Tier1 and Tier-2 Weekly Report 2016-05-24
General News
- ADC and ATLAS Computing News [20160524]
- ADC Technical Coordination Meeting
[20160523]
- ADC Weekly Meeting
[20160524]
- MC Production
- 5.1/5.2B events done. Last 70M might have long tails.
- Submitted missing tasks ~370M 270M to go for MC15c
- MC16_13TeV
- Started new project
- Some discussion about necessary tags etc in AMI
- Want to change number of events per job in sim step: 1k->500 as average length about 400 sec/event (7 hours for 500 events)
- Derivations
- Reprocessing
- Daily summary Email to Cloud Support
- Mostly updates to DDM Blacklisting
- Queue status report not working but get mail from switcher
- Discussion again about utility of group spacetoken reports as not much Cloud support can do about these
- Might be surveying clouds to find out what else could be useful etc
- CRC/ADCoS report
- Fairly quiet
- Discussion on allowing production jobs to read inputs directly from the SE instead of copying to local disk
- Some concern about scaling at some sites (e.g. number of open connections)
- Discussion on throttling data tranfers to tape endpoints to match their write capabilities. Need changes in FTS for tape vs disk endpoint.
- Migration to CERN CentOS7 (CC7)
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-05-24
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20160524
Topic revision: r1 - 2016-05-24 - LeslieGroer