Tier1 and Tier-2 Weekly Report 2015-05-05

General News

  • ADC and ATLAS Computing News [201500505]
    • ADC Weekly meeting
    • Rucio Status
      • 0.3.3 in production since Apr 27
      • New validation checks in place
        • Metadata validation against AMI definition
          • automatic propagation of metadata from name to Rucio
          • see rucio get-metadata
        • Dataset name validation against AMI
        • PFN validation - the provided PFN (optional parameter) must correspond with prefix registered in Rucio for given DDM endpoint
          • e.g. it is impossible to register srm://se01.esc.qmul.ac.uk/atlas/atlasproddisk in UKI-LT2-QMUL_DATADISK
          • Enforced since today
          • Registering files can now return "One of the PFNs provided does not match the Rucio expected PFN."
      • Cloud administrators have now permission to declare files bad
        • See rucio-admin replicas declare-bad -h
        • https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/DDMLostFiles
        • Reminders:
          • If a file is lost from tape, it will be recovered under a different filename (we never overwrite on TAPEs)
          • It's up to site admin to remove lost file from the namespace of the SE
          • The files declared bad must be specified using srm:// protocol
          • Monitoring: https://rucio-ui.cern.ch/bad_replicas/summary
        • Cloud admins (members of e-group atlas-adc-cloud-XX) have attribute cloud-XX set to "admin"
        • Can check admin capability:
          • $ rucio-admin account list-attributes --account dcameron
          • cloud-nd: admin
          • country-no: user
        • Several files reported as available in Rucio but missing on SE, caused by FTS load issues
          • FTS patch to go in production this week already scheduled by FTS3 admins
            • The impact being investigated by Rucio team, to be fully understood this week
          • Remnants of a previously known/fixed bug
            • Only identified these files recently
            • Also to be understood fully this week
          • Please report unavailable files in ATLDDMOPS JIRA
    • Derivation Production
    • Reprocessing Summary
      • 2012 Muon production:
      • 2015 Cosmic runs from Period C2 in release 20.1.4.6
        • https://twiki.cern.ch/twiki/bin/view/Atlas/ReprocessingCampaigns2015#5_Reprocessing_of_2015_cosmicMuo
        • 23 runs, physics_CosmicMuons stream
        • Output AOD, ESD, HIST, NTUP_MUONCALIB, all to be merged except ESD (HIST x3)
        • Status now: 21/23 runs done, with coherent merges now also completed
        • Started Monday 20th April, has been difficult to complete
          • Large memory consumption problems, lots of reco jobs have required large amounts RAM, up to 10GB
          • Runs 259196 and 259771 will need to be redone, and have more than one reco job per input RAW file
          • Looking into solutions, verifying what works for MC works for data
        • Many (15) lost reco output files, corresponding to lost inputs to the merge jobs, details in ADCSUPPORT-4196
          • Recovery of files currently only treats reco part: merges get broken due to picking up replacement files coming in
          • Only solution is to obsolete the original merge tasks and resubmit them
          • Some lost file declarations in Rucio (specifically the formats that were not actually lost) not propagated to AMI
        • Workflow being discussed further this week
      • MC Production
        • Lots of simulation already processed about 700M
        • About 200M ready to launch, more to come
        • Pileup going quite fast too, about 250M already reconstructed despite the low efficiency
        • Proposals to improve pileup efficiency
          • simul: 500 events/job - 5-10h walltime, HITS = 0.4-0.5GB
          • merge: 2000 events/job, 4 HITS input = 1.6-2.0GB
          • pile: 2000 events/job, 3-4h walltime, HITS input: 12x0.7GB (minbias high), 12x2.1GB (minbias low), 1.6GB (signal) = ~35GB
          • merge AOD: 10k events/job - 5x0.8GB AOD - 4GB AOD
          • Concerns:
            • May hit the 1 day limit for some of the simulation jobs
            • Need to check if prodsys2 / mcore needs modifications to deal with more than one EVNT input file.
            • To reduce number of transfers we may need a new merging of the minbias
            • We need to test efficiency of 1k, 2k, 2.5k jobs (would 5k be possible?)
            • Need to check with Simulation the optimal usage and need of minbias events.
          • Propose to keep the 50ns campaign (already running) with the current configuration and change for the 25ns campaign (sign-off will happen soon).
          • Will get into trouble with the minbias file ratio.
          • Might be easier to keep the 1k merged HITS...or just something a bit more efficient.
        • MC15 simulation: will start producing additional simulation for the 25ns configuration.
        • MC15 Digi+reco: once the 25ns configuration is finished (missing trigger) will start processing the existing MC15 HITs with this configuration
          • Extension of the existing HITs will only be processed with the 25ns configuration (not 50ns setup).
      • Computing Run Coordinator role slated to start now
        • Being discussed at management meetings this week
        • Do have about a dozen people signed up for ADCoS shifts
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2015-05-05

Comments

Topic revision: r1 - 2015-05-05 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback