Tier1 and Tier-2 Weekly Report 2015-05-26
General News
- ADC and ATLAS Computing News [201500526]
- ADC Weekly meeting
- Rucio Update
- Ran stress tests May 22
- Simulation of 1 day of data taking (66TB, T0 export to 3xT1, 1xT2)
- T1 to T2 replication of mc15 AOD (170TB, 1xT2)
- All went well, the transfers finished in 24h, except long tail to some T2s
- Data replication policy for 2015 data decided: https://twiki.cern.ch/twiki/bin/view/Atlas/ReplicationPolicy2015
- data15_13TeV: T2s are selected from the following criteria: more than 400TB capacity in DATADISK and more than 90% availability for analysis in the last 3 months
- Rucio pre-production testbed is being set up
- New releases will go there and take small percentage of load for one day
- If all ok then deploy on production nodes
- Lost files from FTS double submission
- Investigation into the impact of the problem reported 2 months ago has finished
- Only ~2000 files were lost as a result
- HLT Reprocessing for Run 2
- Preparing for week 1 starting this week (see slides for prepartaion and testing details)
- Normal HLT Reprocessing requirements:
- Purpose: release validation, weekly cycle
- HLT+reconstruction+merging
- Looking for subtle differences between histograms so no failures
- Large sample to find rare bugs/crashes
- Data set: Enhanced Bias: e.g. data12_8TeV.00212967.physics_EnhancedBias 1773 files 1M events
- Often add reprocessing of signal skims to check efficiency
- HLT mem 3.7GB, reco mem much higher (still investigating if there is a bug)
- Results on group space at CERN (CERN-PROD_TRIG-HLT)
- Aim for 24h turnaroun
- Start up time depends on general CERN and Grid status, data replicas and memory requirements
- Highest priority other than exceptional tasks
- Run where data is:
- CERN for data just taken
- Tier1 sites once they have replicas (we can make more for hot datasets)
- Memory requirements
- HLT only < 3700MB can run at any Tier1; 7-24 hours
- HLT+Reco requires HI-MEM queues, limited slots can be a bottleneck; 36-60 hours
- CRC Report
- Not much to report - fairly smooth shift
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-05-26
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20150526
Topic revision: r1 - 2015-05-26 - LeslieGroer