General News
- ADC and ATLAS Computing News [20160105]
- Compute Canada Usage Stats - 2015 (preliminary and unverified)
-
-
- ADC Weekly meeting
- MC Production
- Grid kept reasonably busy over Xmas break
- ~600M events still in queue
- CERN P1 power work removed ~40k job slots for next couple weeks
- Some tasks still stuck in 'submitting' or 'register'
- WORLD cloud tasks seen to run slower
- Don't expect bulk requests from PMG with MC15b (for Moriond) but will have requests from CP/Physics WGs
- Start MC15c from the 1st Feb. This is rerun of pile/recon with rel 20.7 by using the existing HITS files. The target conference is ICHEP
- Derivation Production
- Reprocessing cache, AtlasDerivation -20.7.3.5, was tested fine on the express stream before the break
- Wait for green light from DataPrep to start derivation production
- Collecting group requests as to which derivations will run on the reprocessed samples: HIGG1, HIGG2, HIGG4, HIGG5, HIGG6, SUSY, EGAM, TOP, JETM
- Further discussion with the groups in tomorrow's train coordination meeting
- Bulk reprocessing
- Lots of work last minute to get validation to start reprocessing before break but made it
- First bulk reprocessing tasks sent at 18:00 on December 16th
- Further tasks and streams launched in stages over the Christmas break
- Reco of 104/106 runs for physics_Main is now completed
- Second express stream: 5/112 reco jobs still running, 2 to resubmit (trigger)
- PixelBeam /VdM streams: some issues with missing beamspot info. New jobs being submitted now
- Still to come: ZeroBias, physics_MinBias (6 runs comprising period B), and some DESD production, debug_Late stream
- Issues with error reporting make it hard to debug. Also frequently missing log files.
- Actually very few software related crashes
- Some issues with T1 weights and brokering for merges
- Various sites issues that were observed over the break were also discussed
- CRC/ADCoS report
- 3/4 of shifts covered during the break
- Bunch of minor service or site issues reported from last 2 weeks
- Open issues
- CERN-PROD source transfer failures:No such file or directory - few lost files (~50)
- Few other T1 site issues with transfer failures
- Network overload for US North Eastern T2
- see slides for details
- Uploaded 350TB RAW data15_13TeV on Dec 15
- Large MCORE reprocessing started filling all ~5000 slots
- Saturated 10G WAN with access from around the world from Dec 18-28
- Caused large backlog in output transfers plus job timeout failures as could not compete
- 100G being commissioned now for NET2
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-01-05
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20160105