Tier1 and Tier-2 Weekly Report 2012-08-07
General News
- ADC and ATLAS Computing News [20120807]
- ADC Weekly meeting
- 10fb^-1 collected already - about 1 fb^-1 per week
- Some discussion about the EMI statements about glite3.2 support going away October (no security support since Aug 1; possible shutdown of sites at glite 3.2 in November)
- Still some critical pieces (DPM, WN) not supported fully under EMI-2 yet
- Official statement from ATLAS still being worked on, but upshot is most services probably can (and should) migrate this year to EMI-2.
- Investigation of slow data transfers from GRIF-LAL and IN2P3-LPC to TOKYO (FR cloud) - affecting some cloud operations
- Proved to be more systematic to all sites since Dec 20
- Possibly due to move to LHCONE and/or new pool servers that need tweaking
- Some correlations can be seen in SSB looking at SONAR and perfSONAR testing
- New WLCG Networking Group being created
- Problems with partial update in SchedConfig database caused 50% of IN2P3 data not to be registered in LFC
- CA Cloud Squad Actions [20120626]
- User DaTRI requests approved / processed (last week)
- Declared Downtimes
- CA-VICTORIA-WESTGRID-T2 SCHEDULED downtime (OUTAGE) [31-07-2012 15:00 to 01-08-2012 23:59 UTC] - LHCONE migration, BNT maintenance, and other cluster activities
- CA-VICTORIA-WESTGRID-T2 UNSCHEDULED downtime (OUTAGE) [01-08-2012 18:30 to 01-08-2012 23:59 UTC ] - network tests on pool nodes
- CA-ALBERTA-WESTGRID-T2 SCHEDULED downtime (OUTAGE) [03-08-2012 15:00 to 03-08-2012 23:00 UTC ] - Internal management switch maintenance -- downgrade software
- HammerCloud autoexclusions
CA-SCINET-T2 reset online at Tue Jul 31 21:32:10 2012 CET
CA-VICTORIA-WESTGRID-T2 reset online at Wed Aug 1 06:01:50 2012 CET
IAAS reset online at Wed Aug 1 06:01:51 2012 CET\
CA-VICTORIA-WESTGRID-T2 reset online at Wed Aug 1 22:01:45 2012 CET
IAAS reset online at Wed Aug 1 23:02:31 2012 CET
ANALY_VICTORIA-WG1 reset online at Thu Aug 2 01:00:12 2012 CET
ANALY_VICTORIA-WG1 Auto-Excluded at Thu Aug 2 10:33:06 2012 CET
ANALY_VICTORIA-WG1 reset online at Thu Aug 2 12:00:08 2012 CET
ANALY_MCGILL Auto-Excluded at Thu Aug 2 19:33:20 2012 CET
CA-MCGILL-CLUMEQ-T2 Auto-Excluded at Thu Aug 2 20:06:19 2012 CET
ANALY_SCINET Auto-Excluded at Thu Aug 2 20:33:53 2012 CET
ANALY_MCGILL reset online at Thu Aug 2 23:00:18 2012 CET
CA-MCGILL-CLUMEQ-T2 reset online at Thu Aug 2 23:02:26 2012 CET
ANALY_SCINET reset online at Fri Aug 3 02:35:14 2012 CET
CA-SCINET-T2 Auto-Excluded at Fri Aug 3 14:36:02 2012 CET
ANALY_SCINET Auto-Excluded at Fri Aug 3 17:32:55 2012 CET
CA-SCINET-T2 reset online at Fri Aug 3 19:01:23 2012 CET
ANALY_SCINET reset online at Fri Aug 3 19:30:09 2012 CET
IAAS Auto-Excluded at Sat Aug 4 03:38:10 2012 CET
ANALY_VICTORIA-WG1 Auto-Excluded at Sat Aug 4 04:01:49 2012 CET
CA-VICTORIA-WESTGRID-T2 Auto-Excluded at Sat Aug 4 05:35:20 2012 CET
CA-VICTORIA-WESTGRID-T2 reset online at Sun Aug 5 01:02:35 2012 CET
ANALY_VICTORIA-WG1 reset online at Sun Aug 5 01:31:25 2012 CET
IAAS reset online at Sun Aug 5 06:03:42 2012 CET
IAAS Auto-Excluded at Sun Aug 5 18:32:49 2012 CET
IAAS reset online at Sun Aug 5 20:02:26 2012 CET
ANALY_SFU_bugaboo Auto-Excluded at Tue Aug 7 17:33:32 2012 CET
SFU-LCG2 Auto-Excluded at Tue Aug 7 17:36:32 2012 CET
ANALY_SFU_bugaboo reset online at Tue Aug 7 19:00:27 2012 CET
SFU-LCG2 reset online at Tue Aug 7 20:01:47 2012 CET
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2012 storage pledge.
- HammerCloud [20120214]
- Security News [20120801]
- gLite/EMI News [20120801]
- EGI CSIRT ADVISORY [EGI-ADV-20120801] concerning gLite 3.2 middleware components no longer supported on 01 August 2012.
- ROC_Canada News [20120710]
- Current shift - Andrew Wong 7-10 Aug, 2012
- Next Week - Sergey Chelsky
- WLCG and General Computing News [20120221]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):
World-wide weekly ATLAS ADCoS summary (Jul.31 - Aug.6,2012)
________________________________________________________________________
I. General summary:
---------------
A) During the past week (Jul.31 - Aug.6,2012) Panda production service
- completed successfully 1,438,725 managed group, MC production,
validation and reprocessing jobs
- average ~205,532 jobs per day
- failed 110,097 jobs
- average efficiency:
-- jobs ~93.5%
- active tasks: 749
-- distribution by cloud:
CA:55 CERN:131 DE:106 ES:36 FR:52 IT:80 ND:48 NL:33 TW:52 UK:85 US:71
B) - ND/NDGF-T1 DT (SE,SRM warning:1 pool server down,h/w),Jul.30-Aug.1
- ND/NDGF-T1 DT (SE,SRM warning:dCache update), Jul.31.
- NL/NIKHEF DT (CE OUTAGE:maintenance CreamCEs), Jul.31.
- ND/NDGF_T1 DT ( SE,SRM warning:2 ATLAS pools down), Aug.1-3.
- ES/PIC DT (CE08 OUTAGE:CE migration to EMI), Aug.3-7.
- FR/IN2P3 DT (ce-05,06 OUTAGE:GridFTP issues), Aug.3.
- TW/TAIWAN-LCG2 DT (SE,SRM OUTAGE:Castor DB reconfig/upgrade),Aug.6
- New DB release 20.0.1 subscribed to sites, Aug.2.
- NEw OSG Software version 3.1.7 was announced, Jul.31.
- New TRF caches AtlasProduction 17.2.4.6(32+64b),16.6.9.13(32+64b),
17.0.6.17(32+64b),AtlasPhysics 17.2.4.3.1(32+64b) were distributed
II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
-------------------------------------------------------------------
1) Tue Jul.31
-> Cloud/site PROD efficiency ever<50% : ND(NDGF-T1 SD SRM warning)
-> Cloud/site DDM efficiency <50% : -
........................................
- ND/NDGF-T1 job f./Failed in data staging:failed checking source replica
file/TRF not installed in CE.GGUS 84690 in progress:problem in Oslo,"at
risk" storage issue.Still f.,Aug.1-2.
+ DE/UNI-BONN_LOCALGROUPDISK FT f./GRIDFTP_ER.:Unable to connect to
grid-ftp1.physik.uni-bonn.de.GGUS 84660 verified:the problem is fixed.
