Tier1 and Tier-2 Weekly Report 2012-09-18

General News

  • ADC and ATLAS Computing News [20120918]
    • 1M XP_Higgs events - most simul tasks completed/completing Task Ids
    • ADC Weekly meeting
    • 0.3 fb^-1 delivered last week. 15fb^-1 delivered/14 fb^-1 collected in 2012.
    • Stable p-Pb beams established during machine study period. Technical stop this week, ending Friday.
    • Discussions about ramping up luminosity ~9x10^33cm^-2s^-1.
    • LHC shutdown Dec 17 - Jan 7.
    • MC Production Status
      • Lifetime bug in fHerwig (MC12) affects 240M full sim and 115M AF-II. Bug fixed in MC12JobOptions-00-04-60 and e1499 and above. Rerunning samples after feedback from physics groups.
      • pp overlay production caused problems with Frontier access last week, investigation still going on
        • Overlay step (d735/d736) consists of overlay preparation, G4 simulation using data conditions and zero bias overlay *100 events/job: dictated by number of events in zero bias inputs
        • Reconstruction step (r3645) consists of plain reconstruction using data conditions. No digitisation is needed as this is done in the overlay
        • Currently running with 100 events/job: 1000 events/job has problems with memory, also bug when changing run number in run, which accumulates for 1000 events/job
        • Zero bias overlay inputs are quite large and only stored at US and UK T1
        • Dario offered to help debug why the access pattern had such a bad effect on FroNTier, as these should not be any different from other jobs (analysis which access the conditions databases).
    • Cleanup of T1 disk space
      • INFN and PIC DATADISK still being cleaned up and offline.
      • Spreading load of deletion service over 4 hosts. Parallelize if possible.
      • Parameters affecting deletion rate:
        • lChunk, cChunk, sChunk, delay
        • for PIC DATADISKwe have now
          • sChunkSize=30 deletion rate (decreased from 50 because of error rate)
          • lChunkSize=100 (query central catalogue)
          • delay=3 (decreased from 10)
    • AMOD Report
      • Have been testing for 2 days the ToA to AGIS switch in ADC operations, Sep.12-14, then switched over back to AGIS. WebUI being deployed for adding new services.
      • Some issues with the increase of the connection threads to Frontier/Squid servers and the high load on Wed.-Thur. at TRIUMF, BNL and RAL. Savannah:97481. Still under investigation, to be reported at the next ADC weekly meeting.
      • SARA ->TRIUMF transfer failures (DATADISK) "failed to contact on remote SRM". GGUS:86021 solved: network outage with the link between SARA and TRIUMF. Unfortunately due to a known problem, when the link is back, the router did not correctly reroute the traffic. Fixed Tuesday evening.
      • TRIUMF file transfer failures: failed to contact on remote SRM. GGUS:86120 submitted on Saturday. The link between BNL and TRIUMF is down and didn’t reroute through other path automatically.
      • BNL -> CA file transfer failures: failed to contact on remote SRM. GGUS:86121 resolved on Saturday: issue with the direct BNL-TRIUMF circuit is under investigation by the network service providers. BNL team managed to reroute the traffic to CA via CERN temporarily.
  • CA Cloud Squad Actions [20120626]
SFU-LCG2 Auto-Excluded at Tue Sep 11 13:34:56 2012 CET
SFU-LCG2 reset online at Tue Sep 11 16:01:24 2012 CET
ANALY_SFU_bugaboo Auto-Excluded at Tue Sep 11 18:01:37 2012 CET
ANALY_SFU_bugaboo reset online at Tue Sep 11 18:30:09 2012 CET
ANALY_AUSTRALIA Auto-Excluded at Tue Sep 11 20:01:26 2012 CET
ANALY_AUSTRALIA reset online at Tue Sep 11 22:00:21 2012 CET
ANALY_VICTORIA-WG1 Auto-Excluded at Wed Sep 12 02:31:49 2012 CET
CA-VICTORIA-WESTGRID-T2 Auto-Excluded at Wed Sep 12 03:02:35 2012 CET
ANALY_VICTORIA-WG1 reset online at Wed Sep 12 03:30:13 2012 CET
CA-VICTORIA-WESTGRID-T2 reset online at Wed Sep 12 04:01:17 2012 CET
ANALY_AUSTRALIA Auto-Excluded at Wed Sep 12 04:31:08 2012 CET
ANALY_AUSTRALIA reset online at Wed Sep 12 05:00:07 2012 CET
ANALY_SFU_bugaboo Auto-Excluded at Wed Sep 12 08:02:17 2012 CET
ANALY_SCINET Auto-Excluded at Wed Sep 12 09:31:27 2012 CET
ANALY_TRIUMF Auto-Excluded at Wed Sep 12 09:31:33 2012 CET
 ANALY_TRIUMF_CVMFS Auto-Excluded at Wed Sep 12 11:31:04 2012 CET
ANALY_SCINET reset online at Wed Sep 12 12:30:14 2012 CET
ANALY_TRIUMF_CVMFS reset online at Wed Sep 12 12:30:15 2012 CET
ANALY_SFU_bugaboo reset online at Wed Sep 12 13:00:12 2012 CET
ANALY_AUSTRALIA Auto-Excluded at Wed Sep 12 13:00:57 2012 CET
ANALY_SFU_bugaboo Auto-Excluded at Wed Sep 12 14:31:28 2012 CET
ANALY_VICTORIA-WG1 Auto-Excluded at Wed Sep 12 14:31:29 2012 CET
ANALY_MCGILL Auto-Excluded at Wed Sep 12 15:33:06 2012 CET
ANALY_SCINET reset online at Wed Sep 12 23:00:35 2012 CET
ANALY_AUSTRALIA reset online at Wed Sep 12 23:00:37 2012 CET
ANALY_VICTORIA-WG1 reset online at Wed Sep 12 23:00:39 2012 CET
ANALY_SFU_bugaboo reset online at Wed Sep 12 23:30:35 2012 CET
ANALY_MCGILL reset online at Thu Sep 13 04:30:10 2012 CET
ANALY_TRIUMF_CVMFS reset online at Thu Sep 13 04:30:11 2012 CET
CA-MCGILL-CLUMEQ-T2 Auto-Excluded at Sat Sep 15 05:07:08 2012 CET
ANALY_MCGILL Auto-Excluded at Sat Sep 15 05:31:21 2012 CET
ANALY_MCGILL reset online at Sat Sep 15 06:00:25 2012 CET
CA-MCGILL-CLUMEQ-T2 reset online at Sat Sep 15 06:02:13 2012 CET

