Tier1 and Tier-2 Weekly Report 2016-05-03
General News
- ADC and ATLAS Computing News [20160503]
- ADC Weekly meeting
- No ADC Technical Coordination Meeting this week
- MC Production
- Mostly sim and digi+reco this week
- MC15c reprocessing about 85% done after 7 weeks (1-2%/day) (3.9B/4.5B done)
- Failure rate 0.1-0.5% (35M events so far)
- Pushing to make sure tasks don't land up with very long tails
- Some investigation of using Event Index to identify duplicate events
- Fairly manual intensive at the moment - hope to automate after characterizing
- Derivations
- Open-ended production on data16 with 20.7.5.4 continuing (8 runs so far)
- mc15c - ramped up priority of CP samples
- Jobs are about 3h length (0.8 input events/second) - would like to tune a bit
- 95% of jobs use 1.4 sec/event or less which implies 20k events for 8h job
- Currently running with nGB per job = 10 (consistent with 20k if AOD size ~0.5Mb)
- Still see outliers that would violate this though
- HI Reprocessing
- CRC/ADCoS report
- 200k slots used consistently last week
- ATLAS-RAL-Frontier and ATLAS-T0-Frontier degraded
- T1 DATADISKs filling up - BNL, SARA, INFN, FZK - being rebalanced
- Transfer timeouts to BU - removed from list of nuclei
- Some transfer issues between BNL and SARA and CERN - solved
- Commissioning new HC Blacklisting
- Rely on AGIS for information on topology and Panda resource status
- Site definitions in
- Start using for blacklisting
- Check AGIS fields and blacklisting rules:
- Slides describe the relevant AGIS parameters and HC tests and blacklisting criteria
- Need to check hc_param, capability, type and is_default for sites
- Need one "is_default" for production and one for analysis
- Been tested with CERN, ND and DE clouds. Volunteered/told that can start with CA cloud
- Updates for AFT/PFT templates presented next week
- ADCoS Status
(plea for shifters)
- Have not fully recovered from the drop of shifters during LS1
- Three shift levels: Expert, Senior, Trainee
- Daily shift period (CERN time): AP(0-8), EU(8-16), US(16-24)
- Daily shift slots - Expert:1, Senior:3, Trainee:3
- Shift duration: 9 hours for Expert, 8 hours for Senior/Trainee
- Can be done remotely
- Counted as Class 2 service in OTP
- Over last few months, had about 1/2 coverage for Expert shifters - only 6 expert shifters
- about 3/4 coverage for Senior shifts
- 18 Trainees, 6 finishing their training
- DAST Status Review
- 8 shifters - 4 NA (incl. Yun-Ha) / 4 EU
- Need management to prosletize for more volunteers
- Computing Run Coordinator Shift Status
- Onsite. 2/3 to 3/4 coverage. 14 actve shifters (4 most active do > 1/2 shifts)
- ADC experts or experienced Cloud Support members
- Worked on Live Page - global monitoring, updated daily
- Improve tracking of long-standing issues
- Got rid of white board, twiki seems better
- Still some uncovered shifts
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-05-03
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20160503
Topic revision: r1 - 2016-05-03 - LeslieGroer