Tier1 and Tier-2 Weekly Report 2016-02-09

General News

  • ADC and ATLAS Computing News [20160209]
    • ADC Weekly meeting
    • MC Production
      • Grid not very full at the moment - mostly sim and digi+reco
        • MC15c should start next week
      • Raised question about lifetime of logs again (default 1 year at moment)
        • Would like to tie to lifetime of data (but more complicated lifetime model than we have now)
        • Maybe just raise he lifetime for all logs? Will be discussed in Physics Coord and brought back to CREM.
      • Evgen tasks taking too much CPU time - collect this information in the spreadsheet?
        • Propose to add CPU time/event in spreadsheet
        • Can use evgenConfig.minevents in jobOptions to calculate total CPU time
    • Derivations
      • Reprocessing start tomorrow; run the Muon train in open-ended mode, other groups are still validating and updating their derivations
      • Data processing on full 2015 data with AtlasDerivation-20.1.9.6 launched yesterday for the 3rd train:
        • EXOT3, EXOT4, EXOT8, EXOT11, EXOT12, EXOT13, SUSY10
      • Some decisions on policy for deletion of n-2 versions of good data at CREM and PC - still delete all data, including from LOCALGROUPDISK
        • Have to ensure these policies and upcoming deletions make it to the right people through the communication channels
        • Was discussion about unpopularity of this decision (also workarounds by pinning datasets)
        • Pushing an interactive web page to display this information
        • Could also develep a tool for generating a popularity report on who accesses the datasets to be deleted during the grace period
    • Reprocessing
      • https://twiki.cern.ch/twiki/bin/view/Atlas/December2015Run2Reprocessing
      • Latest target date for re-starting reprocessing: after tomorrow's 4pm DQ meeting
        • 10 high priority runs redone again for express and CosmicCalo streams
        • All known problems before this meeting now understood and fixed
        • Aim for 2 weeks, tails to be done by 3 weeks (end of February)
        • Christmas reprocessing now all obsoleted except the original 10 high priority runs: this can be obsoleted after the new production done
      • 2012 JetTauEtmiss stream reprocessing in 20.1.9.3
        • Progressed very well, only 11/286 runs still active
        • About 1/6 of the runs have crashes, "ToolSvc.InDetSCTRodDecoder: SCT Missing Link Headers" ticket: ATLASRECTS-2560, in most cases is sub percent level
    • Switcher2 Change
      • Currently switcher2 sets queues to test after a downtime
      • Been complaints that HammerCloud takes too long to reset a queue online
        • Can be avoided by switcher2 just setting queues online after a downtime
        • HC should be able to quickly blacklist queues if they are bad
        • An increase in resource utilisation will come at the cost of a small increase in job failures
        • This change will be implemented tomorrow morning
    • Analysis of Analysis - see slides
      • Follow up to Nov discussion (looking at Kibana job data)
      • Look at user analysis jobs over last 3 months
      • Top 50 users of ~1000 account for ~60% of walltime usage
      • pathena, prun job efficiencies typically ~50%
      • Increasing usage of DAODs
        • But ~80% usage in last month not in DAOD analysis (mostly reco, NTUP_COMMON, private analysis etc)
      • A tentative statement: 100 walltime hours/day/user needed to satisfy 95% of users
    • New Pilot - v64.0
      • Main changes were presented in December but reluctant to install just before break
      • New setup function for prod jobs (also for analy jobs in the next release)
        • Using atlasLocalSetup (from Asoka)
      • General code cleanup
      • ARGO (HPC) updates
        • New ARGO pilot modules, serialization of ARGO messages
      • New site movers for testing
        • xrdcp, lcgcp, dcache, rucio
      • EventStager for NERSC, multi-jobs,+ much more
      • Memory monitoring updates
        • removed: Error code 1235, "Payload exceeded maximum allowed memory"
        • Current version does not kill when max memory has been exceeded, only monitors it every minute
      • Alternative stage-out updates (both for "normal" SE:s and OS:s)
        • Pilot now reports alt stage-outs to "normal" SE:s with jobMetrics
        • Alt OS stage-outs reported with event range updates (i.e. for ES) and logs are reported with jobMetrics
        • WORLD cloud update
      • Added time-outs to log file creation + removal of *.a files
      • MAKEFLAGS update
        • Now also set for generic jobs (i.e. jobs with no ATLAS release specified)
        • Added for ND jobs (previously set by script on the ND WN)
      • New job recovery for testing
        • Not activated in current version - testing/development not ready
    • CRC/ADCoS report
      • Few issues
        • Network glitches between BNL and PIC on 8 February
        • Disk space running out at DESY-ZN LOCALGROUPDISK - lots of transfer failures
        • RAL lost a disk server and this was enough to send the whole site offline with HC
          • Maybe HC tests should act on a few files from a dataset but not necessarily on specific ones?
        • Problem with CREAM-CE and Condor at some sites (not all), mostly in the DE cloud (but not only) since 1st February.
          • Condor dev promised bug fix but not seen yet. ARC-CE unaffected.
        • MCORE resources appear saturated but single-core are not, and have very fluctuating load
          • Automatic scheduling not effective at many sites and not enough MCORE resources globally
        • Otherwise business (mostly) as usual
      • Very few ADCoS senior shifters this week
      • Ongoing discussions:
        • Where should pre-staged datasets go (scratchdisk vs datadisk)?
          • Scratchdisk was filled at many sites last few days by data for the data12 reprocessing
        • HI processing jobs still need lots of memory. Not clear how to run them
        • Staging from tape when tape is slow or stuck: how to get data that are available elsewhere instead?
  • CA Cloud Squad Actions
  • Open Issues and Ongoing Discussions
  • WLCG and General Computing News
    • Security News
    • gLite/EMI News
  • ROC_Canada News

ABCD Determination and Monitoring

SSB Results

SAM Results (based on VO tests)

APEL Accounting

APEL Synchronization Test Links

Production and Usage Status

-- Leslie Groer - 2016-02-09

Comments


This topic: AtlasCanada > WebHome > GridActivities > ATLASCanadaTier-2Operations > T2WeeklyReport20160209
Topic revision: r2 - 2016-02-09 - LeslieGroer
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2026 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback