Tier1 and Tier-2 Weekly Report 2013-09-24

General News

  • ADC and ATLAS Computing News [20130924]
    • ADC Weekly meeting
    • Deployment on CERN Agile Infrastructure
      • Some discussion about the deployment of the pilot factory for the CERN Cloud and virtues or not of a puppet configuration
      • Essentially standard RHEL service with no special access requirements
    • Rucio commissioning (call for volunteer sites)
      • The new DDM system Rucio is being tested by DDM operations
      • To test the “full chain” (transfers from/to, deletion) we ask sites to participate in the testing
        • Multiple access protocols will be tested, SRM is not required
      • The foreseen workload for the sites:
        • Discuss the Rucio endpoint setup with DDM ops
        • Provide ~ 10TB of space for the tests
        • Investigate SE logs if something (transfers) goes wrong
      • If your site is willing to participate contact us atlas-dq2-ops@cern.ch
    • AMOD Report
      • On going FT3-Pilot problems affect Functional tests to all sites.
        • Immediate issue solved and requested additional resources
      • Problem with a cached proxy affected functional tests to all sites. (solved)
      • Functional Tests to Tier 1 sites stopped for a couple of days – Santa Claus needed to be restarted
      • Wednesday (18-Sep) – various core routers were upgraded – Outages were plan to be sporadic and brief, but several redundant routers were simultaneously upgraded instead of upgraded in series.
      • Triumf – many 10K’s lost during storage system migration – exact extent being determined
    • Closing external access to ADCR
      • List of collected IP ranges for whitelisting - mostly monitoring and AMI
      • Contact ADC if not on list


  • Security News [20120801]

  • ROC_Canada News [20130625]
    • Current shift - Erming Pei June 24-28, 2013
    • Next Week - Leslie Groer

  • WLCG and General Computing News [20120911]

SSB Results

SSB PanDA Test Queue Availability (month) - this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).

SAM Results

  • site service status via Gridview - Please check your site

APEL Accounting

APEL Publishing Status

APEL Accounting Results

APEL Synchronization Test Links

Site Reports

Alberta

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

SFU

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Victoria

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Toronto

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

McGill

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

TRIUMF

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Australia-ATLAS

Recent Issues

  • summary of this weeks Savannah bugs and GGUS tickets for site:

Outstanding Issues

Production

Summary

  • NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.

  • Within the CA Cloud and Worldwide (Panglia View):



-- LeslieGroer - 2013-09-24

Topic revision: r1 - 2013-09-24 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback