Tier1 and Tier-2 Weekly Report 2014-06-24
General News
- ADC and ATLAS Computing News [20140624]
- ADC Weekly meeting
- Reprocessing
- DC14 reprocessing: first test of rel19, xAOD production and new transforms
- Slice test ready, waiting on final release and cache, test all streams
- Express stream after slice test - wait for DQ2 signoff before launching bulk reprocessing (~ 2weeks?)
- https://twiki.cern.ch/twiki/bin/viewauth/Atlas/DC14Reprocessing
- Replacement of missing AODs in several 2012 streams: Now completed
- Data 2010 HI: filtered for good events with peripheral collision properties and reconstructed with rel. 17 tracking for comparison with 2013 p-Pb data
- First full processing of the ZeroBiasOverlay stream, full 2012 data - almost done
- Rucio Migration
- ProdSys2 Commissioning
- MC Production
- DC14 - meeting today to identify status more precisely
- 19.0.2.1 failed - likely to build 19.0.3 this week
- As so far behind, probably start with single core production next week while athenaMP and other validation issues are followed up
- Ubuntu setups
- Rel 16.6.7 fails setup on Ubuntu as some non-POSIX compliant shell scripting
- Fixed in CMT v1r24 (2011) - either install this or update setup scripts in 16.6.7 (with CMT v1r22)
- Needs testing in production environments
- ATLAS File Sizes
- T1/T2D Selection
- Distribution of T2Ds by cloud based on algorithm described last week
- New feature: additional clouds can be chosen manually (put after auto - selected ones)
- Also have on/off switch for clouds and full manual override of mcp
- Update every 3 day and choose 3 foreign clouds per T2D site
- Exclude ANALY, MCORE, TEST sites for now
- Turn on algorithm in ~1 week (after email)
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-06-24
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20140624
Topic revision: r1 - 2014-06-24 - LeslieGroer