Tier1 and Tier-2 Weekly Report 2015-11-10
General News
- ADC and ATLAS Computing News [20151110]
- ADC Weekly meeting
- MC Production
- MC15b digi+reco started last weekend
- Submitted 120M / 40M done already
- Expect additional 500M
- Expect to process about 25M a day; should have less evgen and simulation and more digit+reco in the system soon ~ 2 weeks
- Duplication issue
- Delay a week before doing bulk obsoletion of MC samples for checking. Need to be careful as there are duplications in both evgen and simul level
- 500M events HPC simulation
- Waiting on some decisions to define tasks (100M diphoton, 400M V+jets) and which sites to send to
- Number of events per job? Special project mode settings?
- Variable number of event per job could be an issue if required
- WORLD cloud
- Rod has requested a complete request with all steps to be pre-assigned to the WORLD cloud as this has not been tested yet. Identify suitable request today or tomorrow
- Derivation Production
- No report - things seem to be stable
- Tier-0 report
- Smooth processing of last pp runs
- pp data taking stopped on November 4 (morning) - in machine studies now
- Tier-0 processing finished yesterday morning, as foreseen
- Reprocessing and testing activities
- CAF: processing of a couple of older runs for L1Calo group
- Test processing of calibration_DataScouting_05_Jets stream
- Preparations for HI: reprocessing of few selected data11_hi RAW datasets with 20.1.8.5
- Spill-over exercise:
- Successfully running since one week in parallel with T0 ~ 25 k slots
- Sent to T1s at begining of week
- Processed all available DQM HIST at Tier-0 (5 runs so far, 400M events?)
- Issues encountered
- Merging of data failing when jobs with no output files
- Solved by modifying pmerge and pilots
- Spill-over started slowly (~ 1k slots)
- Boosted setting job type from reprocessing to urgent
- Memory requirement is large and typically runs on the high memory queues
- Induced quite a high level of transfer (a lot of files)
- Non merged datasets were registered to AMI
- Some discussion about merging in general (on node)
- For future:
- Spill-over needs to be properly labelled for monitoring
- AMI registration of produced datasets to be checked
- Discuss how to handle priorities
- CRC/ADCoS report
- Up to 250k job slots in use at end of week (mostly opportunistic resources - CERN trigger farm, NERSC, ORNL)
- ~ 1PB/day being moved, 50k-75k files
- PRODDISK removal done except for few US sites
- TAIWAN tape fully decommissioned - 250k files lost
- Different pilots users (DN) to allow dynamic sharing of mcore/score - needed for INFN-T1 using LFS
- FTS bring-online issue at BNL affecting staging - fixed by developers
- Tapes are getting heavy usage and disk buffers filling up
- Reduced weight in PanDA for brokering jobs to sites with tape replica
- Improved monitoring for different stages of data subscription has helped to find this
- Only about 1/2 senior shifts are covered in next few weeks
- Characterizing Analysis Activity on the Grid
- Use Kibana data to look at things like is derivation production succesful, are people doing private filtering on AODs, how much processing do analysis people need, etc, etc
- Advantages of Kibana (MWT2, Ilija)
- Jobs/tasks info from panda DB (available with 3-day delay)
- Allows for more complex query/more information/faster than ATLAS dashboard
- Manipulation of variables is limited - more complex analysis would require scripting in Pig
- Some discussion about how memory is measured and reported and if correct in all cases
- Few slides on error codes and distribution
- Some metrics from last 30 days:
- Efficiency: 80%
- 9.7M jobs, 745 users, average (max) walltime = 1 (160) hour, Average queue time 1.8 hrs, avg input: 5 files, 4.6GB, avg output: 1.7 files, 750MB
- Failures from transformation (75%) and pilot (25%)
- Pilot failures mostly by too long jobs/too high memory requirements
- Many (more than 200!) users still running on AODs
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2015-11-10