Tier1 and Tier-2 Weekly Report 2014-08-05
General News
- ADC and ATLAS Computing News [20140805]
- ADC Weekly meeting
- Rucio Commissioning
- Reported issues last week with PandDA lookup delays - timeouts when PanDA tries to resolve many (thousands) of files in Rucio file catalog
- Rucio team made some query and cache optimizations
- PanDA servers updated to latest Rucio clients
- More servers added to Rucio production server pool
- The timeouts errors were not reported anymore
- Last Saturday grid started to drain
- Almost no simul jobs, but only pileup
- Jobs were not brokered because of slow resolving of big bulks of files having replicas on many sites
- On Monday Tadashi changed brokering algorithm to put less pressure on Rucio
- The reason of slow response is not fully understood (DB load is OK, CPU load on Rucio servers is only slightly higher than usual)
- The issue will be followed up further with Rucio devs
- Rucio - PanDA Integration
- PanDA developers are in process of validating latest (2.6.0) DQ2 client
- Many things changed inside DQ2 client to support Rucio as a backend
- Issues reported to Rucio during the validation are under investigation of Rucio devs
- Plan to ask HC to use the latest DQ2 client (and register part of the produced output datasets) when these issues are resolved and DQ2 client validated by PanDA team
- MC Production
- (last month): 513M events (111M in past week, 16M/day)
- (last month): 999M events (127M in past week, ave 18M/day)
- Rate has been reduced in past two weeks, mainly due to Rucio issues
- About 150M events full sim (55M mcore), 175M reco in system to be processed, 140M full sim/230M AFII to be submitted
- DC-14 status
- Digi+Reco 8TeV: Most of the Release 19.0.X full campaign is finished (360M in single core)
- Simulation 13TeV: New geometry and using mcore
- 190M out of 380M finished, lots of the remaining launch yesterday
- Digi+Reco 13TeV: Release 19.1.X built but not yet validated. First validation tests showed a memory leak (being discussed now) that will be fixed fast and new cache built.
- mcore not yet validated and needed for production: also in discussion now
- May need an increase of mcore resources as early as next week (380M to do, don't know rate yet)
- Sim@P1 available from 15August (2.1k jobs slots)
- Reprocessing
- DC-14 full express stream: reconstruction and HIST merging done; replicated to CERN. ESD/AOD merging ongoing, problems with memory usage and preservation of lumiblock boundaries
- Require 500TB for xAOD and ESD - no replication policy defined yet for xAOD (still labelled AOD in dataset name)
- 2010 HI peripheral events: output merged NTUP. Problems with skimming blocking jobs and whole tasks (if the 10 scout jobs fail)
- 2012 DRAW_ZEE: test with one run done, waiting for feedback from egamma
- Bulk reprocessing - hope to start end of this week
- JEDI
- Agreed to switch user analysis to JEDI Aug 12 16:00 CET
- Will be announced by email
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-08-05