Tier1 and Tier-2 Weekly Report 2012-04-17

General News

  • ADC and ATLAS Computing News [20120417]
    • ADC Weekly meeting
    • Technical stop April 20-27. Planning Fast Reprocessing of all data to then (expect about 140M events)
    • Annecy meeting starts this week
    • Rod W. been testing glideinWMS on DE, UK, NL, TW clouds
    • Degradation of network into/out of CERN on Thursday from around 4-7pm CET - many knock on effects (registration failures, lost heartbeats, etc)
      • GEANT knew about this but did not communicate to CERN for a day
    • Tue pm: Power failure (twice) at TRIUMF. CA cloud taken offline Wed ~1-9am, recovery thru Wed. GGUS:81100
    • Thu pm: TRIUMF-US networking problems, worked by BNL/ESnet/TRIUMF, manifesting as transfer errors. Resolved early Fri am; network problem on the dedicated circuit between TRIUMF and BNL. GGUS:81111 GGUS:81213
    • Sat pm: BNL-ATLAS transfer errors due to expired certificate. Resolved in 90min. GGUS:81281
    • MC12 campaign fully underway (some mc11 at low priority)
      • G4 - started 1st week of March (only Prio0 and 1 requested/submitted so far):
      • MC12 G4 rate above 10M per day (i.e. not counting ongoing MC11 requests)
        • Priority 0: fullsim 504M requested; 72% done ; AF-II 91M requested; 12% done
        • Priority 1: fullsim 51M requested; 51% done
      • Digi+Reco – bulk production started 15th April (Prio 0&1 perf. + Prio0 physics)
        • using new random number service (expect 20% speedup at high mu)
        • running with 3.8 GB memory, some improvements on memory leaks (TRIUMF has a soft limit causing an issue?)
        • pileup samples distributed to T1's and some T2's (in progress)
        • slow startup due to many group production tasks (~10k tasks)
    • Train model for D3PD being developed - hopefully in production for all groups in couple months. Reduce number of tasks.
    • Frontier, CVMFS and Squid monitoring being added to SSB
    • We should be relying only on AGIS now, and not any longer on DQ2-ToA
    • McGill accepted as T2D at least for data placement. Need to push on GROUPDISK now. Also define FTS channels.

  • CA Cloud Squad Actions [20120417]
    • User DaTRI requests approved / processed (last week)
    • Declared Downtimes
      • Australia-ATLAS/ UNSCHEDULED downtime (OUTAGE) [12-04-2012 13:00 to 13-04-2012 01:00 UTC] - DNS service provider outage has made our site inaccessible
      • TRIUMF-LCG2/ SCHEDULED downtime (OUTAGE) [12-04-2012 17:30 to 12-04-2012 20:00 UTC] - Migrate CE2 to EMI CREAM CE
      • CA-SCINET-T2 SCHEDULED downtime (OUTAGE) [18-04-2012 13:30 to 19-04-2012 23:59 UTC ] - Cooling and power shut down for upgrades to data centre and reconfiguration of internal network
    • HammerCloud autoexclusions
      • ANALY_ALBERTA-WG1 reset online at Thu Apr 12 10:00:09 2012 CET
      • CA-ALBERTA-WESTGRID-T2 reset online at Thu Apr 12 22:31:30 2012 CET
      • ANALY_AUSTRALIA reset online at Fri Apr 13 08:00:13 2012 CET
      • SFU-LCG2 Auto-Excluded at Fri Apr 13 23:31:26 2012 CET
      • SFU-LCG2 reset online at Sat Apr 14 02:31:07 2012 CET
      • Australia-ATLAS reset online at Sat Apr 14 05:31:12 2012 CET
      • ANALY_AUSTRALIA Auto-Excluded at Sun Apr 15 16:01:26 2012 CET
      • Australia-ATLAS Auto-Excluded at Sun Apr 15 16:02:57 2012 CET
      • Australia-ATLAS reset online at Sun Apr 15 16:30:59 2012 CET
      • ANALY_AUSTRALIA reset online at Sun Apr 15 17:00:11 2012 CET
      • ANALY_AUSTRALIA Auto-Excluded at Mon Apr 16 14:31:40 2012 CET
      • ANALY_SFU_bugaboo Auto-Excluded at Mon Apr 16 15:01:03 2012 CET
      • ANALY_SFU_bugaboo reset online at Mon Apr 16 16:00:12 2012 CET
      • ANALY_AUSTRALIA reset online at Mon Apr 16 16:00:13 2012 CET
      • ANALY_AUSTRALIA Auto-Excluded at Mon Apr 16 14:31:40 2012 CET
      • ANALY_VICTORIA-WG1 Auto-Excluded at Tue Apr 17 03:31:30 2012 CET
      • ANALY_VICTORIA-WG1 reset online at Tue Apr 17 07:00:11 2012 CET
    • other cloud squad related savannah and / or ROC ggus tickets [20110705]
      • panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
  • Open Issues and Ongoing Discussions

  • WLCG and General Computing News [20120221]

SSB Results

SSB PanDA Test Queue Availability (month) - this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).

SAM Results

  • site service status via Gridview - Please check your site

APEL Accounting

APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

McGill

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

TRIUMF

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Production

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):

     World-wide weekly ATLAS ADCoS summary (Apr.10-16,2012)
________________________________________________________________________

I. General summary:
   ---------------

 A)  During the past week (Apr.10-16,2012) Panda production service
     - completed 1,258,204 managed group, MC production, validation
       and reprocessing jobs
     - average ~179,743 jobs per day
     - failed 113,590  jobs
     - average efficiency:
        -- jobs  ~93.5%
     - active tasks: 739
        -- distribution by cloud:
  CA:43 CERN:36 DE:90 ES:47 FR:133 IT:37 ND:57 NL:58 TW:27 UK:75 US:136 

B)  - CA/TRIUMF-LCG2 DT (CE,SE,SRM,BDII,LFC OUTAGE:power outage), Apr.10.
     - CA/TRIUMF-LCG2 DT (CE2 OUTAGE:migrate CE2 to EMI CREAM CE), Apr.12.
     - ND/NDGF-T1 DT (SE,SRM warning:OPN down to Finland), Apr.11,16.
     - TW/TAIWAN-LCG2 DT (SE,SRM OUTAGE:CASTOR down), Apr.11-12.
     - UK/RAL-LCG2 DT (SE,SRM warning:disk servers lost network),Apr.12-13
     - FR/IN2P3-CC DT (SE,SRM OUTAGE:Dcache server overloaded),Apr.15-16.
     - Trigger reprocessings launched, Apr.13,16.
     - New DDM Rucio clients announced available for testing, Apr.11.
     - New new DB Releases 19.0.1,19.1.1 subscribed to sites, Apr.11,13.

II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
    -------------------------------------------------------------------

1) Tue Apr.10
     -> Cloud/site PROD efficiency ever<50% : CA/TRIUMF

+ CA/TRIUMF-LCG2 FT f./SOURCE:SECURITY_ER./CN=Robot proxy expired.GGUS
  81111 solved:FTS was down for long time due to power cut + 1 DDN
  controller broken.Fixed Apr.11.But 6|4h T0 export FT f./globus_gass_copy
  _register_url_to_url transfer timed out,Apr.12,FT f./SOURCE:CONN.:SRM on
  Apr.13.Network connectivity TRIUMF-BNL restored,Apr.14.
+ CA/TRIUNF_LCG2 frontier down.GGUS 81100 solved:power transformer+UPS
  were broken,plus some ORACLE DB issues.Fixed,Apr.11. 