+ UK/UKI-NORTHGRID-MAN-HEP FT f./DEST.:CONN.:SRM.GGUS 84673 solved: 20K|
4h FT f.,site blacklisted:Savannah 130780.Services retarted,however
the system for some reason has become really unstable for the past two
weeks.Dropped the request table and reduced the number of analysis jobs
as preventive measure.Transfer eff. is 100%,Aug.4.
+ UK/UKI-NORTHGRID-SHEF-HEP FT f.+squid down due to power cut.UDT set in
GOCDB,Jul.31 10-12:00.Elog.38090-38092.
- US/BU_ATLAS_TIER2 again ~800|4h deletion errors.GGUS 84189 reopened:
reduced number <100|4h of err.,Aug.1.
2) Wed Aug.1
-> Cloud/site PROD efficiency ever<50% ND/ARC
-> Cloud/site DDM efficiency <50% : ND/NDGF-T1_MCTAPE
................................................................
+ DE/UNI-FREIBURG_DATADISK FT f./SOURCE:AsyncWait.GGUS 84691,84692
verified:some pools crashed overnignt,rebooted.
+ US/NERSC SCRATCHDISK,LOCALGROUPDISK still FT f./SOURCE+DEST.:Checksum
mismatch.GGUS 84466 updated,solved:Bestman updated,adler32 checksum
configuration works,no checksum err.anymore.
+ US/AGLT2 50%|4h FT f./No markers indicating progress received for more
than 180s.GGUS 84714 solved:had troubles on 3 dCache file servers
overnight,plus some afs issues.Fixed the same day.
+ IT/INFN-PAVIA Frontier/squid not responding.GGUS 84712 solved:squid
disk was full,increased space,restarted.Frontier mon.still red,Aug.2.
- NL/WEIZMANN-LCG2_DATADISK 50% FT f./DEST.:SRM_FAILURE.GGUS 84722
assigned:problem seen in the past:GGUS 83682,84187.Checksum calc does
not finish in time.Waiting for a fix to lustre that will allow the
"on-the-fly" checksum algorithm to be deployed.Still FT f.,Aug.6.
3) Thu Aug.2
-> Cloud/site PROD efficiency ever<50% : CA
-> Cloud/site DDM efficiency <50%:ND/NDGF-T1_MCTAPE,IT/INFN-BOLOGNA
............................................
+ CERN/ATLAS-AMI monitoring not updated,solved.Elog.38153,38159.
+ ND/NDGF-T1-MCTAPE FT f./SRM_FAILURE:Failed to pin file rc=149,msg=No
pool candidates available/configured/left for stage.GGUS 84741 solved:
the file was at the tape pool that was down during the night.Fixed.
+ IT/INFN-GENOVA FT f./DEST.:CONN.:SRM.GGUS 84734 solved:connectivity
problems due to a planned upgrade of the network infrastructure of the
provider(GARR),completed at 8pm,Aug.2.
+ IT/INFN-BOLOGNA-T3 FT f./DEST:HTTP_TIMEOUT:SRM.GGUS 84737 solved:SE
under heavy load,rebooted:the load decreased.
+ NL/TECHNION-HEP_LOCALGROUPDISK FT f./DEST.:Checksum mismatch.GGUS 84736
solved:500+ FT f./DEST.:Space Management step in srmPrepareToPut failed
Aug.4:due to no inodes left on Lustre f/s,files are deleted to clear
this error.100% eff.since Aug.4.
- NL/TR-10-ULAKBIM still 65% FT f./AGENT er.:no status updates received.
GGUS 84514 in progress updated:FTS server at SARA issue?Cloud-squad
informed.
+ DE/PRAGUELCG2 FT f./SOURCE:CONN.:SRM.GGUS 84738 solved the same day.
- DE/UNI-FREIBURG FT f./SOURCE:AsyncWait.GGUS 84765 in progress:3K|4h FT
f./SOURCE:HTTP_TIMEOUT:SRM,Aug.4.Blacklisted:Savannah 130910,pool with
some hotfiles crashed,trying to deal with the data (lost vs.restore),
Aug.6.
- CA/CA-ALBERTA-WESTGRID-T2 many analy job f./lost heartbeat.GGUS 84746
on hold:no plitots,low activity.The fairshare and no spare cores
available since much more WestGrid submitted in the shared system.
Moreover,quite a few of WN failing since the internal switch issue.
Contacting vendor to downgrade the switch s/w.A permanent solution is
to split the shared environment and maintain an independent ATLAS
computing environment.But since it's related to the WestGrid part
upgrade progress which is facing some beta testing issues,have to wait
for a while (weeks).
- CA/CA-SCINET-T2 all FT f./DEST.:CONN.:SRM.GGUS 84772 assigned:suspect
problems communicating with the TRIUMF LFC/FTS in the CA cloud.
+ CA/CA-MCGILL-CLUMEQ-T2 all FT f./DEST.:CONN.:SRM.GGUS 84773 solved:BGP
fail-over issues affected not only CA-McGill,but also SARA+CA-SCINET.
Fall back to earlier settings,fixed,Aug.3.
+ CA/TRIUMF-LCG2->NIKHEF all FT f./GRIDFTP_ER.:server err.426.GGUS 84774
solved:some issues with the light path between TRIUMF and SARA fixed.
4) Fri Aug.3
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : -
............................................
+ IT/INFN-NAPOLI-ATLAS FT f./DEST.:SRM_ABORTED.GGUS 84776 solved:partial
network outage,network restarted.No errors,Aug.3.
+ ES/IFIC-LCG2_PHYS-SUSY FT f./DEST.:No free space on Storage Area.
Savannah 130895,GGUS 84805 solved:space available published for token
was correct,an internal StoRM(SRM) value for available space was
incorrect,so file writing wasn't possible.Adjusted values in StoRM(SRM)
DB.Fixed,Aug.4.
5) Sat Aug.4
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : TW
..............................
- TW/TAIWAN-LCG2_MCTAPE FT f./DEST.:Unable to issue PrepareToPut request
to Castor.GGUS 84811,84696 in progress:TW DATATAPE excluded from data
distribution.Also 1K+ FT f./DEST.:ORACLE data block corrupted.1K+ job
f./Get:DB err.,ORACLE block corrupted.Could be solved after castor
intervention,Aug.6.
+ IT/INFN-MILANO-ATLASC 500+ job f./lost heartbeat.GGUS 84808 solved:/var
on CE reached 100% of occupation and caused job f.,recovered.
+ CA/CA-VICTORIA-WESTGRID-T2 1000s FT f./DEST.:CONN.:SRM.GGUS 84809
solved:problem was that Jetty could not dispatch a new connection to
the thread pool,because the thread limit was reached.Fixed,Aug.5.
- DE/UNI-FREIBURG 3K FT f./DEST.:HTTP_TIMEOUT:SRM.GGUS 84810,84765 in
progress:blacklisted in DDM,Savannah 130910.Pool with some hotfiles
crashed,trying to deal with the data (lost vs. restore),Aug.6.
+ FR/IN2P3-LAPP 750 FT f./DEST.:CONN.:SRM.GGUS 84816 solved:possible
trancient issue,no errors on Aug.6.
6) Sun Aug.5
-> Cloud/site PROD efficiency ever<50% : TW
-> Cloud/site DDM efficiency < 50% : -
........................................
+ CERN/LCRG DB affected Prod.task monitoring(delay ~4h).Fixed:INC151675,
Elog.38229,38230,38261,38262.
+ UK/UKI-SOUTHGRID-CAM-HEP FT f./DEST.:CONN.:SRM.GGUS 84817 solved:dpm
server process on SE had crashed,rebbot halped.No errors,Aug.6.
7) Mon Aug.6
-> Cloud/site PROD efficiency ever<50% : TW(Taiwan-LCG2 offline)
-> Cloud/site DDM efficiency <50% : -
.......................................................
- ES/PIC_DATADISK<-T0 FT f./many FT f./GRIDFTP_ER.:globus_gass_copy_
register_url_to_url transfer timed out.GGUS 84833 in progress:had a
huge load on ATLAS pools due to data replication to a new h/w.Solved.
- NL/WEIZMANN-LCG2 All FT f./DEST.:SRM_FAILURE.GGUS 84722 assigned:
problem has been described on the older tickets(GGUS:83682,84187).The
checksum calc does not finish in time.Waiting for a fix to lustre that
will allow the "on-the-fly" checksum algorithm to be deployed.Still f.,
Aug.6.
- US/MWT2 FT f./SOURCE:CONN.:SRM.GGUS 84924 assigned.
- FR/GRIF-LAL FT f./SOURCE:The available CRL has expired.GGUS 84925
assigned.
III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
(++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------
-+ 17.2.4.2 mc12_8TeV evgen task 926129 failures:TRF_SEGFAULT | "Caught
signal 11(Segmentation fault).Savannah 130798,130714:MC12 production -
BTAGGING.Many job failures at various sites running for NL cloud.The
errors seem to be Generator-specific.Causing problem to other tasks
(t.926320 has 23K jobs waiting for input files).T.926123(still runnning)
affected too.Task 926129 set to "finished".
-- 17.2.4.2 mc12_8TeV evgen task 926131 failures:Caught signal 11
(Segmentation fault).Savannah 130899,130920,130714:MC12 production -
BTAGGING.Still 7734 (~30%) job failures in CA cloud.Task is still
"running".
-- 17.2.4.2 mc12_33TeV evgen tasks 918557,918558 failures:TRF_UNKNOWN |
"!! ALPGEN TERMINATES NORMALLY: NO MORE EVENTS IN FILE !!!".Savannah
94891,130498:MC12 production - PHYSICS.Still many jobs fail repeatedly
in ES,CA clouds.Tasks are still "running".Similar problem with t.927948,
927943-4,928993-4 still "running" in US,UK,DE,CA clouds.No comments
published.
-- 17.2.4.1 valid1 ValidateD3PD merge task 930383 failures:TRF_UNKNOWN |
"Unable to build inputFileSummary from any of the specified input files"
Savannah 96565:T1_McAtNlo_Jimmy.All jobs have failed up to 9-10 attempts
in a row each at various sites running for CERN cloud.Task is in
"failed" state.No comments added so far.
++ 17.2.3.7.1 data12_8TeV MergeNTUP tasks 929945-929947 failures:***glibc
detected *** hadd:free():invalid next size.Savannah 130896,130261:group
production TRIGGER L1CALO.All jobs have failed up to 9 attempts each at
different sites in FR,CA clouds.Similar problem with t.930045,930090,
930561.Tasks ABORTED, to be resubmitted with the new cache.
-+ 17.2.3.7.1 data12_8TeV MergeNTUP task 930038,41-43 failures:TRF_
OUTFILE - output file error.Savannah 130901,130262:group production MUON
TGC.Many multiple job failures at various sites in FR cloud.Tasks
ABORTED.Switching to a new p-tag,still working on a fix for NTUP
failures.
-+ 17.2.4.3 data12_8TeV Reco merge task 930307 failures:TRF_UNKNOWN |
'poolToObject: caught error: FID "B3320BF9-0E32-5842-956D-9893D85C39FF"
is not existing in the catalog.Savannah 130900:group production Exotics.
Many jobs failed repeatedly at various sites running for NL cloud.Task
is still "running",looks like a site issue.It seems no these failures
since August 4.
-- 17.2.4.5 mc12_8TeV evgen tasks 927781,927789,927790 failures:Sherpa_i
ERROR Unwanted ATOOLS::exception caught.Savannah 130908:MC12 production-
PHYSICS.Many job failures in ND cloud.Tasks are still "running".
--
LeslieGroer - 2012-08-07