Tier1 and Tier-2 Weekly Report 2014-02-04
General News
- ADC and ATLAS Computing News [20140204]
- ADC Weekly meeting
- ADC Coordination
- Peter Love (Lancaster) and Andreau Pacheco (UAB) will co-coordinate GDP with Rod Walker
- Alastair Dewhurst (RAL) co-coordinate Distributed Analysis with Frederica Legger
- Hammercloud Monitoring/News
- In process of moving HC infrastructure to CERN IT Agile
- New queues are now automatically updated to HammerCloud from AGIS and added to AFTs/PFTs
- Waiting for the AGIS mapping for production queue vs. MCORE queue
- Running athena nightlies FTs since last summer
- Running many FAX related functional test right now
- Adapted HammerCloud infrastructure to be able to submit to Jedi
- Based on panda-clients 0.5.0 - tests can be scheduled already
- Would like to keep direct Panda submission for all FTs in the future
- Can investigate site specific aspects http://hammercloud.cern.ch/hc/app/atlas/siteoverview/
- see slides for details
- Also nightly views - http://hammercloud.cern.ch/hc/app/atlas/nightlytests/
- To do: Add WN information to error report; cloud overview
- Improvement suggestions at atlas-adc-hammercloud-support@cern
- CVMFS problem on Lxbatch
- FTs failing since Monday - various timeouts on SW setups, DBRel IO errors
- Reproducible on lxplus
- Large 2.1 GB latest Dbrel file originally suspected, but CERN squid seems fine with 4GB files and file in use for a while already
- Might be some squid cache thrashing
- "some change in access pattern"?
- Increase cache from 100GB to 150GB and squids from 3 to 5
- Seems improved. Prod online again today.
- FTS3 Commissioning
- Add more clouds to RAL FTS3
- 2013: UK (ex T1), FR (ex T1), NL (ex T1), RU
- 16 Jan: ES
- 20 Jan: TW
- 28 Jan: RAL-T1, NDGF-T1
- 3 Feb: CA
- 4 Feb: FR-T1, IT
- Total: 345/650 DDM endpoints (53%)
- No scaling problems seen so far
- Needed for final Rucio deployment - 2 months to complete?
- Reprocessing Status
- Reprocessing all 2012 data for Egamme, Muons and JetTauEtmiss streams
- Slice test finished in Dec, second and third output validated
- Status: most A-E periods done, continue reco and merging G-M periods
- ADCoS report
- TRIUMF: 40% transfers are failing with security errors (GGUS:100958)
- Rucio renaming
- Ongoing renaming via WebDAV
- INFN-T1 (est. time needed: 1 day)
- WUPPERTALPROD (2 days)
- GRIF-LAL, GRIF-IRFU (1 week)
- INFN-MILANO-ATLASC (2 days)
- CERN-PROD (1 week)
- Ongoing manual renaming (SE renamed locally by site admin, LFC entries updated centrally by DDM ops)
- UNI-BONN (renaming finished, checking for leftovers and lost files)
- UKI-LT2-QMUL (LFC entries updated, waiting for the site)
- Manual renaming (copy out and in – suitable only for small DDM endpoints)
- IL-TAU-HEP (1 day)
- TR-10-ULAKBIM (1 week)
- CA Cloud Squad Actions [20120626]
-
- other cloud squad related savannah and / or ROC ggus tickets [20110705]
- panda monitor for PD2P activity within clouds (default view (last 7 days) units = datasets)
- Open Issues and Ongoing Discussions
- Sites should be providing the 2013 storage pledge.
- HammerCloud [20120214]
- gLite/EMI News [20121127]
- ROC_Canada News [20130625]
- Current shift - Erming Pei June 24-28, 2013
- Next Week - Leslie Groer
- WLCG and General Computing News [20120911]
SSB Results
- Critical tests for each site in the Site Status dashBoard are available at the links below
SSB PanDA Test Queue Availability (month)
- this metric, measured for the analysis queues, defines the site status for data preplacement as alpha (
T2D and avail > 90%), bravo (T2 and avail > 90%) or charlie (< 90%).
SAM Results
- site service status via Gridview
- Please check your site
- April 2012 Detailed Site Information (valid until 20120430):
- TRIUMF-LCG2
- Australia-ATLAS
- CA-ALBERTA-WESTGRID-T2
- CA-SCINET-T2
- CA-VICTORIA-WESTGRID-T2
- SFU-LCG2
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Publishing Status
APEL Accounting Results
APEL Synchronization Test Links
Site Reports
Alberta
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Victoria
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Toronto
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
McGill
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Australia-ATLAS
Recent Issues
- summary of this weeks Savannah bugs and GGUS tickets for site:
Outstanding Issues
Production
Summary
- NOTE: ARDA ProdSys Dashboard has stopped being used by ADCoS team due to information updating issues with the interface. The historical job usage information is to appear separately within ARDA and is being validated. This will be used in the future for information presented here.
- Within the CA Cloud and Worldwide ( Panglia
View):
--
Leslie Groer - 2014-02-04
Comments