Tier1 and Tier-2 Weekly Report 2012-02-14

General News

  • ADC and ATLAS Computing News [20120214]
    • ADC Weekly meeting
    • Outcome of Chamonix workshop:
      • Run at 4 TeV and 50ns bunch spacing. Expect 15 fb-1 in 2012.
    • MC Production:
      • MC11 campaign(s) ramping down (Sept 2011 - now)
        • MC11: total of around 1.6B fullsim G4 & 3B digi+reco; and 1.4B AF-II HITS and 1.4B digi+reco
        • Last of the bulk MC11c submitted and completing now
        • Still getting new MC11 (and MC10) requests - several 100M expected. Hope to keep the grid busy
      • MC12 campaign - 8 TeV, high-pileup
        • Start beginning of March. Hope to have 500M events for summer conferences
    • Queue config changes for LFC registration by Panda Server (copytool=lcgcp2 and lfcregister=server have been applied to DE/IT/NL/TW sites)
    • AMOD report
      • Worldwide production dropping off at the end of last week (see above)
      • ATLAS ddmadmin certificate expired Feb 11 - many DDM transfers failed (1.1M). Procedural checks for the future to not miss updating all machines that need this proxy.
      • Schedconfig issue on Feb 6 caused IT/TW cloud outages - postmortem and solutions underway
        • Failure caused when queue config files are missing from the SVN local copy, they are assumed to be removed, and the corresponding queue in the DB is deleted. When queues come back set to defaults.
      • ADCR/ATLR database Oracle security updates on Feb 7th - few minutes and no issues
      • Some Pandamon issues continue. 2 of 6 servers offline to prevent session count overload errors
    • PanDA Database updates planned to relieve the DQ2 system of the transient datasets details
    • Discussion about AthenaMP
      • https://twiki.cern.ch/twiki/bin/view/Atlas/AthenaMP
      • Various tests going on: With AthenaMP we have much smaller overall memory footprint than with N serial Athena jobs run in parallel
      • Memory spikes at end of jobs still an issue (large objects created)
      • In order to compete in CPU performance with N serial Athena jobs run in parallel, AthenaMP jobs have to become longer, i.e. run over multiple input files instead of one
        • Rule of thumb: At least N input files for N worker AthenaMP
      • AthenaMP can utilize hyperthreading (Nprocessing sweet spot between N and 2*N)
      • Reconstruction validation going well, apart from issue with repeated GUIDs
      • G4 simulation has a few issues in nightlies
      • Pileup works but not validated
      • Evgen not tried yet. No sense in merge jobs as already do merging.
      • No one working on analysis jobs
      • Validation of reco going on minicluster at CERN (100 nodes, 8-cores, 15 process AthenaMP jobs)
    • ADC Management changes
      • Guido Negri (CERN) joined CERN Data Processing Team
      • Jaroslava Schovancova (CERN) finished her term as ADC (CERN) co-coordinator
      • Alexei Sedov (PIC) is appointed as ADC-CERN co-coordinator
      • Jae Yu (UTA) will continue to co-coordinate ADC-CERN
      • Yuri Smirnov (BNL) joined Software Releases Group
      • Outcome of Production System Technical Meeting (Feb 1-2, 2012)
        • Rod Walker apointed as Grid Data Processing coordinator (Kaushik De (UTA) and Pavel Nevski (BNL) finished their term as GDP co-coordinators)
        • Set up Production System software development steering group (K. De, A. Klimentov, R. Walker), reporting to ADC SW Coordinators
        • We have more and more GDP tasks. Rod will prepare a list of tasks and how they will be shared between ADCoS, AMOD, GDP Operations.
        • Extra manpower is needed for GDP operations and SW development. Several key people left or will leave Grid Data Processing in 2012
        • ATLAS Distributed Computing Technical Interchange Meeting at LAPP, Annecy, April 18-20
    • Automatic queue exclusion based on downtimes of SRM or CE - machinery is basically ready and to be tested with the real downtimes (to be reported next week)
    • T2 Data Acceptance status - Feb 2012
    • T1 Tape System metrics added to SLS
    • LFC migration schedule
      • UK cloud (RAL) : February 13-15th
      • ES cloud (PIC) : February 27-29th
      • FR cloud (IN2P3-CC) : March 20-22th

  • CA Cloud Squad Actions [20120214]
    • DaTRI requests approved / processed (last week)
SITE NumRequests NumDatasets NumSubscribed SizeofAllDatasets (GB)
AUSTRALIA-ATLAS-LOCALGROUPDISK 3 185 184 1230
AUSTRALIA-ATLAS_SCRATCHDISK 0 0 0 0
CA-ALBERTA-WESTGRID-T2_SCRATCHDISK 0 0 0 0
CA-MCGILL-CLUMEQ-T2_SCRATCHDISK 0 0 0 0
CA-MCGILL-CLUMEQ-T2_LOCALGROUPDISK 0 0 0 0
CA-SCINET-T2_LOCALGROUPDISK 0 0 0 0
CA-SCINET-T2_PHYS-TOP 0 0 0 0
CA-SCINET-T2_SCRATCHDISK 0 0 0 0
CA-VICTORIA-WESTGRID-T2_LOCALGROUPDISK 0 0 0 0
CA-VICTORIA-WESTGRID-T2_PHYS_EXOTICS 0 0 0 0
CA-VICTORIA-WESTGRID-T2_SCRATCHDISK 0 0 0 0
SFU-LCG2_LOCALGROUPDISK 1 222 222 554
SFU-LCG2_PHYS-SM 0 0 0 0
SFU-LCG2_SCRATCHDISK 0 0 0 0
TRIUMF-LCG2_LOCALGROUPDISK 1 65 65 6334
TRIUMF-LCG2_SCRATCHDISK 0 0 0 0
TRIUMF-LCG2_PERF-TAU 0 0 0 0

  • WLCG and General Computing News
t2_reliability_201201.png

SSB Results

SSB PanDA Test Queue Availability (month) - this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).

SAM Results

  • site service status via Gridview - Please check your site

APEL Accounting

APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

McGill

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

TRIUMF

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Production

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):

 ------------------------------------------------------------------------

   World-wide weekly ATLAS ADCoS summary (Feb.7-13,2012)
________________________________________________________________________

I. General summary:
   ---------------

A)  During the past week (Feb.7-13,2012) Panda production service
   - completed 952,336 managed group, MC production, validation
     and reprocessing jobs
   - average ~136,080 jobs per day
   - failed 74,326 jobs
   - average efficiency:
      -- jobs  ~92.8%
   - active tasks: 813
      -- distribution by cloud:
    CA:32 CERN:35 DE:71 ES:25 FR:81 IT:25 ND:159 NL:48 TW:20 UK:64 US:253

B)
   - New "Frozen showers" DB Release 17.8.1 subscribed to sites, Feb.7.
   - New DB Release 17.9.1 subscribed to sites, Feb.10.
   - New DQ2 Clents Stable Release 1.0.0 announced, Feb.13.
   - CERN: ATLR,ADCR DB intervention (~3h.) completed, Feb.7.
   - CERN: ATONR DB intervention (~2h.), Feb.9.

II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
    -------------------------------------------------
1) Tue Feb.7

+ CA/TRIUMF job f./Failed to connect to service sqlite200/ALLP200.db(coral
  :Exception).GGUS 78971 solved:removed the frontier squid server from the
  proxy list of CVMFS.CORAL Errors stopped.

2) Wed Feb.8

+ CERN/ATLAS_DDM_VOBOXES degraded(50%).Elog 33629,33631,33632:dq2 config.
  has been retrofited,errors stopped.
- CERN/PandaMon voatlas140|1 unavailable in SLS monitoring.Savannah 91324

3) Thu Feb.9

+ CERN/ATLAS DDM vobox ss-lyon(atlas-SS02) availability 30%.Fixed.Elog
  33664,33665.Remote-power-control reset used leading to the reactivation
  of the node.
+ CA/CA-ALBERTA-WESTGRID-T2 60+ job f./No space left on device.GGUS 79083
  solved:problematic WN cl1n058.nic.ualberta.ca offlined.

4) Fri Feb.10

+ CERN/PandaMon 2 nodes voatlas140,141 removed from production.Elog 33728.

5) Sat Feb.11
   -> Cloud/site PROD efficiency ever<50% : FR,CA,US
   -> Cloud/site DDM  efficiency <50% : CA,ES,CERN,FR,IT,ND,NL,TW,US,UK
     ..............................
+ CERN/DDM robot cert.expired causing FTS problems.Fixed.Elog 33744,47,48,
  51.


7) Mon Feb.13

+ CERN/Panda-Mon voatlas139 stops,re-installation to be done.Elog.33780.
+ CERN/Victor machine ddmadmin certificate updated manually.Elog.33779.
+ UK cloud set offline due to LFC consolidation on Feb.14.Savannah 126321.

III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
    (++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------
-- 17.1.1.3 valid1 digi+reco task 706286,706597-706603 failures:TRF_
 UNKNOWN |"Could not get event info"|"finaliseEvent() Failed".Savannah
 91277:SampleT production - PHYSICS - a147.All jobs failed multiple
 attempts at various sites in IT,NL,DE,FR,CA clouds.Task 706286 ABORTED,
 others "failed".No comments published.

++ 17.1.1.3 valid1 digi+reco tasks from the region 706285-706386 failures:
 TRF_DBREL_VERSION |"Wrong DBRelease version: 17.5.1.Need at least version
 17.6.2".Savannah 91276:SampleT production - PHYSICS - a148.Many jobs
 failed in various clouds/sites.Tasks aborted.To be redefined.

++ 17.0.5.6.2 data11 reco task 706941 failures:Unspecified error,consult
 log file.Non-zero failed job return code: 1 (athena_stdout.txt does not
 exist).Savannah 126197:group production Exotics;TaskType2=reco.Many jobs
 failed at CA/TRIUMF.Task is DONE,next attempts succeeded.


-- LeslieGroer - 2012-02-13

Topic attachments
I AttachmentSorted descending History Action Size Date Who Comment
PNGpng t2_reliability_201201.png r1 manage 241.4 K 2012-02-13 - 17:20 LeslieGroer  
PNGpng p2dp_20120213.png r1 manage 21.7 K 2012-02-13 - 17:20 LeslieGroer  
Edit | Attach | Watch | Print version | History: r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r3 - 2012-02-14 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback