Tier1 and Tier-2 Weekly Report 2014-04-29
General News
- ADC and ATLAS Computing News [20140429]
- ADC Weekly meeting
- MC Production
- Quite a few dips in production last week
- With the current status of the system a lack of (medium size) requests for a short period results in large dips in the running jobs
- 36M (FS) and 64M (AF2) for simulation and 170M for digi+reco are in the system
- Ready to launch AF2 200M, FS just a few M
- Might be a larger FS 400M SM group request coming
- Hope this will keep grid busy until the DC14 13TeV sim is validated
- Rucio Migration
- UK migrated last week without issues
- NDG - next week (waiting for new ARC MW release)
- CERN - week after?
- US Cloud
- LUCILLE migrated (was not using panda mover)
- AGLT2 - turned panda mover off and no issues, so migrate next week. Other to follow
- Panda Pilot Update (58k)
- Switching to FAX site mover for transferType xrd/fax (used in HC)
- Updated replica loop so can grab replicas from different catalogs
- Updated process killer to alleviate problem with lingering AthenaMP orphans
- Only setting ATHENA_PROC_NUM when NCores > 1 to prevent AthenaMP using 1 process only
- Use --cksum if available in xrdcp
- Updated the Panda Logger URL
- Corrected ERR_NOATHENAMETADATA --> ERR_NOPAYLOADMETADATA
- Exporting System Libraries for ATLAS on Special Facilities
- Provide solution for ATLAS production jobs on clusters with base SL6 OS image and no further assumptions
- Based on Parrot to get the CVMFS image
- Slides
- [[http://indico.cern.ch/event/307176/contribution/4/material/slides/0.pdf]One pager]]
- AMOD/ADCOS Report
- Transfer issues in NL cloud
- MPPMU groupdisk data lost, 80K files
- IN2P3-CC storage full, blacklisted for writing
- Migration to Jira of the main projects used by shifters
- Reprocessing Status
- NTUP_COMMON v2 production is completed
- Train Production
- Derivation framework is ready to run train production on NTUP_COMMON as input as a pre-DC14 test
- Build cache today
- Expected data volume 300TB. Bulk should take about a week
- Collecting MC samples from groups now
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-04-29
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20140429
Topic revision: r2 - 2014-04-29 - LeslieGroer