  • Security News [20120801]

  • ROC_Canada News [20120911]
    • Current shift - Ashok Argawal Sep 17-21, 2012
    • Next Week - Ryan Taylor

  • WLCG and General Computing News [20120911]

SSB Results

SSB PanDA Test Queue Availability (month) - this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).

SAM Results

  • site service status via Gridview - Please check your site

APEL Accounting

APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

McGill

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

TRIUMF

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Production

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):



     World-wide weekly ATLAS ADCoS summary (September 11-17, 2012)
________________________________________________________________________

I. General summary: 
   ---------------

A)  During the past week (Sep 11-17) Panda production service
     - completed 1,573,019 managed group, MC production, validation and reprocessing jobs
     - average ~224,717 jobs per day
     - failed 123,056 jobs
     - average efficiency:
        -- jobs  ~92.2%
     - active tasks: 1,808
       -- distribution by cloud:
         CA:106 CERN:129 DE:249 ES:176 FR:248 IT:133 ND:88 NL:126 TW:151 UK:168 US:234

B)  - UK/RAL-LCG2: SDT (SRM Outage: Upgrade of LHCb Castor stager to version 2.1.12-10) Sep 11
    - NL/SARA-MATRIX: UDT (CREAM-CE, SRM warning: Maintenance on the tape backend is taking longer than expected - 
      Files on tape are not available)  Sep 11
    - ND/NDGF-T1: UDT (ARC-CE outage: batch system update) Sep 11-12
    - ND/NDGF-T1: SDT (Classic-SE, SRM outage: Kernel upgrade of dCache head nodes. Atlas and alice data unavailable) Sep 17
    - FR/IN2P3-CC: SDT (CREAM-CE, gLExec outage:  General outage) Sep 17
    - TW/Taiwan-LCG2: UDT (complete outage due to Power cut) Sep 17
    - Swich TOA -> Agis for testing Sep 12
 
II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
    -------------------------------------------------------------------

1) Tue Sep 11
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ FR/IN2P3-CPPM: jobs fail with "Staging input file failed". GGUS 85992
  It appeared to be a cvmfs problem, quickly fixed.
+ NL/NIKHEF-ELPROD: T0 exports failing to NIKHEF DATADISK with multiple errors. GGUS 85993.
  solved by remounting the FS.
+ CA/SFU-LCG2: put errors, affecting ATLAS jobs to fail. GGUS 85989
  solved by restarting dcache.
+ IT/NFN-MILANO-ATLASC: SRM down. GGUS 86001
  severe hw problem with storage system, site set in DT. After DT problem disappeared.
+ NL/SARA-MATRIX: Transfers to CA TRIUMF-LCG2 failing with "failed to contact on remote SRM" error. GGUS 86021
  due to a known problem, after a netwok outage, the router did not correctly reroute the traffic. Fixed.

2) Wed Sep 12
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ IT/INFN-LECCE: Failed transfers, failed to contact on remote SRM. GGUS 86023
  WAN connectivity problem. Fixed.
- ES/PIC: SRM instabilities- request timeout errors in deletion log. GGUS 85960. 
  PIC asked to reduce deletion rate to avoid those errors. Problem with dCache Chimera.
  PIC_DATADISK availability set to 0 for SantaClaus because it was almost full. Savannah.132089
+ FR/IN2P3-CC: some files unaccessible. GGUS 86059. 
  might be related to the migration of Atlas files from old servers. Files have been recovered.

