Tier1 and Tier-2 Weekly Report 2016-08-02
General News
- ADC Technical Coordination Meeting
[20160801]
-
- Round-table discussion - no slides or notes
- ADC Weekly Meeting
[20160802]
- MC Production
- Some emptying of the grid Friday, bolstered by some small samples
- Expecting validation of the 800M Sherpa request this week?
- Also 300M 8 TeV W mass measurement sample
- Still no good predictor / measurement page for when grid will be emptying
- Requested obsoletion and deletion of data over a week ago, but not carried through the system yet
- Group Production
- New cache last week (20.7.7.2) for PRW AOD
- 20.7.7.3 to be built this week
- Tier0 has switched to 20.7.7 so production switch to 20.7.7.2 imminent
- Data processing up to date. Debug done with 20.7.6.6
- Deletion of O(3PB) implemented > 2 weeks ago
- Plan to delete all 20.7.5.3 derivations (p2613 and p2616) next week (another 3PB)
- Many lost files in last month but minimal impact on derivations. Can be rerun if necessary
- Reprocessing
- DATREP-59
- DESDs are produced by MCP and stored at their group.
- The ESDs (231.5TB) can be deleted
- DATREP-60
- VdM reprocessing requires huge memory, 64GB at SARA and some fraction 72GB at SiGNET
- Most of 5k jobs done
- DATREP-61
- Lost files: Probably none need replacing, final confirmation to come today
- Rel 21 validation
- One last transform bug to iron out in 20.7.7.3.1
- CRC/ADCoS report
- Heavy-ion task using high memory >64G. HI group reviewing situation
- Some issues with Kibana not reporting stats - being used by shifters
- Overlay tasks generating excessive load on Frontier
- Workaround to only run at BNL although Frontier meeting earlier discussed details
- Oracle patch to fix issue with many stuck DB connections
- Trigger reprocessing delay due to SARA TAPE downtime. DATADISK was auto-blacklisted, script now fixed. Some minor Prodsys UI issues followed-up on JIRA.
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2016-08-02
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20160802
Topic revision: r1 - 2016-08-02 - LeslieGroer