Tier1 and Tier-2 Weekly Report 2012-10-02

General News

  • ADC and ATLAS Computing News [20121002]
    • ADC Weekly meeting
    • LHC recovering. 0.5 fb^-1 delivered. Max lum 6.9x10^33^cm^2s^-1
    • Fast Data Reprocessing - all 2012 data
      • Improved Conditions for all data
      • Fix of many small problems affecting significant fractions of data
      • Recover a few runs in the Good Run List
      • Improve possibly by 1-2% the LAr DQ efficiency
      • No software changes (hence no MC reprocessing needed)
      • Reprocess part of data (up to October) at Tier1 and then switch Conditions to Tier0
      • Provide best 2012 data we can w/ rel 17 for winter conferences !
      • So far have ~1.6 billions events, ~1.5 million files
        • Represents ~2. times vs 2011-reprocessing Timing (CPU/evt) ~25s/evt
      • Phase I : express (cosmicCalo and express) which can be used to determine the beam spot and validate Conditions
      • Phase II: bulk reprocessing using the conditions derived in the express reprocessing. Usually takes place a week later.
      • Reprocessed streams: Reprocess Physics streams first, then delayed streams
      • Timeline: launch express stream reprocessing Oct 15 and bulk of reprocessing end of Oct (4-6 weeks estimate to complete)
      • Slice test run to test scheme. Some open questions about the effect of MCP.
    • EMI WN Testing
    • AMOD Report
      • Tue Sep 25 - longer than usual DQ2+LFC registration times, causing high load on PanDA servers. Still being investigated.
      • PanDA server LFC registration should be activated for all sites in order to avoid individual registrations by the pilot
    • HammerCloud AutoExclusion Control
      • Prevent cascading effect of problems with central services
      • Partly motivated by failures on Sat Sep 22
      • Introducing two safety measures:
        • An autoexclusion control mechanism.
        • An auto disabling mechanism.
      • Still in development - see slides
    • Database Operations
      • Oracle update at CERN Oct 9 - should be transparent
    • Frontier and CVMFS
      • Replace HOTDISK functionality
      • DBreleases may be absorbed into databases format in the future
      • Right now HOTDISK is not needed for sites that have CVMFS and run only simulation production and analysis
      • As soon as production tests are completed we can safely remove HOTDISK from all sites with CVMFS
      • The pilot should NOT check for the presence of DBReleases any longer
      • Functional tests of Frontier monitored in dashboard
      • Need to find equivalent test for Squid/CVMFS connectivity
      • Long discussion about testing some of this at T1s now, but wait until after reprocessing campaign.
    • Problems with Frontier access slides
      • Report on incident from Sep 10 affecting TRIUMF, BNL, RAL from Alastair Dewhurst
      • Primary cause of load was tracked down to Overlay MC (large number of lumi blocks conditions need to be read for min bias overlay) - large number of IO requests
      • Additional cause of load due to a lack of a squid at Triumf and subsequent failure of Frontier.
      • The RAL load was due to failover from the other two clouds.
      • Increased the number of allowed DB connections by Frontier to Oracle
        • This will increase load on Oracle DB so being done cautiously.
      • TRIUMF deployed squid in front of their Frontier server.
      • All sites should have sensible failover policies
    • DDM Dashboard update
      • Minor tweaks. Transfer and Registration steps both reported now.

  • CA Cloud Squad Actions [20120626]
    • User DaTRI requests approved / processed (last week)
    • Declared Downtimes
      • CA-SCINET-T2 SCHEDULED downtime (OUTAGE) [01-10-2012 10:00 to 03-10-2012 00:00 UTC ] - Annual cooling tower maintenance at data centre, followed by moving LCG hosts to new IP subnet
      • SFU-LCG2 UNSCHEDULED downtime (OUTAGE) [28-09-2012 16:00 to 29-09-2012 04:00 UTC] - Power to the whole machine room needs to be shutdown for 2 hours this night. Start draining the queues 9 hours before the shutdown.
    • HammerCloud autoexclusions
Ignoring all IAAS exclusions and resets (numerous this last week)
CA-SCINET-T2 Auto-Excluded at Tue Sep 25 07:14:10 2012 CET
ANALY_SCINET Auto-Excluded at Tue Sep 25 07:37:54 2012 CET
ANALY_SCINET reset online at Tue Sep 25 17:31:00 2012 CET
CA-SCINET-T2 reset online at Tue Sep 25 17:32:18 2012 CET
ANALY_SFU_bugaboo reset online at Sun Sep 30 22:02:39 2012 CET
SFU-LCG2 reset online at Sun Sep 30 22:06:41 2012 CET
ANALY_MCGILL Auto-Excluded at Tue Oct 2 02:32:26 2012 CET
CA-MCGILL-CLUMEQ-T2 Auto-Excluded at Tue Oct 2 02:34:11 2012 CET
ANALY_MCGILL reset online at Tue Oct 2 08:31:31 2012 CET
CA-MCGILL-CLUMEQ-T2 reset online at Tue Oct 2 09:04:15 2012 CET

  • Security News [20120801]

  • ROC_Canada News [20121002]
    • Current shift - Di Qing October 1-5, 2012
    • Next Week - Andrew Wong

  • WLCG and General Computing News [20120911]

SSB Results

SSB PanDA Test Queue Availability (month) - this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).

SAM Results

  • site service status via Gridview - Please check your site

APEL Accounting

APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

McGill

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

TRIUMF

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Production

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):


       World-wide weekly ATLAS ADCoS summary (Sep.25-Oct.1,2012)
________________________________________________________________________

I. General summary:
    ---------------

A)  During the past week (Sep.25-Oct.1,2012) Panda production service
      - completed successfully 1,069,593 managed group, MC production,
        validation and reprocessing jobs
      - average ~152,799 jobs per day
      - failed 57,631 jobs
      - average efficiency:
         -- jobs ~94,9%
      - active tasks: 995
         -- distribution by cloud: CA:107 CERN:85 DE:143 ES:31 FR:136 IT:30 ND:63 NL:131 TW:42 UK:73 US:154

B)   - CERN-PROD DT (ce204 OUTAGE:s/w upgrade+reconfig.), Sep.24-Oct.1.
     - CERN-PROD DT (ce203 OUTAGE:s/w upgrade+reconfig.), Sep.26-Oct.5.
     - CERN/CERN-PROD DT(LFC OUTAGE:network switches replacement),Sep.27.
     - RAL-LCG2 DT (SE,SRM OUTAGE:ATLAS CASTOR upgrade), Sep.25.
     - RAL-LCG2 DT (SE,SRM OUTAGE:SRM DB b/e problems), Sep.30-Oct.1.
     - NDGF-T1 DT (ARC-CE ce01.titan.uio.no OUTAGE:h/w move),Sep.28-Oct.1
     - NDGF-T1 DT (SE,SRM warning:dcache pools down), Oct.1.
     - DE/FZK DT (cream-1,3,5 OUTAGE:batch server crash,recovery),Oct.1-2

     - CERN ATLAS DDM Dashboard upgrade (2.0 M3.7), Oct.1.
     - New DB release 20.4.1,20.5.1 subscribed to sites, Sep.25,28.
     - New pilot version 54b released, Sep.26.
     - New OSG Software releases 3.1.9, 1.2.30 distributed, Sep.25,27.
     - New ATLAS releases and TRF caches were distributed:
       -- AtlasOffline    - 16.6.7.34(32+64b)
       -- AtlasProduction - 17.2.6.2(32+64b)
       -- AtlasPhysics 17.5.5.2.1(32+64b).
       -- TrigMC 17.2.6.1.1(32b).

II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
     -------------------------------------------------------------------

1) Tue Sep.25
      -> Cloud/site PROD efficiency ever<50% : -
      -> Cloud/site DDM  efficiency <50% : -
        ........................................
+ NL/IL-TAU-HEP FT f./DEST.:CONN.:SRM.GGUS 86361 solved:no errors,Sep.25.
+ UK/UKI-LT2-UCL all FT f./DEST.:SECURITY_ER.:Could not get user mapping.
  GGUS 86362 solved:Moved DPM head node to a new VM host with more disk
  space.Still 118|1h f.,Sep.28.Migration completed,Sep.30.
+ UK/UKI-SCOTGRID-ECDF_DATADISK no space left.Savannah 132366:Some
  secondary replicas deleted by Stephane.Unblacklisted,Sep.28.
- CERN/PERF-FLAVTAG DaTRI requests are awaiting_subscription(quota_
  exceeded) to CERN-PROD_FLAVTAG,SLACXRD,BNL-OSG2.Savannah 132420.Stopped
  all the unwanted requests.DaTRI transfer to the destination seems was
  re-triggered by the deletion procedure.
+ CA/CA-SCINET-T2 FT f./SOURCE:HTTP_TIMEOUT:SRM.GGUS 86381 solved:hung
  SRM has been restarted.
+ IT/INFN-FRASCATI FT f./SOURCE:CONN.:SRM.GGUS 86364 solved:srmv2.2
  service was restarted,works the same day.
+ US/AGLT2 still 1K+ FT f./SOURCE:SECURITY_ER.:No valid credentials
  provided.GGUS 86268 solved:~1900/12h f./GRIDFTP_ER.:rsa Encryption on
  Sep.26.DCache uprade was done,but errors "failed to contact on remote
  SRM" have reappeared,Sep.27.All issues at the site resolved,Sep.28.

2) Wed Sep.26
      -> Cloud/site PROD efficiency ever<50%  -
      -> Cloud/site DDM  efficiency <50% : -
        ................................................................
+ CERN/PVSS DCS data permanently in RED:PVSS2COOL Replication problem.
  Elog 39626,39638:disappeared at 16:00.
- CERN/DDM CC voatlas181 out of load balancing/Seg.faults.Elog.39628.
- UK/UKI-SCOTGRID-GLASGOW many job f./stageing f.GGUS 86391 in progress:
  load issue with disk servers and DPM being unable to properly manage
  high load on disks.606 FT f. later the same day.Files are certainly on
  the disk that was complaining of high load,no evidence that the disk is
  broken.So it's the load issue?
+ CA/TRIUMF 317 job f./Alarm clock dccp.GGUS 86392 verified:caused by a
  problematic dcap door,removed from DNS alias.
- CA/CA-MCGILL-CLUMEQ FT f./GRIDFTP_ER.:server err.500.GGUS 86452
  assigned:the failures are still there,Sep.27.More f./GRIDFTP_ER.:server
  err.500:no space left on device,Oct.1.
+ DE/PSNC<-FZK DBRel FT f./GRIDFTP_ER.:globus_gass_copy_register_url_to_
  url transfer timeout.GGUS 86393 solved:1803 FT f./DEST.:CONN.:SRM.
  Missing DBRelease file was eventually transferred to the site,Sep.27.
+ DE/LRZ-LMU 1.3K+ FT f./GRIDFTP_ER.:Unable to connect to lcg-lrz dc41.
  grid.lrz.de.GGUS 86318 reopened,solved:some firewall rules got not
  loaded,fixed the same day.
+ DE/DESY-HH_LOCALGROUPDISK ~1K FT f./GRIDFTP_ER.:server er.451.Operation
  failed:Best pool too high:Infinity.Savannah 131724:enough space again,
  Sep.30,auto un-blacklisted.
- FR/ROMANIA07 ~300 job f./Get err.:adler32 mismatch on input file.GGUS
  86394 assigned:still the same f.,Sep.28.Asked ADC to delete and re-
  transfer the files,because seems there is a problem with the files
  consistency,Oct.1.
+ IT/INFN-ROMA1 many job f./killed by signal 15.GGUS 86430 solved:TERM_
  OWNER:job killed by owner.Seems killed by the pilot.No err.(99%
  efficiency) on Sep.28.
- US/BU_ATLAS_Tier2 ~700|4h deletion err.GGUS 85951 in progress updated.

3) Thu Sep.27
      -> Cloud/site PROD efficiency ever<50% : -
      -> Cloud/site DDM efficiency <50%: ND (known MILANO checksum issue)
        ............................................
+ CA/TRIUMF-LCG2 1800+ job f./Get err.:triumf.ca/^dummy.GGUS 86468 solved
  :not a site issue.Panda creates panda GEN dispatch block always at
  DATADISK at T1s even when the files are in PRODDISK.This generated
  deletion and resubmission of files,and the job failures.Tadashi fixed
  in the dev server. To be applied to prod servers on Mon.
+ CA/CA-SCINET-T2_DATADISK NO_SPACE_LEFT.Savannah 132493:Some clean-up
  done by Stephane,unblacklisted,Sep.28.
- DE/GoeGrid job f./Get err.:Staging input file failed.GGUS 86479
  assigned:still the same f.,Sep.28.Problems with dcache (particularly
  with dcap door) and also another internal problem.FT f./server err.426|
  500/DEST.:AsyncWait,Oct.1.
- DE/PSNC all FT f./DEST.:CONN.:SRM.GGUS 86480 in progress:FTs don't
  succeed since Sep.26-27,updated on Sep.29.Still f.,Oct.1:The site is
  still in maint.(h/w failure),replacement equipment has not arrived.

4) Fri Sep.28
      -> Cloud/site PROD efficiency ever<50% : -
      -> Cloud/site DDM efficiency  <50% : DE/Praguelcg2, FR/LPC
        ............................................
- NL/IL-TAU-HEP FT f./DEST.:CONN.:SRM.GGUS 86486 assigned.Blacklisted in
  DDM:Savannah 132524.
- NL/csTCDie job f./Reached maximum batch system time limit.GGUS 86507
  reopened:not the site,but t.965385 (jobs running >3days,4881 of 4998
  jobs finished) issue:Savannah 132471.But other job f./disk pool manager
  not running on wn055.grid.cs.tcd.ie are site-related.
- NL/AM-04-YERPHI all files deleted.Cleanup of DQ2/LFC still needs to be
  done.GGUS 86265 updated,Savannah 97814,132529.Some ACL changed,Oct.1.
+ UK/UKI-LT2-UCL-HEP FT f./DEST.:CONN.:failed:SOAP-ENV:Client - DB insert
  error.GGUS 86494 solved:Moved DPM head node to new virtual machine host
  with more disk space,Oct.1.
+ DE/MPPMU FT f./DEST.:CONN.:SRM.GGUS 86512 solved:network failure at the
  institute late morning.Fixed the same day.
+ DE/Praguelcg2 300+ job f./Get:Staging input file failed/Put:couldn't
  open conn.to golias100.farm.particle.cz.GGUS 86515 solved:dpm daemon on
  SE died of segfault during the night.Restarted at 10:20 CEST.
- TW/TAIWAN-LCG2_DATADISK->BNL FT f./SOURCE:CONN.:SRM.GGUS 86537 in
  progress:network problem on the path between BNL and ASGC (ASGC seems
  to have chosen to use the general IP path, rather than the OPN for the
  BNL<=>ASGC traffic) is under investigation.Still f.TW<-SLAC+BNL,Oct.1.
  ASGC FTS is blocked to access BNL SRM.And routing path is changed.
- US/UTD-HEP FT f./failed to contact on remote SRM.GGUS 86539 assigned:
  still all FT f.,Oct.1.h/w failure,blacklisted in DDM:Savannah 132600.

5) Sat Sep.29
      -> Cloud/site PROD efficiency ever<50% : TW
      -> Cloud/site DDM  efficiency <50% : TW,NL
        ..............................
+ UK/RAL-LCG2_SCRATCHDISK 1000s FT f ./SOURCE:proxy expired.GGUS 86541,
  81844 solved:known FTS bug,production FTS f/e had the patch applied,
  Oct.1.No errors since.
+ UK/UKI-NORTHGRID-LIV-HEP_DATADISK FT f./DEST.:SRM_ABORTED:.GGUS 86542
  solved:problem with transfers from ~01:40 to ~03:00,Sep.29.Seems the
  temporary load issue.OK after that.No errors,Oct.1.
- UK/UKI-SOUTHGRID-BHAM-HEP FT f./DEST.:SRM_ABORTED.GGUS 86540 reopened:
  The error is still there,Oct.1.Failing transfers to DATADISK (100%
  failure) but not to PRODDISK (100% success).
- NL/TR-10-ULAKBIM_DATADISK FT f./GRIDFTP_ER:No space left on device.
  Savannah 97817:intermediate transfer buffer is full,up to the site to
  solve the issue.GGUS 86543 in progress.Blacklisted:Savannah 132612.
+ DE/WUPPERTALPROD all FT f./SOURCE+DEST:CONN.:SRM.GGUS 86545 solved:
  Postgres DB disk space was full,freed some space,Oct.1.
- CA/CA-VICTORIA-WESTGRID-T2 job f./Get:lfc_getreplicas failed with:2702,
  Bad credentials.GGUS 86546 in progress:happened last week as well.It is
  caused by file corruption of /cvmfs/atlas.cern.ch/repo/ATLASLocalRoot
  Base/etc/grid-security/certificates/1d879c6c.r0.Unclear why so many of
  the VMs have corruption of the same file,which is too coincidental.The
  same problem also happens in a local T3 system, which is physical not
  virtual, and running a newer version of CVMFS.

6) Sun Sep.30
      -> Cloud/site PROD efficiency ever<50% : -
      -> Cloud/site DDM  efficiency < 50% : NL,UK
        ........................................
+ CERN/ss-sara(atlas-SS07) low availability,DB corruption fixed.Elog
  39708- 39710,39713,39743.
- IT/INFN-MILANO-ATLASC->NDGF-T1 FT f./DEST.:Checksum mismatch.GGUS 84548
  ,86129 assigned:f/s corruption,100s lost/damaged files.Recovery is in
  progress.Savannah 97512.
- UK/RAL-LCG2 many FT f./SOURCE+DEST.:CONN.:SRM.GGUS 86552 assigned:also
  job f./Put.:could not open conn.to srm-atlas.gridpp.rl.ac.uk and T0
  export FT f.ATLAS SRM put in DT:DB problem fixed,Oct.1.Still some small
  number of FT f.
+ ES/IFIC-LCG2 FT f./SOURCE+DEST.:CONN.:SRM.GGUS 86553 verified:Disk
  server has been restarted and Lustre has been recovered,Oct.1.

7) Mon Oct.1
      -> Cloud/site PROD efficiency ever<50% : -
      -> Cloud/site DDM  efficiency <50% : -
        .......................................................
+ CERN/ss-sara(atlas-SS07) in ATLAS_DDM_VOBOXES yellow again,availability
  50%,back to normal at ~12:30.Elog.39752,39761.
- DE/PSNC still FT f./DEST.:CONN.:SRM.GGUS 86480,86117 reopened:cross-
  linked together.
- NL/AM-04-YERPHI still all FT f./DEST.:permission denied.GGUS 86265
  updated:some ACL change,still f.on another token.
- NL/NIKHEF-ELPROD 3K+ job f./getSiteroot: No such file or dir: /cvmfs/
  atlas.cern.ch/repo/sw/software/17.2.5/cmtsite/setup.sh.GGUS 86612
  assigned:17.2.5 was verified at NIKHEF(Install DB).
+ FR/TOKYO-LCG2 Groupdisk FT f./SOURCE:revoked certificate.GGUS 86573
  verified:put DT.

III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
       (++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------

++ 17.2.5.2 mc12_8TeV evgen tasks 980748-980818 failures:ERROR During
 execution of Generate, exception caught: Error downloading tarball MC12
 JobOpts-00-04-97_v0.tar.gz.Downloader reports:Found proxy list['',None].
 Savannah 132418:MC12 production - HIGGS+EXOTICS.All jobs failed several
 attempts in various clouds.Seems fixed,jobs began running.Tasks DONE.

-- 17.2.5.2 mc12_8TeV evgen tasks 981150-981158 failures:"out of memory.
 Unknown transExitCode error code 100"|"Fortran runtime error: Bad value
 during integer read". Savannah 132457,132575:MC12 production - SUSY.All
 jobs failed multiple attemps at various clouds.Tasks are in "failed"
 state.The requesters investigate.

-+ 17.2.5.2 mc12_8TeV evgen tasks 980112-980119 failures: Reached
 maximum batch system time limit/EFFICIENCY IS TOO LOW! At least: 98%
 required/Payload stdout file too big.Savanah 132471:MC12 production -
 BTAGGING.All jobs failed multiple attempts in various clouds.Tasks
 ABORTED.The requester is working to get the problems fixed.

-- 17.2.4.6.2 mc12_8TeV Reco merge tasks 984872-984913 failures:TRF_
 UNKNOWN|"attempt to add a duplicate(TopAlg.METAlg).. dupe ignored"|
 "Failed to retrieve TauRecContainer"|"Terminating event processing loop
 due to errors".Savannah 132573:group production SUSY.All jobs have
 failed multiple attempts at various clouds.Tasks are still in submitting
 or submitted state.No comments published so far. 

-- LeslieGroer - 2012-10-02


This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20121002