Tier1 and Tier-2 Weekly Report 2013-01-08
General News
- ADC and ATLAS Computing News [20130108]
- ADC Weekly meeting
- LHC setting up for heavy ion run through Jan 17. Run until Feb 11. Long shutdown starts Feb 13.
- GDP report
- Overall throughput and efficiency was not bad - some share and priority issues
- Large amounts of group production: AOD to DPD over Xmas with relatively large inputs per job, causing PRODDISK to fill up
- Some brokering issues with Bamboo as depth of 3600 was not sufficient to consider all MC jobs
- Increase task priorities by hand to force these through
- Now have separate queues for AP/GP task brokering
- Various miscellaneous issues to be addressed in the new year (max attempt per job, missing scouts for some tasks, finalizing tasks etc...)
- Recent patches and fixes
- Priority creep capped at 930
- <950 to avoid T1 restriction
- Walltime reset using scouts status
- Walltime set to 96hrs on first failure(due to walltime)
- Ignore submitting tasks with no done jobs (in jobdef loop)
- Proposals
- Remove priority decrement on failure
- Boost nearly finished tasks
- Restrict priority creep to taskpriority+10 so does not wash out intended priority differences
- Apply a default AP/GP share on all sites
- Prevent proddisk filling by more accurate throttling in brokerage (use actual input file sizes)
- Retire proddisk and use data disk instead
- MC Production report to ATLAS weekly
- MC12 throughput lower than expected in the last weeks
- High demand for group production
- Some technical issues with task assignment due to high number of unassigned tasks in the system - short term measures provided by ADC, issue fixed by ADC
- Group DPD Production
- Started in earnest Dec 17. Some issues prior with 1k and 10k event file sizes
- Higgs got highest priority
- Large number of group production tasks submitted with high priority blocked MC production
- Some issues/tasks restarted on the fly
- Group production now requires a LOT of resources, need to address this
- Several seconds per event for some formats and multiple formats being produced for some groups
- 2ms per event for NTUPtoNTUP,, DAOD making is typically 0.1-0.3s/event
- Still need quite a few weeks to complete
- New production for Moriond coming in, also need new cache
- SM_TRILEP and WPRIME ready
- HSG2 not ready, but should be soon
- SUSY_BOOST ready today, but resource hungry (5s/event)
- Htautau embedded, not ready, final resource estimate not yet available
- AMOD Report
- TRIUMF snow induced power cut mentioned
- DDM Operations
- T1 RAW datasets cleaned up somewhat over Xmas (2.5PB -> 1.5PB)
- PRODDISK filling up at all sites due to large AOD inputs for group production
- DDM discussing merging PROD and DATADISK
- Already being done for some T1s and test T2s
- For now, ask T2s to increase PRODDISK if possible
- To speed up moving GROUPDISK to DATADISK, local file transfers being done via LOCALGROUPDISK
- replicated from GROUPDISK to LOCALGROUPDISK
- removed from GROUPDISK
- replicated back to DDM endpoint for group (using DATADISK spacetoken)
- removed from LOCALGROUPDISK
- The estimated time of this migration is several weeks.
- Sites will be reminded by Tomas to move free space to DATADISK
- New T2 in Slovakia - federated two sites
- CA Cloud Squad Actions [20120626]
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2012 storage pledge.
- HammerCloud [20120214]
- gLite/EMI News [20121127]
- ROC_Canada News [20121030]
- Current shift - Neil Knecht November 5-9, 2012
- Next Week - Simon Nderitu
- WLCG and General Computing News [20120911]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):
World-wide weekly ATLAS ADCoS summary (Dec.18-24,2012)
________________________________________________________________________
I. General summary:
---------------
A) During the past week (Dec.18-24,2012) Panda production service
- completed successfully 1,043,272 managed group, MC production,
validation and reprocessing jobs
- average ~149,039 jobs per day
- failed 120,721 jobs
- average efficiency:
-- jobs ~89.6%
- active tasks: 4113
-- distribution by cloud:
CA:235 CERN:125 DE:569 ES:157 FR:667 IT:430 ND:268 NL:198 TW:159 UK:670
US:635
B) Downtimes:
- DE/FZK-LCG2 DT (cream-1,7 OUTAGE:service retirement), Dec.18-31.
- UK/RAL-LCG2 DT (CE,SE,SRM OUTAGE:h/w failure in network), Dec.18.
- CA/TRIUMF-LCG2 DT (CE,SE,SRM,BDII OUTAGE:power outage), Dec.19.
- ND/NDGF-T1 DT (SE,SRM warning:os update,reboot), Dec.20.
- TW/TAIWAN-LCG2 DT (CE,SE,SRM,BDII OUTAGE:network,DPM,CASTOR
upgrade),Dec.23-25.
- NL/SARA-MATRIX DT (CE,BDII OUTAGE:umd2 creamce problems),Dec.24-27
Other news:
- CERN annual power cut, Dec.19 (~7:00am).
- New DB Releases 21.3.1, 21.4.1, 21.5.1 subscribed to sites.
- New ATLAS releases and TRF caches were distributed:
-- AtlasOffline - 17.2.9(32b),17.3.8(32b)
-- AtlasProduction - 17.2.8.1|2(32+64b),17.2.9.1(32b),15.6.14.0(32b)
-- AtlasPhysics - 15.6.14.13.0(32b).
II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
-------------------------------------------------------------------
1) Tue Dec.18
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : US/AGLT2(DT)
........................................
+ FR/IN2P3-LPC FT f./GRIDFTP_ER.:Unable to con.to clrdata-dpm22.in2p3.fr
GGUS 89780 solved:the dpm-gsiftp service was dead,restarted.
+ UK/RAL-LCG2 FT f./DEST.+SOURCE:CONN.:SRM.GGUS 89764 solved:network
recovered from temporary outage.
+ DE/WUPPERTAL FT f./SOURCE:locality is UNAVAILABLE.GGUS 89812 solved:
h/w of 1 storage node died,recovered,Dec.20.
+ US/NERSC 800+ FT f./DEST.:CONN.:SRM.GGUS 89811 assigned:CRL update
service fixed,Dec.19.
2) Wed Dec.19
-> Cloud/site PROD efficiency ever<50% -
-> Cloud/site DDM efficiency <50% : CA
................................................................
+ US/AGLT2 2500+ FT f./SOURCE:CONN.:SRM.GGUS 89813 verified:failure of a
central switch-stack.Work to recover the associated VMs which lost
contact with their b/e storage.DT.
- NL/TECHNION-HEP still FT f./GRIDFTP_ER.:server er.500:i/o err.GGUS
89699 reopened.
+ NL/WEIZMANN-LCG2 FT f./SOURCE:CONN.:SRM.GGUS 89836 solved:replaced the
old certificate (hostkey.pem hostcert.pm) to new certificate.
+ NL/TR-10-ULAKBIM FT f./DEST.:FILE_EXISTS.GGUS 89837 in progress:also
f./SOURCE:GRIDFTP_ER.:operation was aborted.Some storage problems.
Still 2500+ (100%) same FT f.,Dec.21.Should be fixed,Dec.24:transfers
complete.Savannah 134729.
+ CA/TRIUMF-LCG2 FT f./SOURCE:CONN.:SRM.GGUS 89840 assigned:power cut,
had to shutdown T1 services.Fixed,Dec.21.
+ IT/ZAUJ 100% FT f./DEST.:Parsing document '/usr/etc/glite-data-srm-
util-cpp.patterns.xml' failed.GGUS 89835 solved:NFS has frozen,fixed
Dec.20.
+ DE/UNI-DORTMUND job f./staging input file failed.GGUS 89841 solved:
looks like a temporary problem,some failed jobs succeeded eventualy in
a 2 or 3 attempt,Dec.21.
+ DE/DESY-HH job f./Error downloading tarball MC12JobOpts-00-06-32_v1.
tar.gz.Savannah 134692:seems resolved,Dec.21.
- FR/BEIGING_LCG2 job f./ld.so:object...from LD_PRELOAD can't be
preloaded.Savannah 134689:PFC update should fix up the problems with
the LD_PRELOAD.
