Tier1 and Tier-2 Weekly Report 2014-11-04
General News
- ADC and ATLAS Computing News [20141104]
- ADC Weekly meeting
- Rucio Status
- Almost ready for final stage of commissioning - having all datasets in and managed by Rucio
- A lot of effort has been done recently to get to this point - working on final small details
- How to map DQ2 subscriptions to Rucio rules/locks
- Mapping of DQ2 replica classes primary, secondary etc
- Mapping of DQ2 dataset owner to Rucio account
- Protection for custodial data
- Migrating 6M datasets will take a long time
- Done by DB procedure run by Rucio dev, but most (unused by running jobs) can be done in background
- Reminder: New DQ2 client can use datasets in DQ2 and Rucio
- ~50k datasets are "active" in panda/DDM subscriptions at any one point
- To move those have to pause panda and stop DQ2 site services
- Any open subscriptions will be picked up by Rucio
- A date has not yet been set but likely mid-November
- First the procedure needs to be thoroughly tested
- Still a few small Rucio bugs to fix
- Derivation Production
- Full production on DC14 8TeV MC and period B samples was launched with AtlasDerivation-19.1.4.1 on October 20th
- Data processing essentially done
- Input data sets 60-80TB, output datasets about 70,77% for Muon and Egamma and 24% for JetTauEtmiss
- MC with skimming done, with no skimming about half done
- Output size about 32% for skimming
- Validation tasks on DC14 13TeV MC submitted on Monday with AtlasDerivation-19.1.4.2
- Good progress so far except the merging ratio. Requested files to be merged to 1GB instead of the default 4GB, however files are around ~100MB and less, being investigated
- Full production to be launched earliest possible (today?)
- Total input volume 222TB - can make rough estimates on output size but some groups are using truth thinning and trigger skimming so this will tend to push these sizes down
- There are a lot of no-skim SUSY requests in 13 TeV so this might be a bigger portion.
- MC Production
- Grid not too busy in recent weeks, and not much in system right now
- 140M fullsim and 180M AF-II to be submitted (from requests in last couple of days plus some special configurations which are currently being set up)
- Also will ask PC about more requests
- ProdSys II production
- Currently most DC14 requests being sent to ProdSysII
- Amounting to only ~150k FullSim so far (still learning the system)
- More to be sent in the next week, ~20M.
- Will start with MC14 standard requests - Validation sample A ready - should get feedback soon.
- Some work needed on notifications, features needed in JIRA ticket request - needed within a couple of weeks
- Experience on setting up xrootd and webDAV at IN2P3-LAPP
- Main issues with monitoring in a multi-VO environment
- PanDA Pilot Update
- Next pilot version 59d
- Numerous minor fixes/updates
- includes glExec update from Edward Karavakis to resolve issues at two Canadian sites that do not have the $GLEXEC_LOCATION environment variable set
- Also need to skip core count check to facilitate installation jobs on MCORE sites
- PanDA Pilot now available in GitHub - https://github.com/PanDAWMS/pilot
- Discussing now how to update the tarball scripts
- Idea: wrappers will primarily cp the pilot from cvmfs, and secondary/alternatively using https from server
- Pilot source in cvmfs updated every 4 hours, immediately upon request for emergencies
- Logs to BNL object store for prod/user jobs
- Not replacing standard SE transfers
- Starting with a couple of US queues (at SWT2)
- Tests pending release of new pilot
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-11-04
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20141104
Topic revision: r2 - 2014-11-04 - LeslieGroer