Tier1 and Tier-2 Weekly Report 2018-02-06
General News
- ADC Technical Coordination Meeting
[20180205]
- Various presentations about XCache (development and testing)
- ADC Weekly Meeting
[20180206]
- Group Derivation Production
- November 2017 Rederivation Campaign - chasing the tails of the remaining tasks
- sharedWriter failure rate @ 1-3% due to the metadata being too large for the buffer
- Latest cache, AthDerivation,21.2.14.0, can't be used due to some issue with metadata
- Possibility of merging large formats is being discussed
- formats proposed for merging: STDM4, TOPQ1, TOPQ3 EXOT4, (JETM2), HIGG5D2
- Discussion about reducing the maximum number of retries of a task (currently 15)
- MC Production
- Solid 100-150k slots for MC16d reco continued last week, continued to process 100M events a day - getting to tails
- 3.1PB done, about 365M events waiting - done by end of week
- Some of the INFN MCTAPE tasks restarted
- Shifters working through request backlog - new requests coming
- Picking up some missing MC16d
- Last of 150M events of MC16e W+jets running to feed HPC simul. Still 100M to go
- Improvement in monitoring: Finished state now appears in white when events genuinely lost in that step
- Reprocessing
- CRC/ADCoS Report
- Stable ~320k slots (apart from power cut at CERN-P1) on Feb 5
- Problems with EOSATLAS Wed + Thu - fixed Fri
- Hammercloud blacklisting sites on Wed due to one missing input tarball - disabled
- Some degradation on CERN frontiers in Kibana - caused by non-optimal tuning for large number of connections
- Start using RAL FTS - UK+ND Jan 30, NL Jan 31
- Large amount of transfers from UK cloud
- Filled up local disk space due to too high logging in FTS
- BNL - mcore merge jobs starved for input files
- Saw large rebalance load due to CA site decommissioning (some issues with large files and slow <1MB/s transfers timing out)
- Modified number of concurrent input/output transfers for BNL site
- CNAF Status
- Tape library fully functional
- Wet tapes - hopefully recovered by Oracle end of Feb
- Disk systems - hardware on site and installation starts tomorrow - test by end of week
- Compute farm - service up and running. Limited by electric power and disk systems
- Some sites been in DOWNTIME for ~ year - should be cleaned up
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2018-02-06
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20180206
Topic revision: r1 - 2018-02-06 - LeslieGroer