Tier1 and Tier-2 Weekly Report 2014-12-16
General News
- ADC and ATLAS Computing News [20141216]
- ADC Weekly meeting
- Rucio
- Slow transfers - Problem at BNL FTS3 over weekend affected whole system
- Staging from tape was broken until yesterday
- Message consumer for FTS transfers is turned off due to database contention issues caused by first issue
- Deletion is on for all endpoints except TAPE and LOCALGROUPDISK
- We urgently need space on T1s before Xmas break
- Problems with webdav on many dCache sites (suspect v2.10+). Deletion was switched to SRM
- Blacklisting/downtimes: A new collector was written for AGIS for automatic blacklisting
- Recovery of lost files is being tested
- Accounting is getting there
- Fixes in DQ2 clients for panda/DaTRI
- Message for cloud squads
- Everything related to DQ2 will be switched off TOMORROW
- No bourricot monitoring
- No DQ2 clients < 2.6 will work
- The central catalog database will be kept for data mining etc.
- Group Production
- 13 TeV Derivation Production
- 8 broken derivations from the first round submitted last week with new cache AtlasDerivation-19.1.4.4 (about 2/3 done)
- Tail of the first round of production to be taken care of - still need to determine which tasks should be retried among finished/failed/aborted
- 8 TeV Derivation Production
- 2nd round of production is over, tail is to be taken care of once determine which tasks should be retried among finished/failed/aborted
- Waiting for activeMQ messages to be turned on by Rucio team, current dataset counts in AMI
- Production Plans Over Holidays
- No new production planned
- All production requests have been submitted and in the system already
- Would be great to finish up the remaining jobs/tasks by the end of this week
- MC Production
- Production System : Main issues
- Duplicated events : using output from failed jobs in the next steps of the chain.
- Need to know the samples affected.
- Pileup distribution wrong in retries due to wrong random number seed - fixed by using SEQNUMBER for the random seed and jobNumber
- Extending Samples : Discovery of previous files processed with the same configuration such that we do not reprocess same things again - PRODSYS-328
- Several datasets in container : Now we can not process a task (digi+reco) which has to use two datasets - PRODSYS-327
- Production System : Xmas break and Storage
- About 100-150 Mevts in the system being processed now (~150 TB)
- Pending requests so far : 160 Mevts Full Sim Mevts (~200TB)
- Expected : requests will arrive up to Thursday, the optimistic scenario would include the min bias samples for MC15 during Xmas
- If need to reprocess everything since Rucio started : 30 Mevts Simulation, 140 Mevts digi+reco (no additional storgage)
- Adding all together ~ 300 Mevts simulation and 400 digi+reco.
- This would keep the grid busy mostly for the Xmas break, almost all is multicore.
- Probably add a 20-40% safety margin to the numbers due to last minute requests
- ADCoS Report
- Data transfer failures to several sites with full space tokens. Part of the reason recent pause in deletion service. Several Jira tickets opened on full space tokens.
- Some job failures due to full spacetokens
- Some open tickets about the absence of auto-blacklisting, while it is decommissioned as part of dq2 and reimplemented in Rucio
- FZK-LCG2, (GGUS: 110693) job failures with stage-in error, caused by dCache bug, when gridFTP doors get unresponsive.
- Waiting for a fix from dCache developers. Also significant level of deletion errors, looks like also related to new dCache version.
- High job failure rate yesterday at all multicore queues, with could not register location error (eLog:52258). Due to conditions when RSE was considered invalid and replication rule failed.
- Shifters finding it a little difficult to monitor deletion services and need some guidance from experts
- Next meeting: Jan 6, 2015
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2014-12-16
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20141216
Topic revision: r1 - 2014-12-16 - LeslieGroer