Tier1 and Tier-2 Weekly Report 2015-10-20
General News
- ADC and ATLAS Computing News [20151020]
- ADC Weekly meeting
- Physics Validation
- Reasonably often jobs fail with "lost heartbeats" - losing fractions of datasets changes the mu distribution and hence sometimes impacts any histogram sensitive to pileup.
- Problems with cloning AMI tags - manual editing of new tags to fix changes not requested always required. If you miss fixing a change the production jobs often still run without problems! See ATLASAMITG-48 (may be fixed with new interface)
- Need documentation for prodsys2
- PRODDISK Decommissioning
- MC Production
- Have been quite full at ~130k slots for the last few days. Still have some simulation pending but only ~20M more to submit.
- A very large ~500M evgen request will start in the next days - score
- Very close to having ~250M FullSim request finalised. Expect ~1-2 weeks
- Have new automatic approval functionality implemented in ProdSys2
- Approve whole chain once the evgen is 50% done.
- Should reduce delays and workload for managers.
- Retry module memory change resulting in duplicated files
- Derivation Production
- Seeing duplicated events and discussed with Physics Coordination
- Analyzers should be checking event duplications (some discussion ensued)
- Re-run affected tasks and notify analyzers. Could for instance make a technical container for re-made datasets to easily notify the users
- Workflow is implemented for derivations on debug stream
- Submitting MC derivations as a child step to MC production: tested and ready to be opened to users, instructions will be provided tomorrow
- Running longer derivation jobs: nGBPerJob=10 is now default for all derivation tasks set by production managers, nMaxFilesPerJob=100 is internally set as default in DEFT
- Tier-0 report
- Processing backlog (about to be) cleared
- High-intensity bulk reconstruction done
- High-rate calibration_PixelBeam stream recorded during ALFA run last week - about 80k jobs
- Additional Tier-0 batch resources, negotiated with IT, about 10%, to be used for lower-priority (calibration) processing
- Continuing work on performance and efficiency on sub-cluster
- Promising new hypervisor configuration ("kilo 1") giving 20% better cpu efficiency. To be tested at Wigner
- Stop of physics_MainESD production from now on
- Besides saving disk space, will save I/O & serial CPU at the end of a job (modest speed-up of reco time, O(10%)?)
- Spill-over development/testing in progress with a test run
- Pilot Update (v63.3)
- Urgent patch release, to be released asap
- Number of fixes/changes to deal with spill-over jobs correctly (max size, filename convention, number of events reported when several output files created)
- Correction for HC test jobs that were affected by spill-over changes
- Already being tested at IN2P3
- Still to add:
- Allow zero output files for new job parameter option
- Remove subtraction of 2GB from maxwdir (requested in April)
- Remove test import of lfc module
- Set pilot exit code zero instead of general error when no jobs available
- ADCoS report
- Seeing degradation of AGIS API frequently
- DDM Dashboard sometimes does not provide data - needs more stability
- Are e-logs being followed up on
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--