Tier1 and Tier-2 Weekly Report 2015-07-27
General News
- ADC and ATLAS Computing News [20150727]
- ADC Weekly meeting
- ADC News
- Running steadily at 200k job slots, up to 100TB/day transfered
- Tier-0 farm not filled by grid jobs when no T0 activity - being investigated
- Pathena still depends on DaTRI
- Discussion ongoing about notification of lost files to physics analysis users through Rucio
- Corrupted DB release 28.8.1 caused disruption in sim production
- Fixed DB released assigned to jobs at time of task creation
- Probably should be in ProdSys definition - fair amount of discussion
- GGUS was down on Sunday - notification to GOCDB but not received by ATLAS shifters
- Some issues with CERN EOS last wednesday (namespace mapping to PanDA resource). Patch in HC for now.
- MC Production
- Very stable running ~ 150k slots
- Often exceed 20M full sim evts/day
- 115M simul and 250M pileup processed last week
- MC15 25ns campaign is progressing nicely
- Some more bulk samples to finish and some large requests still coming in
- Open Issues
- Moving to 1kevts simul - delayed waiting on new cache
- Tasks with low number of jobs (<10) going to finished - being discussed
- Implementing task goals - plan to run large-scale tests this week
- Campaign metadata - need AMI and Rucio to update campaign/bunchspacing - to be discussed
- Due to an issue between Rucio and FTS (solved end of June)
- Double FTS jobs causing entries in Rucio but not on disk
- About 2M double jobs, 15k files completely lost, ~30k recoverable
- Derivation Production
- New cache 20.1.5.7 - in production this week. Will reprocess fraction of data only, by request
- 25 ns cache - rebased nightlies to 20.1.6 to be in line with the reconstruction release expected to run at T0 on 25ns data
- New DEFT train interface for MC now available to users
- Implementation for open-ended MC production request underway - to be tested
- Reprocessing
- Final stages of planning - conditions essentially ready
- Reprocess all 2015 periods A,B,C (28 runs total)
- Config: 20.1.5.12
- Express, CosmicCalo streams launch today
- Use periods A,B for beam-spot. Has new LAR/ID alignment
- period C: used to validate remaining new conditions
- Bulk launch aimed for Aug 11 (waiting on muon alignment)
- Tier-0 Status
- Not much news this week
- Ongoing investigations on slow machines in the dedicated Tier-0 batch cluster:
- reconfiguration 32-core --> 16-core machines
- systematic testing through HammerCloud?
- 2 hour downtime tomorrow or Thursday - DB schema upgrade.
- Tier-0 control and monitoring processes have to be stopped
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-07-21
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20150728
Topic revision: r1 - 2015-07-28 - LeslieGroer