Would like a page to see "done/finished/aborted" tasks
Lots of discussion about ensuring tasks finish, monitoring tools for datasets, coordination with Physics Coordination (would like 500M full-sim events always as a "buffer")
Derivations
Reprocessing samples
Muon train ran in the open-ended mode with AtlasDerivation-20.7.3.2.
For other groups AtlasDerivation-20.7.3.5 has been built, will be validated this week. AODFix for b-tagging is disabled, so b-tagging info will be sub-optimal, not for public results.9 trains requested to run.
MC15c derivation production
Rebasing to 20.7.5 is needed and includes a new root version. Rebasing started yesterday and can take about a week.
Since the AtlasDerivation cache is not ready for the pre-MC15c samples submitted this week the derivations won't be submitted together with MC15c, but in the child to parent mode when cache is ready.
AODFix for taus is also needed. Another cache with everything included will be in ~2 weeks.
Mar 4 - Triumf Frontier launchpads negatively affected by BNL worker nodes. BNL fixed ACL configuration on their side
Monday - By default moving all sites to world (wait one week to drop mcp)
Taiwan requests to suspend its CVMFS stratum 1 until its problems are solved
Event Service - discussed the size of the EVNT files
Slow event gen jobs produce small ~1.5 MB files and faster jobs produce 100 MB files
Question is if copy to scratch is better than direct IO for these files. Suggested to test with direct IO for files a still waiting on Amazon 100K test
ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
See example steps circulated by D. Qing (20100406)