Tier1 and Tier-2 Weekly Report 2017-10-31
General News
- ADC Technical Coordination Meeting
[20171030]
- Compiling ATLAS code for other platforms (e.g. powerPC) e.g. Summit and Titan
- ADC Weekly Meeting
[20171031]
- MC Production
- MCProd ~70% of global share. 150k-220k slots during week
- About 800M events pending or queued, 130M waiting approval
- mc15_13TeV - mostly evgen (60k slots)
- mc16_13TeV - sim and pileup (240k slots)
- Bunch of mini campaigns on HPC sites - 50 running requests
- Often simulation delayed due to evgen not produced
- 8M events produced last week
- Group Derivation Production
- AthDerivation 21.2.5.0 validation status
- Fixed issues with 5 trains in MC - build new cache soon
- Will need to remake validation samples (1 MC, 2 data runs) * Open-ended derivation going on with 21.0.19.6/8 mostly * Using up to 80k slots (avg 50k)
- Reprocessing
- Rel 21 2015-16 HI - tested but holding for missing monitoring component
- Missing Exotics running
- Preparing for fast processing of data17
- Goal is to reprocess first part of data-taking before winter break
- Created slice test for 25ns and 8be4 (mu~60), with single and two input files
- PSS per core same for 1 or 2 files per job
- 25ns ~ 2090MB, 8be4 ~ 2230MB (~150MB more)
- CPU Time per event - same for 1 or 2 files per job
- 25ns ~16 sec, 8be4 ~30 sec (reflects higher mu)
- Slice test used 25k - probably overkill for tuning config
- Still need to validate the 2 files/job workflow
- Make and test merge tags
- CRC/ADCoS Report
- Steady data taking 45/fb delivered
- EOS buffer mostly full with primary data (4PB)
- Tier-0 full of jobs - no spillover forseen in the short term
- Moving 2-3M files/day (>1PB/day)
- Backlog of EOS to Castor transfers (was up to 5 days, now 2)
- Linked to high activity on CERN FTS instance
- Problem due to wrong protocol conguration on some CERN GROUPDISK endpoint - Sanitization campaign is being run in AGIS to fix protocol inconsistencies between sites
- TRIUMF-LCG2: old ticket GGUS:131004 (3 weeks) about failing transfer with timeout errors. Problem finnally understood "tape writing pools were getting full"
- No CRC shifters for next 5 weeks
- Longish talk and discussion to improve ADCoS monitoring
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2017-10-31
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20171031
Topic revision: r1 - 2017-10-31 - LeslieGroer