Tier1 and Tier-2 Weekly Report 2016-03-21
General News
- ADC and ATLAS Computing News [20160321]
- ADC Weekly meeting
- MC Production
- Grid pretty full - mostly digi+reco + sim (holding off evgen for the moment)
- MC15c (digi+reco reprocessing)
- Priority given to CP groups and then physics groups
- Three variations of pileup:
- "MC15c pileup" r7725 (a818)
- "MC15b pileup" r7726 (a819)
- no pileup r7728 (a820)
- MC15c campaign started March 11
- Issues for "MC15b pileup" case caused jobs to run too slow
- Aborted all "MC15b pileup" tasks about mid-campaign
- Build new AtlasProd1 cache over last weekend 20.7.5.1.1
- Reprocessing status:
- Most CP groups submissions started, and a few physics groups started
- Some "MC15b pileup" resubmitted
- digi+reco tasks doing well - up to 70M-100M/day
- Derivations
- Currently running validation tasks with 20.7.5.1 on m15c
- Z->ee (mostly done) and Z->mu mu (running)
- 93 derivations in 20 trains
- Plan to build 20.7.5.2 next week - will be used to process mc15c MC samples
- Validation of data processing cache (20.7.3.5)
- Overall looks gooc, but needs precise validation
- 62 derivations are scheduled to be part of reprocessing
- no time-line yet
- L1Calo
- Submitted ZeroBias and L1Calo last week
- 106 runs, submitted test task for CALJET, EGAMMA, PHOJET, SGLEL
- Will submit rest once test tasks are confirmed
- Reprocessing
- Status of the 2015 13 TeV bulk reprocessing
- 2015 5 TeV (6 runs)
- All pp mode done in 20.7.3.9: physics_Main, physics_MinBias, express, CosmicCalo (DESDM/DAOD merges also to be done)
- doHIP mode in 20.7.5.2: CosmicCalo and physics_MinBias still running, last few jobs trapped in transfer in INFN-T1
- Run 286282 now also submitted for all 4 streams in doHIP mode ("period VdM")
- 2015 Heavy Ion (34 runs)
- Reco done for all runs, AODs replicated to CERN-PROD_DATADISK for beamspot
- 2 HIST merges trapped at INFN-T1, running-ish
- All 4 streams done for run 287321
- New submission of all 4 streams with run 287380, with ramcount=3000;baseramcount=0;
- Hammercloud AFT Updates
- current AFTs are based on fairly old versions (rel 17)
- Been testing new tests in AtlasDerivation 20.1.5.7
- 729: reco_tf to run official derivation
- 775: Athena-based: AthAnalysis 2.3.48 - NEW, under development
- 722: Root-based: RootAnalysis 2.3.14
- Same input dataset pattern for all templates:
- mc15_13TeV:mc15_13TeV.*.merge.AOD.*_r6630_r6264*,
- mc15_13TeV:mc15_13TeV.*.merge.AOD.*_r6633_r6264*
- Already available at all sites (in hc_test.aft container)
- Template 729 has been running since March 14: e.g. http://hammercloud.cern.ch/hc/app/atlas/test/20079875/
- Missing tests for ANALY_IAAS_TEST
- ANALY_SFU (eff about 85% but too few jobs for black/white list determination)
- Plan: switch off template 508 (Athena 17.2.7.6 Reco NTUP_SMWZ) and replace it with 729 tomorrow
- After Easter, also update the other 2 AFTs (will be announced in ADC weekly)
- CRC/ADCoS report
- Some dicussion about complaints in Phys Coord that users can't get their outputs
- Could make double copies (i.e. ask rucio to make a copy in scratch somewhere else). Some concern about number of files being transferred
- Phys Coord question about MC15c competing with other high priority tasks (e.g. HI estimated to need 2 months for reprocessing). Maybe limit the number of cores used (20k?) - may not be very effective. Have sharing as well but again may not work as expected.
- LHC : Powering test
- Running slots : Grid running above 200k the last week.
- MC15c running at good speed, about 70-100 Mevts per day (pile)
- New configuration (replacing the problematic one is under test)
- HLT processing issues :
- Incident with job failing 100% in some sites.
- processingtype "urgent" moved to recon instead
- Staging / Transfer / Deletion :
- INFN T1 : failed transfers and low efficiency for the last 48h
- FZK-LCG2 DATADISK: transferring errors to this site
- Express transfers got stuck
- FTS shares misbehaving (transient failures).
- HI reprocessing : expected to start a few weeks.
- The grand total is about 400M events
- Initial checks on express stream are progressing nicely. The rate of failures is quite low
- Hard probes test (to be done in total 250M): only 2 failed jobs out of 1k
- Test shows that for 8-cores the memory usage is about 27-28 GB maxPSS
- Check started to see performance with 3GB per core
- Services :
- pilot services went to alarm a few times
- Few issues with Frontier squids
- Storage:
- Few T1s are getting full SARA-MATRIX, IN2P3-CC, BNL-OSG2
- Deletion is needed
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-03-21
Comments
This topic: AtlasCanada