34 |
1814 |
867 |
16472 |
-
- Declared Downtimes
- CA-MCGILL-CLUMEQ-T2 UNSCHEDULED downtime (OUTAGE) [08-08-2011 14:10 to 15-08-2011 00:00 UTC ] - site still down for re-installation and recovery.
- SFU-LCG2 SCHEDULED downtime (OUTAGE) [15-08-2011 20:00 to 26-08-2011 23:55 UTC ] Major site upgrade - UDPs, hardware, OS
- SFU-LCG2 SCHEDULED downtime (OUTAGE) [20-08-2011 20:00 to 26-08-2011 23:55 UTC ] Major site upgrade - UDPs, hardware, OS
- CA-MCGILL-CLUMEQ-T2 SCHEDULED downtime (OUTAGE) [16-08-2011 13:00 to 30-08-2011 00:00 UTC ] Extending dowtime to allow time for re-installation and recovery from the security breach.
- CA-ALBERTA-WESTGRID-T2 UNSCHEDULED downtime (OUTAGE) [15-08-2011 15:50 to 15-08-2011 16:30 UTC] NFS is stuck which makes Checkers scheduling system lame
- CA-MCGILL-CLUMEQ-PPS SCHEDULED downtime (OUTAGE) [17-08-2011 17:10 to 16-09-2011 00:00 UTC ] Downtime to allow time for restallation and recovery from a security breach.
- ATLAS Site Exclusion Savannah entries [20110621]
- HammerCloud autoexclusions
- ANALY_ALBERTA-WG1 Auto-Excluded at Tue Aug 9 02:30:04 2011 CET
- ANALY_ALBERTA-WG1 reset online at Tue Aug 9 14:00:04 2011 CET
- ANALY_ALBERTA-WG1 Auto-Excluded at Sun Aug 14 19:00:05 2011 CET
- ANALY_ALBERTA-WG1 reset online at Mon Aug 15 20:30:04 2011 CET
- ANALY_ALBERTA-WG1 Auto-Excluded at Tue Aug 16 06:00:06 2011 CET
- ANALY_ALBERTA-WG1 reset online at Tue Aug 16 12:30:08 2011 CET
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2011 storage pledge. [see 20110315 report.
- CREAM CE deployment preparations
- HammerCloud [20110531]
- Security News [20110621]
- [20110524] UVic and Toronto participated in SSC5 (23 May - 03 June 2011) - final reports to be sent to SSC5
- [20110616] EGI CSIRT ADVISORY [EGI-ADV-20110615-02] Vulnerability for LRMS (details to be posted later)
- gLite News [20110705]
- [20110705] [https://operations-portal.egi.eu/broadcast/archive/id/420][EGI Trust Anchor release 1.40-1] is now final - please install.
- [20110504] [https://operations-portal.egi.eu/broadcast/archive/id/378 ][gLite 3.2 WN release] has an important known issue detailed here: http://glite.cern.ch/glite-WN/known_issues
- [20110627] New IGTF distribution (certificates) and version 3 of the CRL retrieval tool Fetch-crl https://dist.eugridpma.info/distribution/util/fetch-crl3/
. Version 1.39 was updated to 1.40 on 2011-06-28.
- [20110628] [https://operations-portal.egi.eu/broadcast/archive/id/410][gLite 3.2 update 30 release] The highlights of the update are:
- New version of glite-BDII_top
- New version of glite-CREAM (to support changes for SGE)
- New version of glite-LB
- New version of glite-SGE_utils
- ROC_Canada News [20110809]
- Squid Deployment [20110329]
SAM Results
- site service status via Gridview
- Please check your site
- August 2011 Detailed Site Information (valid until 20110831):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
McGill
Recent Issues
Outstanding Issues
Recent Issues
- production job issues
- See "Production" Activities section below
- analysis job issues
- see "Notes" section below
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
- production job issues
- See "Production" Activities section below
- analysis job issues
- See "Notes" section below
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):
--
LeslieGroer - 2011-08-22
This topic: AtlasCanada
> T2WeeklyReport20110823
Topic revision: r2 - 2011-08-22 - LeslieGroer