3) Thu Sep 13
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ US/ BNL-OSG2: Transfer to many disks failing with TRANSFER error during transfer phase. GGUS 86061.
  something fishy about one storage pool. problems dispappeared after restarted it.
+ FR/GRIF-IRFU: more then 500 failed transfers. GGUS 86062
  errors disappeared without any intervention.
+ UK/UKI-LT2-UCL-HEP: More than 630 failed transfers to DATADISK. GGUS 86064
  solved by restarting services and rerunning YAIM.

4) Fri Sep 14
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ ES/NCG-INGRID-PT: SRM related problems. GGUS 86091 and 86102
  SRM suffered a kernel panic during the night. Service was restore successively by booting the system.
  New failures later due to a storage problem in one server that make the SRM to get stuck. 
  Site put in UDT. Errors disappeared after site coming out of DT.
+ UK/UKI-LT2-RHUL: file transfer failures with "SRM_ABORTED" errors. GGUS 86092
  There was major disruption at the IT service. Failures disappeared after service being back.
+ DE/UNI-FREIBURG: File transfer source errors. GGUS 86115
  dCache client crashed on three poolnodes - restart solved the problem.

5) Sat Sep 15
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ CA/CA-MCGILL-CLUMEQ-T2_DATADISK: file transfer errors: "GRIDFTP_ERROR". GGUS 86116
  disappeared without any intervention.
+ DE/PSNC SRM se.reef.man.poznan.pl failed. GGUS 86117
  Services restarted.   
+ CA/TRIUMF-LCG2: failed to contact on remote SRM to US sites. GGUS 86120 and 86121
  The link between BNL and TRIUMF is down, not understood why it did not reroute 
  through other path automatically. Successfully rerouted meanwhile.
+ UK: Transfers failing in almost all sites in UK with security error (ddmadmin proxy expired).
  GGUS 86124 and Savannah.97509
  stayed persistent for many hours, but finally diappeared.   

6) Sun Sep 16
     -> Cloud/site PROD efficiency <50% : -
     -> Cloud/site DDM  efficiency <50% : -
       ........................................
+ TW/TAIWAN-LCG2: transfers fail with connection prematurly closed. GGUS 86127
  Some backup process caused more load on DB. DBA recovered the problem.
- IT/INFN-MILANO-ATLASC: Checksum errors of many files after transfers from DATADISK to INFN-ROMA1.
  GGUS 86129. verified checksum errors through manual lcg-cp to local UI.
  Savannah.97512 assigned to dq2-ddm-ops-cloud_it, no answer yet.
+ UK/UKI-NORTHGRID-SHEF-HEP: failed to contact on remote SRM. GGUS 86130
  restarted srm services and solved a problem with bdii.

7) Mon Sep 17
     -> Cloud/site PROD efficiency <50% : TW
     -> Cloud/site DDM  efficiency <50% : TW
       ........................................
- US/BU_ATLAS_Tier2: deletion errors for NET2_USERDISK with Error reading token data header.
  known ongoing problem. Under investigation.
+ TW: UDT due to Power cut.
+ CERN/CERN-PROD: transfer failures to CERN-PROD DATADISK "no space left on device"
  There was a kind of denial of service attack, partially by an external institute using unauthenticated FUSE mounts 
  or expired credentials (1000 ops/s) but mainly due to the tail of a too massive drain operation for machine retirement.    


III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
      (++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------
++ 17.0.6.8 mc11_7TeV Reco tasks: 967485, 967486, 967487, 967488, 967489, 967490, 967491 
   fail due to too much memory consumption
   Savannah 131978. MC11 production - JETETMISS.
   aborted and resubmitted with 100 instead of 1000 events per job
-+ 17.2.4.6.2 data12_8TeV Reco task 969298
   job 32 is failing and failing, now on try 7
   Savannah 132035. group production SUSY
   job killed
-+ 17.2.5.2 mc12_8TeV Herwigpp evgen task 973203
   EnvironmentError: Auxiliary file...not found in DATAPATH
   Savannah 132094. MC12 production - SUSY
   copied the necessary files by hand to the right location
-- 17.2.4.8.1 data12_8TeV merge tasks 972515/17
   Wrong number of inputNTUPXXXFile arguments: 0 instead of 1. Stopping
   Savannah 132095. group production TOP
   being followed up
-+ 17.2.4.5 mc12_8TeV evgen tasks 973461-64
   Pilot has decided to kill looping job
   Savannah 132121. MC12 production - PHYSICS
   increased cpucount and attempts for all 4 tasks.
-- 17.2.3.7.4 data12_8TeV Reco tasks 955365 and 960527
   failed in multiple sites for TRF_UNKNOWN | "out of memory: saving summary ..."
   Savannah 132164 and 132174. group production Higgs HSG5
   no comments yet.

-- LeslieGroer - 2012-09-18


This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20120918
Topic revision: r2 - 2012-09-18 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback