Tier1 and Tier-2 Weekly Report 2017-08-15
General News
- No ADC Technical Coordination Meeting this week
- ADC Weekly Meeting
[20170815]
- MC Production
- Baseline 200k slots for MC production rising to 350k with NERSC (HPC)
- Last week simul dominated, now most jobs running on standard grid are pile
- The waiting simulation looks like not jobs waiting at NERSC (136 cores), but it is lots of mc16_valid..
- MC15 dominated by Evgen, which is currently dominated by large BPHYS request, approx 180/650M events now processed, slowly adding in slices of 20M each in order not to saturate grid
- MC15 Evgen scrutiny sample requests essentially done
- MC16 mainly running pile, made up of a mixture of mc16a physics samples and mc16c CP samples
- Some mc16_13TeV simul is queuing, in the process of adding more in now
- Two batches of simul submission at NERSC
- Group Derivation Production
- Reprocessing
- Still waiting on fix for 2017 physics background data for missing trigger info
- Still testing HI reprocessing
- Mostly done 2016 data reprocessing test with R20.7 and new ID alignment
- Mostly done 2016 data reprocessing test with R21 and track error scaling override
- Running 2 data runs with low-pt di-tau reconstruction
- CRC/ADCoS Report
- Overlay production limited to 800 running jobs
- Problem with derivations using f848 - request closed, all tasks paused while investigate
- phys-higgs files cannot be deleted because the filename exceeds 231 symbols at SWT2
- panda/JEDI fixed - files like this will not be created in the future
- deletion will be probably done locally+files cleaned from rucio
- Stageout failures at BNL due to network misconfiguration
- Absorbing backlog of log files from Titan
- Some lost heartbeats to RAL being investigated
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2017-08-15
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20170815
Topic revision: r1 - 2017-08-15 - LeslieGroer