3) Thu Apr.12
     -> Cloud/site DDM efficiency <50% : TW(UDT),CA/AUSTRALIA-ATLAS
       ............................................
+ CERN/network disruption/firewall overload cused by h/w problem with
  GEANT router in Geneva affected DB replication,FT,"lost heartbeat" job
  failures.Elog.35142,44,48,50.
+ CERN/Central Catalogue voatlas69 0% availability:expected due to work in
  progress.Also affects atlddm16,can be ignored.Elog.35134,35138.
+ CA/AUSTRALIA-ATLAS 3K+|h FT f./DEST.:CONN.:SRM.GGUS 81187 solved:
  experienced a DNS service provider outage,fixed Apr.13.
- DE/UNI-FREIBURG many FT f./SOURCE file doesn't exist.Savannah 93604,
  93445:known,due to accidental deletion of "fake dark data" (due to
  problem in the consistency tool script after the migration to long SURLs
  in Panda).Assigned to DE squad,Apr.5.Many lost files deleted,hopefully
  soon get some full list to declare the rest lost(update Apr.13). 

4) Fri Apr.13 
+ US/BNL-OSG2 FT f./SOURCE:CONN.:SRM.GGUS 81213 solved:SRM works well.
  Errors due to the network issue.Many FT f. TRIUMF<->BNL since noon EDT
  Thursday,SRM server at TRIUMF isn't reachable from the BNL FTS server
  due to network problems close to TRIUMF,affected also AUSTRALIA,SARA,
  GOEGID.Connectivity TRIUMF-BNL restored at ~18:30 UTC,Apr.13.

5) Sat Apr.14 
+ US/BNL-OSG2 2370 FT f./SOURCE:the certificate has expired.GGUS 81281
  solved:certificate was renewed the same day,transfers resumed,no errors. 

III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
      (++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------

-+ 16.6.8.3 mc11_7TeV evgen tasks 761934-762075 failures:TRF_UNKNOWN |
 'Herwig++ error.: Could not access element 1 of the reference vector
 "Outgoing" for the object "HPConstructor" because the index was outside
 of the allowed range.'Savannah 127774:MC11 production - SUSY.All jobs
 failed multiple attempts in different clouds.Tasks ABORTED and will
 follow up with the requester.Looks like some JO problem from the
 information provided.New 103 tasks from the region 777967,778358-778498
 affected and 100% fail,Apr.16.T.777967 is in "submitting" state,others
 seems to be ABORTED.

-+ 17.0.6.4.7 data11_7TeV Reco merge tasks 762407-762891 failures:Type
 Error:expected string or buffer.Savannah 127803:group production Higgs
 HSG5;TaskType2=reco.All jobs failed multiple attempts in various clouds.
 Tasks ABORTED.Under investigation.

-+ 17.0.6.4.8 data11_7TeV Reco merge task 763516-764001 failures:ATH_
 FAILURE - Athena non-zero exit.SyntaxError: invalid syntax.Savannah
 127822,93652:group production Higgs HSG2;TaskType2=reco.Massive 100% job
 failures in various clouds due to the error on the AODtoDPD step in the
 very beginning coming from DPDMaker HSG2DPDUtils (sounds like the invalid
 syntax/wrong parameter value?).All tasks together with the child tasks
 764002-764486 ABORTED.Under investigation.

-+ 17.2.1.3 data12_8TeV Reco merge tasks 762369-762376 failures:TRF_
 UNKNOWN |"jetFlags.inputFileType != RDO and CaloCal TopoCluster doesnt
 seem to exist".Savannah 127823:group production TRIGGER L1CALO:Most of
 jobs failed repeatedly in CERN cloud/region.Tasks 762369-73 set to
 "finished",763374-76 "failed".Perhaps need a protection implemented in a
 cache.Looks like a problem with the ESD to DESD_MBIAS transform.

-+ 17.2.1.4 data11_7TeV Reco task 778095 Reco failures:ATH_FAILURE -Athena
 non-zero exit.Savannah 127869:group production TRIGGER HLT.All(~4.5K)
 jobs failed at CERN-RELEASE.Task ABORTED,no comments published.


-- LeslieGroer - 2012-04-17


This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20120417
Topic revision: r1 - 2012-04-17 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback