Tier1 and Tier-2 Weekly Report 2017-05-30
General News
- ADC Tech Coord Meeting - CANCELLED
- ADC Weekly Meeting
[20170530]
- MC Production
- Steadily running ~250k slots. MC 80% global share
- Essentially all MC16c, small amount of MC15c evgen (500M waiting, 200M to be submitted)
- Well balanced between evgen and simul (~1:3)
- MC16c evgen is in project mc15_13TeV but has campaign m16:mc16c
- Group Derivation Production
- Issue with bigpanda showing new prod step derivation
- 21.0.19.3 built last week
- Launched full processing of data15 and 16 on STDM2
- Some MC16 production for TOPQ1
- Otherwise only minor validation production
- Issue with muon trigger matching found (being investigated...)
- Short term plans
- Would like to build 21.0.19.4 tomorrow
- Will most probably be the cache for first collision data
- Then plan is then to move to git for AtlasDerivation
- Containers to be used:
- data17_13TeV.physics_Main.OpenEnded.AOD.t0prod21_v01
- data17_13TeV.physics_ZeroBias.OpenEnded.AOD.t0prod21_v01
- Updated the train config based on size estimates from the validation runs - 99 formats in 15 trains
- Pilot Update v69.0
- Memory monitoring fix
- Zip maps - create archive of output files
- Unzip still to be implemented
- Support for simplified payload setup (jobpars)
- Initial support for containers
- Pilot can execute payload and stage-in/out with Singularity if activated via schedconfig.catchall by specifying singularity options
- Pilot uses cmtconfig/platform info to determine image file name (located in cvmfs)
- Stage-in/out currently only with rucio and gfal_copy so far
- To be discussed further in Valencia
- Bug fixes for testing new versions of asetup and xrootd
- Event Service - support for prefetcher, allow for remote input files if local SE down
- Release asap after final tests
- CRC/ADCoS Report
- ATLAS data taking started - accumulate 70 pb^-1 since last Friday
- Still few transfer spikes from data consolidation
- Remove panda logger from monitoring (to be decommissioned)
- Some tape buffers filling up at Tier-1's already
- Reevaluate buffering rules for T1 tape for reprocessing
- Implementing WLCG diskless sites for production
- Based on "ATLAS recommends sites with small storage (< 400 TB) to focus hardware investment in CPUs instead of storage" ==> diskless sites
- Still could have LOCALGROUPDISK
- Use remote SE's for input/output
- Similar approach to cloud sites
- Another approach would be ARC-CE caching mechanism
- Looking into technical feasability with couple of Romanian sites
- These sites would focus on evgen and simul production. No analysis
- See slides for details
- Very small sites (<100TB): Probably affects 8 ATLAS T2 sites, but only 0.5% of available storage
- Small sites (100-400TB): 10 sites, 3% of ATLAS storage
- Will also look into T3 sites, especially not linked to T1/T2
- To be reviewed at ICB
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2017-05-30
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20170530
Topic revision: r1 - 2017-05-30 - LeslieGroer