Tier1 and Tier-2 Weekly Report 2015-10-13
General News
- ADC and ATLAS Computing News [20151013]
- ADC Weekly meeting
- News from Computing Coordination
- LHC Schedule: 3.5 weeks of pp, setup for HI, starts mid-Nov for a month, then TS for Xmas. pp starts again mid-April
- Processing Schedule:
- Dec 1 - Release 20.7 frozen (except 2016 trigger)
- Dec 14 - Launch data reprocessing, final conditions
- Feb 1 - Launch MC15b, trigger final. Samples for CP groups
- Success Oriented Simulation
- Start simulation on non validated resources or with non validated workflows - HPCs, Event Service
- Agreed with Physics Coordination
- 500M low priority events will be identified by next week, simulate only for now and reconstruct only once validated for physics
- Technical Validation
- Discussed during ATLAS week last week
- Physics Validation is very stretched and very busy
- A special effort (Task Force) will be formed to help - should be a few weeks work. People being identified now.
- Derivation Production
- Scouts suppression in open-ended derivation production: now in place (only the first dataset is processed with scouts and skipped for the rest)
- Derivations on the debug stream: still being worked on, merge jobs are failing (something to do with zero events files?)
- Open-ended MC derivations: submitting derivation tasks automatically when the MC request is put in the system - details are being worked out, implementation will start soon, the goal is to start with signal sample
- Still see only 14k max job slots occupied. Quite a lot of ebb and flow
- MC Production
- About 100M events full sim approved
- Expect 300-400M evgen request soon
- Tier-0 report
- Processing backlog as a result of a few things:
- Big runs: e.g., 281143 (21h @ 1kHz, 70M events, 30k jobs)
- IBL deformations require extra alignment processing
- Delayed calibration loops
- After alignment, release of several runs at the same time
- Extra processing requests (PixelBeam,VdM)
- Low CPU efficiency of complicated Tier-0 recon jobs
- Mixture of MP and sequential parts, high I/O, ...
- Continued work on performance and efficiency optimisation
- Benchmarking tests on dedicated sub-cluster (representative h/w mix)
- Spill-over exercise
- Second round (reduced setup @ T0) produced compatible AODs
- Further validation: HIST (?), understanding discrepancies of first round
- Tackling now:
- Extended configuration on the Grid (including DRAW, DESD, DAOD)
- Usage of new common AMI tag forma
- DDM Release and Deployment Manager
- Goal: Increase the quality and efficiency of the DDM releases and the deployment procedure
- Assign one person responsible for planning and overseeing the release and deployment of Rucio
- Formalize release and deployment procedure (including packaging and validation)
- Two types of releases: feature (rucio 1.X.0) and patch (rucio.1.1.X)
- Feature releases only during technical stops
- One release every ~3 weeks
- Pre-Production deployment
- Every release is tested for (at least) one week on the Rucio pre-production cluster (currently 6 nodes)
- This cluster gets ~1% of the total production workload (servers & daemons)
- Production deployment
- Once the release passes the validation on the pre-production cluster it gets deployed on the entire production cluster
- Rucio release 1.1.2
- 18 JIRA tickets resolved
- Pre-production deployment tomorrow
- Production planned for 2015-10-21
- RAL Tape System
(see slides)
- Reports from Cloud squads on decommissioning PRODDISK at sites (ES, UK, IT, NL)
- Basically update queue config and monitor that no new files created for 2 weeks
- DDM Ops will take care of clean up. Most should be done by automatic cleanup after 2 weeks
- Site involvement at the end to understand dark data etc
- Detailed instructions discussed last week
- UK using JIRA tickets to monitor
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-10-13