Tier1 and Tier-2 Weekly Report 2013-01-15
General News
- ADC and ATLAS Computing News [20130115]
- Availability Report
issued for CA sites
- CA-VICTORIA-WESTGRID-T2 (85.29%) and SFU-LCG2 (86.26%). Adding in 3% for CA-VICTORIA-WESTGRID-T2 for Dec 29-30 not quite sufficient to get to 90%.
- ADC Weekly meeting
- LHC just about ready for Pb-p collisions - recovering from power glitches. Still plan to end run Feb 13.
- Issue of T2 sites PRODDISK filling up still being discussed and some measures being taken
- T1weight may need to be re-tuned
- Expected size for PRODDISK is being reviewed
- Setting fairsharepolicy to do more evgen/simul could be another measure.
- Wisdom of merging PRODDISK and DATADISK still being discussed with no clear time scale for a definite decision
- Still migrating panda queue configs from the conventional SVN .py files to AGIS
- HLT Reprocessing on the Grid
- Long presentation
and discussion about validation and testing
- Need to confirm no issues running on BNL site before released into the "wild"
- Updates to Hammercloud tests for both AFT
and PFT
- AFT: Change a D3DPMaker test from data10/athena16.0.3 to data12/athena17.0.2.10.1
- PFT: switch from mc10 to mc11/m12 with updated athena16/17 versions
- Testing at all sites for the new sites looks good. Agreed to switch to the new tests this week (AFT tomorrow, PFT first wait for DDM-ops to have a look at input replication)
- Some non-critical HC tests ongoing at low rate at all sites. Unused HC jobs are to be discussed offline with GDP.
- T2D performance report (verbal)
- CA-VICTORIA-WESTGRID-T2 and CA-MCGILL-CLUMEQ-T2 performances are improved enough to not be in jeopardy of losing T2D status
- CA Cloud Squad Actions [20120626]
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the April 2012 storage pledge.
- HammerCloud [20120214]
- gLite/EMI News [20121127]
- ROC_Canada News [20121030]
- Current shift - Neil Knecht November 5-9, 2012
- Next Week - Simon Nderitu
- WLCG and General Computing News [20120911]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide (Panglia
View):
World-wide weekly ATLAS ADCoS summary (Jan.8-14,2013)
________________________________________________________________________
I. General summary:
---------------
A) During the past week (Jan.8-14,2013) Panda production service
- completed successfully 919,397 managed group, MC production,
validation and reprocessing jobs
- average ~131,342 jobs per day
- failed 116,953 jobs
- average efficiency:
-- jobs ~88.7%
- active tasks: 840
-- distribution by cloud: 4827
CA:248 CERN:83 DE:421 ES:196 FR:706 IT:496 ND:198 NL:465 TW:95 UK:710
US:1209
B) - IT/INFN-T1 DT(SE,SRM OUTAGE:upgrade core switch,storage),Jan.7-10
- NL/SARA-MATRIX DT (SE,SRM warning:mass storage issue), Jan.8.
- NL/SARA-MATRIX DT (CE,BDII OUTAGE:f/s h/w relocation), Jan.11-14.
- NL/SARA-MATRIX DT (CE OUTAGE:upgrade creamce to UMD2), Jan.14-18.
- DE/FZK-LCG2 DT (CE warning:internal rooter maintenance), Jan.8.
- ND/NDGF-T1 DT (SE,SRM warning:network issues at 1 subnet),Jan.7-8
- ND/NDGF-T1 DT(SE,SRM OUTAGE:upgrade core switch,storage),Jan.7-10
- ND/NDGF-T1 DT(SE,SRM warning:updates on some dCache pools),Jan.14
- New ugrent Moriond group-production tasks running since Jan.13.
- CERN/Central Cataloges upgraded with the new gridsite s/w,Jan.14.
- New TRF caches were distributed:
-- AtlasOffline 16.6.70(32+64b)
-- AtlasProduction 17.3.4.6(32b),17.2.8.4(32+64b),17.2.6.2.1(64b)
-- AtlasTrigMC 17.2.7.9(32b)
II. Site and FT/DDM related interruptions/issues/news (+fixed, -not yet)
-------------------------------------------------------------------
1) Tue Jan.8
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : IT/INFN-T1, US/WISC
........................................
- IT/INFN-ROMA1 1K+ FT f./SOURCE:GRIDFTP-ER.:Unable to connect to atlas
-storage-05.GGUS 90135 in progress:disk atlas-storage-05 died,waiting
for relacement.Still 1500|4h f.,Jan.12.The temporary replacement
machine was delivered,Jan.14,and should be presumably in production
by tomorrow evening.
+ IT/INFN-NAPOLI-ATLAS 600+ FT f./SOURCE:INVALID_PATH.GGUS 90136 solved
:2 SE volumes (~20TB) h/w failure.Volumes recovered,Jan.9.
- IT/ZA-WITS-CORE_PRODDISK 400|4h deletion errors/couldn't open conn.to
se.core.wits.ac.za.GGUS 90138 in progress:upgrading from glite to
EMI-2 don,but jobs still fail,Jan.14.
+ IT/INFN-ROMA1,INFN-NAPOLI-ATLAS ~650 FT f./DEST.:FILE_EXISTS.Caused
by h/w failure.see GGUS 90135,90136.
2) Wed Jan.9
-> Cloud/site PROD efficiency ever<50% -
-> Cloud/site DDM efficiency <50% :UK/UKI-NORTHGRID-LANCS-HEP,
IT/ZA-UJ_LOCALGROUPDISK, CA/CA-MCGILL-CLUMEQ-T2, FR/GRIF-IRFU
................................................................
+ ES/IFIC-LCG2_PRODDISK again 8K+ FT f./Space Management step in
srmPrepareToPut failed.GGUS 90131 reopened,solved:not a site issue,
space token close to full.Savannah 134894.
- CA/CA-MCGILL-CLUMEQ-T2 still 1K+ FT f./DEST.:CONN.:SRM.GGUS 90107 in
progress since Jan.5 updated.
+ UK/UKI-NORTHGRID-LANCS-HEP 4800+|4h FT f./SOURCE:CONN.:SRM.GGUS 89936
reopened,solved:the srmv2.2 service had to be restarted again.GGUS
90172 verified:upgraded the headnode to the latest release of dpm.
- FR/IN2P3-LPC 3860 FT f./SOURCE:GRIDFTP_ER.:Unable to conn.to clrdata-
dpm26.in2p3.fr.GGUS 90216 in progress:gsi-ftpd service was dead on
this dpm,restarted.Still the same poblem on clrdata-dpm27.in2p3.fr,
Jan.10.
- IT/ZA-UJ_LOCALGROUPDISK 10K+ FT f./DEST.:INTERNAL ER:Parsing document
'/usr/etc/glite-data-srm-util-cpp.patterns.xml'failed.GGUS 90222
assigned:host cert.on SE expired,have requested a new one and put
the site into maintenance,Jan.10.
3) Thu Jan.10
-> Cloud/site PROD efficiency ever<50% : IT
-> Cloud/site DDM efficiency <50%: IT
............................................
- CERN/ss-pic-ndgf(atlas-SS03) 50% availability.Experts informed.Elog
42055.
+ CERN/AutoPyFactory monitoring on voatlas213:0% availability.Elog
42056,42058 solved:log wan't updated,killed and restarted.
+ DE/UNI-FREIBURG_PHYS-HIGGS 1400 FT f./SOURCE:locality is UNAVAILABLE.
GGUS 90223 solved:the destination file already exists,it was
successfully copied(earlier).
- NL/TR-10-ULAKBIM_SCRATCHDISK many FT f./SRM_INTERNAL_ERROR:timeout.
GGUS 90262 in progress:The load on one of the disk server was too
high to get response.It was resolved,Jan.14.Wating for new transfers.
+ ES/EELA-UTFSM FT f./SOURCE:locality is UNAVAILABLE.GGUS:90290 solved:
temporary problem with main DNS servers of UTFSM campus network,
recovered the same day.
+ UK/UKI-SOUTHGRID-SUSX_DATADISK 3400|4h FT f./CONFIGURATION_ERR.:No
Channel found,Channel closed for your VO or VO not authorized for
transferring between UKI-SOUTHGRID-CAM-HEP and UKI-SOUTHGRID-SUSX.GGUS
90291 solved:5 FTS channels added at RAL,Jan.11.Savannah 134949.
4) Fri Jan.11
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : -
............................................
- FR/RO-07-NIPNE FT f./SOURCE:available CRL has expired.GGUS 90292
assigned:CRL isssue fixed,but still FT f./SOURCE:CONN.:SRM,Jan.11.
- FR/RO-07-NIPNE FT f./DEST.:CONN.:SRM.GGUS 90330 assigned.
