Tier1 and Tier-2 Weekly Report 2016-06-14
General News
- ADC and ATLAS Computing News [20160614]
- ADC Weekly Meeting
[20160614]
- MC Production
- Verbal report - tasks submitted to fill about 300k slots (~25M events, mostly EVGEN?)
- Discussion about keeping track of future submissions to make sure don't run dry
- Group Production
- Open-ended derivation production on data16 continues on 20.7.6.4
- Full reprocessing of data15 with same cache mostly done with some tails
- MC15c production with 20.7.6.4 for groups
- Few requests submitted over the last few days
- About 3k tasks finished already
- Bulk should be complete by end of week
- Need to decide of previous 20.7.5 production should be deleted in Rucio or obsoleted in production system
- Memory Consumption
- Have had high memory consumption in some of the derivation trains causing issues
- Could be memory leaks but more likely fragmentation, so no easy fix
- Short term solution is to split the long trains into two (longest are 10 carriages)
- Does mean shorter (1-2 hours) jobs on sites, when we were trying to lengthen these
- Reprocessing
- CRC/ADCoS report
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-06-14
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20160614
Topic revision: r2 - 2016-06-14 - LeslieGroer