Tier1 and Tier-2 Weekly Report 2015-07-21
General News
- ADC and ATLAS Computing News [20150721]
- ADC Weekly meeting
- ADC News
- Decommisioning old DaTRI interface July 27
- No major issues reported for new DaTRI
- Lost files report
- Due to an issue between Rucio and FTS (solved end of June)
- Double FTS jobs causing entries in Rucio but not on disk
- About 2M double jobs, 15k files completely lost, ~30k recoverable
- Storage Consistency Checks
- DDM OPs working on automating the checks for dark and lost files
- Started with T1s last week, follow up next week
- Overview of storage:
- T1 pledged disk: Total/Used SRM 46.4/39.2PB, Used Rucio: 37.5PB
- Difference Total SRM vs Used SRM: 7.2 PB (15%)
- 2PB new unused space in RRC-KI-T1
- 3.9PB 10% space buffer on DATADISK
- 0.6PB 50% space buffer on SCRATCHDISK
- 0.7PB unused BNL SCRATCHDISK (0.5 PB was moved after we made this table to DATADISK), PRODDISK and GROUPDISK
- Difference SRM Used vs Rucio: 1.7PB
- 1PB temporary datasets
- 0.7PB dark data (0.5PB DATADISK)
- T2 pledged disk: Total/Used SRM 57.8/41.3PB, Used Rucio: 39.3PB
- Difference Total SRM vs Used SRM: 16.5 PB (28% of total)
- 4.4PB space buffer on DATADISK
- 1.2PB space buffer on SCRATCHDISK
- 0.9PB space buffer on PRODDISK
- 10.2PB unused space
- N.B.: Some is space added for new pledges
- Difference Used SRM vs Rucio: 2PB
- 0.8PB temporary datasets on PRODDISK
- 0.4PB temporary datasets on DATADISK
- 0.8PB dark data
- Storage Space optimization:
- Clean up of remnants of DQ2 to Rucio migration: files not belonging to any datasets and without tombstone: 30.2 M files (~800TB logical, ~600TB physical) were deleted last week
- Not belonging to any dataset but with tombstone: 20.2M files - not deleted yet until space needed (tagged for deletion)
- Some discussion about secondarizing DC14 data (4PB disk, 1.5PB tape) - approved by CREM and announced but some physics groups still vacilating * Lifetime model: June list datasets secondarized 20th July (0.6PB disk, 0.4 PB tape)
- Rebalance percentage of primary vs secondary. Should be "similar" for T1 and T2
- Constructing dataset list for move now
- Need to review the amount of secondary we can replicate on Tier2s, in particular we need to review PD2P: this will be done in the coming weeks
- PRODDISK is being merged with DATADISK to more effectively use the space: 1st site done last week, no problems
- Derivation Production
- Have been running mostly successfully with open-ended technical containers
- Couple of issues with calibrations for TRT with new gas mixture and getting this into the conditionsDB - could not process last couple of runs
- Too late anyway for EPS conference
- MC Production requests so far have come through Jira tickets.
- Physics groups would like to be able to run with open-ended technical containers similar to data - may be possible for some
- In the meantime Prodsys2 providing new DEFT interface to speed up submission of MC derivations, bypassing the Jira
- T0 Report
- Two small runs still in pipeline (36h calibration loop ends today)
- Remaining runs taken until Thursday (up to Run 271744) fully processed
- calibration loop successfully shortened from 48h -> 36h -> 24h
- Timely completion of ES-1 and calibration processing
- Working on understanding tails
- Target: time for reco and AOD merging (until start of derivations) < 24h
- Reached for majority of runs, up to 28-30h for some
- Speedup: AOD merging strategy
- Most slow/stuck jobs seem to be on 32-core machines - investigating with IT
- Spill-over validation exercise in progress
- Complicated by large number of small outputs
- Will implement continuous spill-over of small stream (ZeroBias) to check readiness of system
- Cloud Support + Operations Discussion
- Motivation for discussion
- Need for good liaison and support for every site in ATLAS
- Many new sites and new countries
- The "cloud" hierarchy is no longer very meaningful in ATLAS (no local LFC, FTS, automated switcher etc)
- Review where we are
- No decision has been made to “drop” cloud squads
- Thanks to those who responded with feedback
- See slides
for history and feedback
- Cloud Support (in theory)
- A liaison between sites and ATLAS
- Site admins are not generally ATLAS members
- ADC has no direct contact with sites
- Help for new sites to join ATLAS
- Initial help to get started and building a network of support
- Triage of ATLAS related problems
- Cloud support translates ATLAS problems into something a site can understand and fix
- Handling of notifications (HammerCloud, switcher, DDM space)
- Site support is accounted differently
- We should not mix up cloud and site support
- Feedback - well-supported clouds feel current structure works well
- What works well
- Clouds with central coordination
- Clouds in one geographical area
- Also to some extent sharing linguistic/cultural bonds
- Clouds where people are paid to do cloud support
- What doesn’t work
- Clouds with no geographical or linguistic connection
- Fragmented support within the cloud
- Support of small sites outside the T1 country
- "We’re not sure where to put new site X, let’s just put it in cloud Y"
- Asking cloud support for non-site related problems
- OTP Credits
- ~17 FTEs in 2014
- Credits do not reflect what we in ADC define as "cloud support"
- They tend to be awarded for anything that touches ATLAS computing
- Non-ATLAS specific development projects
- Bureaucratic/management roles
- Possible solutions
- A support contact per site will not work
- Not scaleable and most sysadmins are not ATLAS people
- Support centres per country (funding agency)
- A catch-all support for small/disconnected sites
- Create a forum where all the Squad can share their issues?
- dedicated people for catch-all
- Identify one clear coordinator for each Squad (plus one deputy)
- regular meeting (O(monthly)) between ADC and Squads to identify the actions to be done and the activity done
- Short report from German Cloud Support
- Lots of discussion and some suggestions - notes will be sent by email
- Will take this up again in September at ATLAS S&C week
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-07-21
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20150721
Topic revision: r1 - 2015-07-21 - LeslieGroer