Tier1 and Tier-2 Weekly Report 2018-01-09
General News
- NO ADC Technical Coordination Meeting
- ADC Weekly Meeting
[20180109]
- Meltdown and Spectre
- Group Derivation Production
- Re-derivation campaign almost finished (only ~48 active tasks)
- The whole campaign took about 6 weeks with an average of 95,000 slots
- About 80 formats were produced
- Main issues:
- input file stage-in problems at certain sites/clouds (bulk of problems)
- solution: re-assign to a different site/cloud
- using > 200 input files per job
- solution: setting MF=200 (ATEAM-448)
- excessive memory consumption / input files too big
- solution: run on fewer input files per job
- merging empty files with MCORE
- solution: switch to SCORE
- rare software glitches, principally affecting BPHY7 and 8
- solution: to be investigated
- Some stats:
- Average Max_PSS_per_core: 1.15GB
- Reco average wall time per event 0.7s, DAODMerge 1.5s
- Max PSS for reco jobs peak 8-9GB, merge < 2GB
- About 15-20% failures (21.2.8.0, 21.2.10.0, 21.2.9.0)
- Jobs that complete in < 5mins usually are failures. Most jobs finish within a day (actually peak at 20 mins, but long tail)
- MC Production
- Steady use of 250k cores through break. Mostly MC since first few days of Jan
- Main goal was to get MC16d reco underway, had MC16e evgen and some sim in reserve
- Lots approved just before Xmas, now in queue
- For last week: 150k pile + 70k sim (1B MC16d_CP almost done, 15/82M MC16d_PA)
- Completed many tails of older samples
- Some issues to resolve with merge vs non-merged HITS inputs and container definitions (need all tids in the same container)
-
- Reprocessing
- CRC/ADCoS Report
- Couple of bugs found (Frontier access fails and is successfully retried but the TRF fails the job anyway)
- Lots of transferring files in last week (100k+) due to short evgen jobs with small outputs causing CERN FTS load
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2018-01-09