Tier1 and Tier-2 Weekly Report 2015-09-29

General News

  • ADC and ATLAS Computing News [20150929]
    • ADC Weekly meeting
    • Derivation Production
      • Switched open-ended data derivations to a new cache, 20.1.8.1, yesterday
        • Compatible with Tier-0 cache, where the Heavy Ion EDM issue was fixed.
        • Corrects trigger prescales in xAOD metadata
        • Will rerun all data runs with this cache. No need to do this for MC
      • Some manual handling of finished tasks in previous cache
    • Tier-0 report
      • Smooth data processing
        • Approaching "nominal" conditions: ~900 Hz physics_Main DAQ rate, ~40% LHC up-time
        • Problem with retrieval and definition of AMI config tags (fixed now)
      • Tier-0 EOS buffer (CERN-PROD_TZDISK) too small
        • 2 PB, filled to 90%, nothing to delete (David C, today)
        • expect ~100 TB physics_Main ESDs per day (lifetime 3 weeks)
      • Wrong pile-up info in conditions DB for runs a couple of runs
        • Bulk processing had started, AOD datasets were being filled and registered
        • Suppressed addition of AOD datasets to "derivations handshake" container
        • Reprocessing at Tier-0 has been launched
      • Work flow optimisation
        • Follow up after SW&C Week (ESD size and reading/buffering)
        • "Standardized" testing on small, representative cluster
      • Spill-over validation
        • Investigation of discrepancies in AOD contents between Tier-0 and Grid samples
    • ADC News/Report
      • Problematic FTS jobs at BNL caused server crashes - fixed Thursday
      • Both CERN and BNL FTS servers crashed due to inode exhaustion - fixed by weekend
      • Changed FTS selection strategy from "auto" to "orderly" (based on topology)
      • 1 kHz nominal trigger rate (HLT), ~40% LHC efficiency and increased luminosity – filling T0 disk quickly
      • 24hr turnaround on HLT reprocessing proving tough
        • Data transfer issues (partially FTS limited)
        • Now express transfer requests
        • Job memory growth a significant issue
        • Single core 4.9 GB and rises to max of 8 GB/core.
          • More effort needed her
      • Derivation jobs never account for more than 10k job slots, but can use 25k nominally
      • Two compromised UI nodes (not at CERN) - ADC investigating
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2015-09-29

Comments


This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20150929
Topic revision: r2 - 2015-09-29 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback