Tier1 and Tier-2 Weekly Report 2014-07-15
General News
- ADC and ATLAS Computing News [20140715]
- ADC Weekly meeting
- Rucio migration
- Started testing 1M files/day last week - uncovered some issues
- FTS prod and pilot share same DB - ask to separate these
- Keeping up with deletions from all the tests combined with other catch-up data deletions caused T1 overload
- A bottleneck in the polling of FTS jobs has been identified and being fixed
- Decrease back to 100k files/day for the meantime
- Start testing some T2's as well in chain
- Test more sites with deletions through https
- DDM and PanDA discussions on integrating Rucio
- New testing rucio-aware DQ2 client (rc6) being released this week
- Start validating
- ProdSys2 - Validation and Testing
- evgen: running for most use cases
- sim: container with more than one dataset will be addressed by automated registering (secondaries) the evgen datasets in the clouds
- merging and pileup: working but need more testing
- post-production: work being done on retries
- fix tasks not starting until previous task is finished
- Group productions - about half way through validations (event by event comparisons)
- Part of express stream reprocessing is running on ProdSys2
- Deletion Service status
- Some file deletions affected by gfal library bug in migration from LFC to Rucio (lacking Scope) - caused massive slowdown
- Regular transient data cleanup was not running since April till June (usually runs monthly)
- Catmore policy (cleanup of data untouched for 6 months) was re-applied again in July
- Huge backlog being worked through now - added two more nodes (5 total) - expect a week to catch up?
- e.g. BNL, RAL - ~90k datasets, TRIUMF 45k
- MWT2 reports 6 million dark files, 120TB
- Rucio dumps are now available, we need to have a dark data check on all the sites.
- MC Production
- Run 1: DC14 8TeV digi+reco submitted last week - 450M events, single core, half-way done (20M / day)
- round of 19.0.3.X validation ongoing in parallel to production, including multicore validation (sign off today?)
- Run 2: DC14 13TeV submitted last week - 275M events, mcore, 5M/day (hope for 7/8M/day)
- digi+reco: still to be validated - 19.1.1 to be built this week - tight schedule as need to start in September
- DC14 utilizing a fair fraction of compute resources now
- Expect 150-200M events/week (sim+digi/reco)
- + AODs, correspond to around 180-220 TB per week, or 0.7-0.9 PB/month (includes merged HITS and AODS)
- ADC Shifts
- Merge ADCOS + Comp@P1 shifts
- ADCoS very busy already
- Setting up checklists now and organizing tasks
- More monitoring tools and automation for some of the tasks (ease shift summaries etc)
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-07-15