Tier1 and Tier-2 Weekly Report 2014-12-09
General News
- ADC and ATLAS Computing News [20141209]
- ADC Weekly meeting
- MC Production
- ProdSys-2 new validation samples finished - waiting for plots
- Checking some configurations (mc12 AFII tags, mc14 evgen transforms)
- Definite improvement in getting samples through the sytems but fair number of open issues in getting tasks defined, extending a task if necessary, reconstruction for container with more than one dataset, etc.
- Derivation Production
- 13 TeV alomost completed
- Duplicated tasks aborted, dataset containers cleaned up, actual deletion on tid datasets have not started yet.
- AMI is not receiving activeMQ messages from Rucio yet, but should be soon
- Need to rely on what dq2 shows for this production
- Difficult to follow the tail of the production - did all tasks complete, which need retries etc.
- Eight derivations (HIGGS and SUSY) had a sample-dependent software error so resubmitted
- 8 TeV Derivation - Second round of production is basically done, tails to be taken care of
- Fairly long discussion about the issues with the new tools and checking how production is going and where failures coming from
- Some highlights/notes from the ATLAS Facilities Jamboree
- Rely on the fact that networks are vastly improved globally
- Many T2 and opportunistic T3 resources can be as large as T1 (tape is the only differentiator)
- Break the coupling between cpu and storage (or CE and SE)
- Define ATLAS Storage pool as:
- TAPE
- STABLE disk storage – T1 + reliable T2 (former T2Ds) - use for primary, custodial data (including production final output)
- UNSTABLE disk storage – less reliable T2s - use for secondary data
- VOLATILE disk storage – unreliable T2s, T3s, opportunistic storage - don't replicate datasets, but can host LOCALGROUPDISK, Rucio cache etc
- Run 1 had prod/analy ratio about 75/25, expect Run 2 to be more like 90/10
- Reduce or avoid merging if possible - jobs are inherently bigger
- Define an ATLAS Site Availablity Performance for analysis (ASAP) metric (starting in January)
- Replace the ABCD definition
- T2S: STABLE, ASAP>90%; T2U: UNSTABLE 90%>ASAP>80%; T2V: VOLATILE 80%>ASAP in last 3 months (to be tuned)
- T2V may be demoted to T3 by ICB
- Above metric may be too simple (e.g. no explicit network measurement)
- Adding the T2 STABLE space (about 50 of current 80 T2 SE's would qualify) doubles space available for production
- Also should reduce ANALY pressure at T1s
- Also try and keep jobs within < 1day CPU (especially with mcore); preferably 6-12 hours, tune with JEDI and scouts - much easier to schedule
- Eventual goal may be global "cloud" where tasks are not brokered to a particular cloud/site
- can specialize site base on resources available
- Could be useful to look at https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ADCOperationsDailyReports2014
each day (written after 9am operations meeting)
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-12-09
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20141209
Topic revision: r1 - 2014-12-09 - LeslieGroer