Tier1 and Tier-2 Weekly Report 2014-04-15
General News
- ADC and ATLAS Computing News [20140415]
- ADC Weekly meeting
- Rucio Migration
- FZK today
- Already done for DE T2s
- UK Cloud next week
- Some problems seen with network connections from WNs - add a "rucio ping" to pilot wrappers
- Some futher cleanup of AGIS paths
- Reaper daemon switched on this week for test datasets first
- Still need finalize US cloud migration
- OpenSSL Vulnerability for ATLAS Central Services
- Scanned all machines
- older than openssl-1.0.1e-16.el6_5.7 on SL6 vulnerable
- older than mod-spdy-beta-0.9.4.2-413 is also vulnerable
- Updating all machines in Quattor or by yum updates on AI nodes
- Restart apache servers
- Revoking certificates (but AI nodes not revoked by CA yet)
- Migrating from Savannah to JIRA
- 26 projects, 7 done, 5 migrating, 9 frozen, 5 for deletion
- Deadline: May 1
- New project: database deployment and ops
- Roles and ACLs a little more complicated in JIRA
- Don't have CC feature (watchers) at moment - being requested
- Only active ATLAS members will be able to see tickets as default for all computing projects
- Optimising Software installation setups - development project
- Mostly for use in HPC environments
- Some issues with missing setup files in CVMFS for 17.7.3.10+11
- Setups seem OK in 19.0.1
- Overload of Frontier by MC Overlays
- Access to multiple connditions instances and pulling in much more data than normal jobs (10-200x)
- Use either DB release files of Frontier for conditions
- MC Overlay can't just use default DB release
- Used to do some of this via HOTDISK but not sure can scale to CVMFS (too many large files?)
- Maybe use IOVDbSvc - larger time windows
- Some dependency and assumptions on how MV Overlay tasks are deployed (where is caching done)
- Bunch-wise lumiosity being accessed but not used
- No single fix or quick solution - being studied and report back in couple of weeks
- NTUP_COMMON Train Production
- Derivation Framework is ready to run as pre-DC14 test - finalizing caches and builds now
- Estimate 300TB data volume, MC TBD
- AMSG report envisaged O(1TB) per derivation but many are 10x bigger - not clear users will be able to access this efficiently
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-04-15
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20140415
Topic revision: r1 - 2014-04-15 - LeslieGroer