Tier1 and Tier-2 Weekly Report 2015-06-09
General News
- ADC and ATLAS Computing News [20150609]
- ADC Weekly meeting
- MC Production
- Grid running at max capacity last week
- 120M simulated events, 440M of digi+reco
- Currently close to 250M of events are already in tasks waiting to be simulated and more waiting to be submitted
- New minbias pileup with the truth jet fix under way. Once they are distributed they will be use for standard 25ns and 50ns reconstruction
- Fix for jobs causing huge log files already in 20.1.4.14.
- Pileup efficiency seems about 70%
- Some issues with some sites not setting wallclock in AGIS. Might need 2 days for some jobs
- Derivation Production
- Open-ended derivation production on stable beam data
- First AOD dataset appeared at Tier0 on Saturday night, open-ended production request was placed in ProdSys2
- First tasks were defined automatically (after a small fix) on Sunday
- Submitted manually on physics_MinBias stream. Will set up open-ended production on physics_ZeroBias
- All 13 TeV derivation processing can be monitored at:
- Train configurations defined (16 physics, 1 min-bias) with sub-carriages
- Production Status
- Turnaround from first 2 runs were pretty good
- 2 days - calibration loop (beamspot, hot/dead channel identification)
- 28 hours - reco/merge at T0
- 24 hours - most (11/14) derivations finished, many in 6 hours
- 4 days achievable but takes lot of supervision at the moment, probably won't achieve this in steady states
- Third/fourth rus had some issues (900 Hz vs 200Hz, smaller RAW event size)
- many individual jobs took over 12 hours + retries
- more typical of Run 1 experience
- Still tuning the system
- Around 80 derivations in ~15 trains
- Sizes are mostly under 1% (few under 10%)
- CPU times 40-400ms/evt (jet1 in particular very heavy algorithm)
- Event Index Status
(see slides for details)
- Get EI from permanent EVNT, AOD and DAOD for all data (real and simulated) based on AMI
- ProdSys2 recognizes new datasets as they come in and defines tasks to run the EI producer
- short jobs (30 min for 50 AOD files)
- High T1 weights
- Most tests OK - all jobs sent from CNAF to TRIUMF due to MCP failed
- Tape Usage at SARA-MATRIX
(see slides for details)
- Brief overview of ATLAS use of tapes at SARA-MATRIX.
- No issues.
- 4 of 6PB used.
- Can likely increase usage/bandwidth without issue
- CRC Report
- Not calm week, but not major issues
- Daily activities at https://twiki.cern.ch/twiki/bin/viewauth/AtlasComputing/ADCOperationsDailyReports2015
- Some issues with FTS bringonline fixed but still issues at INFN-T1
- Likely will update all FTS servers again this week
- Been transferring about 40Hz peak, 10GB/s
- Close 20 200k running slots used
- HLT Reprocessing went well
- Target was <24h, DONE within 14h20m !
- Following up on open issues
- Some files not being added to dataset correctly
- Open-ended derivation ran well - one task out of 27 still running this morning
- Timeline for EPS conference starting July 22
- Concentrate on high-mass strong production searches using 50 ns data
- Candidates: dijet resonance & angular, multijet & lepton+jets BH, gamma+jets
- Push as much as possible to include all data before machine studies
- Goal - try to reduce calbration loop from 48h to 24h and reprocessing to 24-48h
- Expect derivations for critical physics streams can be done in 12h
- Try to have data for users within ~3days
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-06-09