3) Thu Dec.20
-> Cloud/site PROD efficiency ever<50% : CA
-> Cloud/site DDM efficiency <50%: -
.....................................................
- CA/SFU-LCG2 1K FT f./SOURCE:locality is UNAVAILABLE.GGUS 89842 in
progress:had a power failure 2 days ago and the UPS did not hold. All
systems were shutdown incorrectly.Still trying to bring DDN 9900 and
10k online, Dec.21.
+ FR/RO-07-NIPNE new 100s FT f./DEST.:CONN.:SRM.GGUS 88797 reopened
updated:it's up now.Again had a problem with a dpm-disk,it's an old
machine.Still 100% f.,Dec.21.Fixed:transfers complete,Dec.24.
Savannah 134735.
+ ES/EELA-UTFSM 2K+ FT f./DEST.:CONN.:SRM.GGUS 89865 solved:after dCache
upgrade server didn't start properly.Fixed after reboot,Dec.21.
+ ND/SE-SNIC-T2 100% FT f./GRIDFTP_ER.:server err.451:No write pool
available.GGUS 89846 solved:all pools were accidentally left read-only
after the scheduled update yesterday.Pools made writable again.
4) Fri Dec.21
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : -
.....................................................
+ FR/IN2P3-LPC job f./Too little space left on local disk to run job.
GGUS 89887 solved:appeared on many different WNs.WNs were cleaned,no
more errors,Dec.22.Savannah 134718.
- TW/TAIWAN-LCG2 job f./Too little space left on local disk to run job.
Savannah 134722:adjusted job slots to small space WNs to fix,Dec.22.
5) Sat Dec.22
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : ND(due to MPPMU?),TW
..............................
- FR/RO-07-NIPNE still FT f.,red in DDM dashboard.Savannah 134735:site
blacklisted,but still transferring.Blacklist/monitoring issue?
- UK/UKI-SCOTGRID-GLASGOW GROUPDISK 500+ FT f./Disk full.Savannah 134742
automatically blacklisted for writing.Also a large gap:srm used & DQ2.
6) Sun Dec.23
-> Cloud/site PROD efficiency ever<50% : TW(known issue)
-> Cloud/site DDM efficiency < 50% : TW
........................................
- NL/ITEP DATADISK FT f./SOURCE:locality is UNAVAILABLE.GGUS 89902 in
progress:also 100% FT f./DEST.:AGENT err.:CONFIGURATION_ER.:No Channel
found,Channel closed for your VO or VO not authorized for transferring
between SARA-MATRIX and EXAMPLE SITE-ID. FTS problem?Blacklisted for
writing:Savannah 134756.
7) Mon Dec.24
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : -
.......................................................
+ CERN/CERN-PROD FT f./GRIDFTP_ER.:server err.500:open error.GGUS 89910
solved:reply from CERN expert:"The example file did have an empty
checksum in the namespace, and hence would give checksum errors on
any read access.Suggest to verify against your catalog,"our" version
has ADLER32 75e80a29.(un)fortunately this is a per-file error (so not
"fixable" for all files by e.g restarting a service), so if you have
other such errors I would need the list".
III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
(++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------
++ 17.2.7.5.3 mc12_8TeV Reco merge tasks 1105414-1105549 failures:Syntax
Error:invalid syntax(BTaggingFlags).Savannah 134628:groupproductionTau.
All jobs have failed many attempts in various clouds.Understood:problem
in p-tag,tasks ABORTED and resubmitted with new p-tag.
++ 17.2.2.6 mc12_8TeV Merging task 1032638 failures:RuntimeError:input
HITS and output ESD/AOD/TAG is not supported.Savannah 134630:MC12
production - HIGGS.All jobs have failed multiple attempts at various
sites running for CA cloud.Task was misconfigured,ABORTED.
-- 17.2.7.5 mc12_8TeV evgen task 1104153 failures:EFFICIENCY IS TOO LOW!
At least: 98% required|"Error in Algorithm Finalize".Savannah 134631:
MC12 production - SUSY.All jobs have failed multiple attempts at
various sites running for UK cloud.Task "failed".No comments published
so far.
--
LeslieGroer - 2013-01-08