+ NL/TR-10-ULAKBIM FT f./SOURCE:GRIDFTP_ER.:globus_ftp_client:the
operation was aborted.GGUS 90337 solved:see GGUS 20262 in progress.
5) Sat Jan.12
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : NL
..............................
+ CERN/CERN-PROD FT f./SOURCE:CONN.:SRM/GRIDFTP_ER.:open/create error:
Function not implemented.GGUS 90338 solved:the FUSE mount on the SRM
server was somehow stuck.Restarted FUSE and BestMan.
+ NL/TECHNION-HEP FT f./GRIDFTP_ER.:server er.421.Service not available
,closing control conn.GGUS 90339 solved:no intervention was done by
site admin,but the errors disappeared the same day.
+ ND/SE-SNIC-T2 ~10K deletion errors/SRM_AUTHORIZATION_FAILURE:
Permission denied.GGUS 90346 solved:temporary issues,errors have gone.
6) Sun Jan.13
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency < 50% : TW,CA
........................................
+ TW/TAIWAN-LCG2_MCTAPE 1003 FT f./SRMV2STAGER:StatusOfBringOnline
Request:SRM_FILE_UNAVAILABLE:All copies of this file are unavailable
for now.GGUS 90349 in progress:~230 job f./Get er.:staging input file
failed.A disk buffer having h/w error,fixed and set online,Jan.14.
+ ES/UAM-LCG2_PHYS-HIGGS 1780 FT f./DEST.:NO_SPACE_LEFT.GGUS 90350
solved:not a site problem,the space token is full and automatically
blacklisted in DDM.
+ US/BNL_ATLAS_RCF ~1400 job f./lost heartbeat.GGUS 90352 solved:known
issue,as this is RHIC (not ATLAS) resource,jobs are evicted and will
be resubmitted.No need to be reported by the shifter.
7) Mon Jan.14
-> Cloud/site PROD efficiency ever<50% : -
-> Cloud/site DDM efficiency <50% : TW
.......................................................
- UK/UKI-LT2-UCL-HEP FT f./DEST.:CONN.:SRM.GGUS 90364 assigned.
- UK/UKI-SCOTGRID-ECDF FT f./DEST.:SRM_ABORTED.GGUS 90365 in progress:
a system problem with one of pool servers.It is back up now.
+ DE/UNI-FREIBURG_PHYS-HIGGS FT f./SOURCE:locality is UNAVAILABLE.GGUS
90372 solved:restart crashed dcache pool(s).
- IT/INFN-LECCE_PRODDISK FT f./DEST.:CONN.:SRM.GGUS 90373 assigned:had
a blackout so the SE has been down until a few hours ago.,works now.
+ IT/INFN-ROMA1 job f./Error in copying :1180 - Globus system err.GGUS
90382 closed:a storage pool down (atlas-storage-05.roma1.infn.it),
and should have it back this week.See another GGUS:90135.
- NL/NIKHEF-PRODDISK 42% FT f./NO_SPACE_LEFT.Savannah 135043:auto
blacklisted.
III. ATLAS Validation,Repro,DDM,ADC Operation Savannah bug-reports
(++ bug understood/fixed, -+ fixed in part, -- not fixed yet)
----------------------------------------------------------------------
-- 17.2.7.5.3 data12_8TeV Reco merge BTAGSLIM task 1133304 failures:
TRF_SEGFAULT|"out of memory:saving summary.Savannah 135063:group
production BTAGGING.Only 3 jobs finished so far, others produced huge
(>15Mb)logfiles and have failed up to 5 attempts in a row at various
US and CA sites due to memory allocation problem coming from Stream
NTUP_BTAGSLIMD3PDMaker.Other affected tasks:1133022,1133276,1133274,
1133268,1133314,1133364,1133409,1133465,1133474,1133479,1133505
having multiple similar failures in different clouds: US,FR,IT,DE,NL.
Tasks are still "running".Poosible memory leak under investigation.
-- 17.2.7.5.3 data12_8TeV Reco merge BTAGSLIM task 1133023 failures:
TRF_UNKNOWN code 65:"failure in an algorithm execute".Savannah 135065
:group production BTAGGING.Only 40 jobs (<50%) finished so far,others
have failed up to 17(!) attempts in a row each at various US and CA
sites due to the reproducible error.Task is still "running".No
comments added so far.
--
LeslieGroer - 2013-01-15