Tier1 and Tier-2 Weekly Report 2014-03-18
General News
- ADC and ATLAS Computing News [20140318]
- ADC Weekly meeting
- Rucio Migration and Lessons Learned
- https://twiki.cern.ch/twiki/bin/view/AtlasComputing/RucioCommissioning#Migration_log_and_issues
- Failures at LRZ and Frascati as needed allowfax=True and autoexclusion off during migration
- Taiwan T1
- Rucio authentication failed for Taiwan APF DNs - Need to make sure all DNs with pilot role are mapped to pilot account (will be dynamic in future)
- FR T1 in downtime now and being migrated in parallel
- Plans
- Set allowfax=True set for all queues today
- Turning off autoexclusion is still manual and not bulk
- FR T2s tomorrow
- US cloud – Some sites still using old DQ2 clients
- Catalog registration mostly done on worker nodes
- Want to move to panda registration before migration
- Proceed at ~2 clouds per week to be finished by mid-April
- PanDA Monitoring Log View for files in Rucio Catalog
- Issue: PanDA monitor does not show log files for logs registered to Rucio catalog - link gives File lookup error
- Fix #1: use DQ2 client 2.5.0 to retrieve SURL from GUID, site, LFN (and scope)
- Fix #2: use Rucio redirect to retrieve the SURL
- Fix #3: use Rucio metalink to pick preferred SURL
- Don't use WebDav until couple months later, when it is more popular/debugged by ADC Ops (or DDM Ops)
- Currently, cannot get Rucio OAuth token - fix this within a few days and use metalink file to retrieve SURL and then use SURL in usual way (lcg-cp log to the machine and unpack and expose content to the user)
- Longer term proposals (months?)
- For PanDAmon on AI (SL6) Fix #1 is enough - end April? * Much later: Redirect user to the log file via WebDav?
- Concern how to know if site supports HTTPS browsable files and that users are not exposed to misconfigured WebDavs (e.g. 401 UNAUTHORIZED)?
- Transient Dataset Cleanup and Tasks Obsoletion Procedures
- Reviewing some of the procedures for cleaning up tasks and their corresponding datasets (see slides for details)
- Initial runs of the new procedures a little too aggressive - being revisited with GDP
- T1 primary disk Data Placement policy update from CREM
- Projects other than data*
- Primary datasets not accessed for more than 3 months on Tier-1 DATADISK
- Immediately set to secondary if a tape copy exists
- If a tape copy does not exist, seek permission from relevant co-ordinator to set the dataset to secondary without backing up. If permission is not granted, back up to tape and then set to secondary
- data*
- Primary datasets not accessed for more than 3 months on Tier-1 DATADISK
- Immediately set to secondary if a tape and a second disk copy exists
- If a tape and/or second disk copy do not exist, create at Tier-2 and then set the Tier-1 copy to secondary
- Generating lists now and will check what gets affected and disk usage monitored
- MC Production Status
- Standard MC production
- Christmas backlog is finally done
- Low(er) number of new standard production requests (as expected/planned)
- Filling single core slots with mc14 8TeV simulation
- DC14/mc14 simulation
- Multicore running at ~4k jobs now
- Increasing rate with additional single core simulation jobs
- Common problems: missing inputs (lost files or partly registered) → DDM cloud contacts: please help and look proactively at tickets
- Problems with automatic transient data clean up
- Large samples are broken into smaller tasks, matching of parent and child tasks not fully working
- Some input datasets got deleted too early
- large AF-II B physics samples (1500M events) affected → need to rerun sim and digi+reco tasks
- pilot: problems with release setup - can we move to a plain asetup command and fail immediately if there is a problem?
- Old problem in fortran generators (read-only filesystem) - fix in SL6 kernels >= 26.32-358.11.1.el6 or CVMFS >= 2.1.12 in RW mode
- DC14/MC14 - Progress
- 248M events, 6.7M events/day (last week), 27% of the simulation resources (last week)
- multi core mode is default; single core mode for rate increase and back filling empty single core slots
- Storage
- Only merged AODs are produced for permanent storage - ~20M/10TB AOD per day
- merged full sim HITS go to TAPE
- evgen stays on DATADISK but about 5% of merged AOD, but many replicas
- upgrade (mc12_14TeV) is different (larger files, more RDOs, ESDs, ...)
- Transient dataset clean-up
- Automatic working for unmerged full sim HITS, unmerged AODs, unmerged AF-II HITS (mc12)
- Manual intervention need for AF-II HITS (mc11), RDOs from overlay (move to Alexei's scripts?)
- Write older evgen to TAPE and reduce number of replicas
- Needs redistribution for re-simulation
- File size for TAPE
- Need better communication for non-standard requests
- e.g. 10M RDO/ESD/AOD request in Feb produced ~300TB of files
- Plans
- Normal MC production will continue at current rate
- mc14 8TeV simulation is running quite well (~80M events to go)
- mc14 8TeV digi+reco is waiting for release 19 (~ 1 month)
- mc14 13 TeV simulation is in preparation/validation (multicore, mainly fastsim)
- Some rerunning of IBL upgrade samples (mc14 13TeV) after calibration bug corrected
- JEDI Update on Analysis
- Few power users have been testing and giving feedback - no significant problems
- Fixing bugs in panda-client, JEDI and panda monitoring as they arise
- Invite normal users soon once the monitoring issues are solved
- would be good to have some DAST members try this now to see how to debug problems
- Full migration for analysis in April
- AMOD/ADCOS Report https://indico.cern.ch/event/307170/contribution/1/material/slides/0.txt
- Tue Mar 18: ATLAS_DDM_VOBOXES: ss-lyon,ss-pic-ndgf,ss-cnaf-asgc,ss-triumf degraded. Elog 48442 filed.
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-03-18
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20140318
Topic revision: r1 - 2014-03-18 - LeslieGroer