Tier1 and Tier-2 Weekly Report 2018-02-20
General News
- ADC Weekly Meeting
[20180220]
- INFN Status
- Power restored on one line (1.4MW) - provides half the conditioned power. Other line ~month
- Cabling for 2017 storage tender going on now
- All ATLAS disk-only systems recovered - ready for production
- ATLAS tape buffer already in production
- Tape recovery by Oracle ~1 a day - few months
- ATLAS RAW data already replicated
- Farm services on CNAF (50 kHS06), 24 kHS06 in Bari
- Installing WNs at CINECA next week
- Start working on getting all services tested and online
- Group Derivation Production
- SharedWriter is being tested - at least one format has issues with metadata
- MemoryMonitor issue still unresolved
- Latest cache 21.2.16.0 built yesterday only for TAU group
- 3.5PB marked for deletion very soon
- Discussion of shares - current: GP_PHYS 10% (mostly data), GP_GROUP 3% only MC. Maybe go 50/50
- MC Production
- MC16d bulk production as complete as can be at this point (except INFN inputs)
- Recovering from rucio issues still
- Fed two more large MC16e simul to P1
- Remainder of large BPHYS sample to come (several 100M) - could do as ES, clarify with PMG
- Not much pile up running, some waiting on INFN inputs
- List of user requests slowly going down
- Reprocessing
- First part of data17 reprocessing
- Handful of jobs (~12) in period D and E needed to be obsoleted and retried (mainly merge steps)
- [RUNNING] Period B 15+1 runs to fix alignment errors in first reprocessing pass (no fork after first event)
- [RUNNING] Reprocessing of period F, H, I and K queued/started.
- CRC/ADCoS Report
- Running usual 250-300k slots
- Had low number of jobs due to less MC
- Issue with unacknowledged transfers in rucio for a period
- Heavy Ion overlay jobs overloading CERN and Lyon frontiers
- Discussion about CRC time spent on inefficient sites and investigation
- Some T0 issues with CERN-PROD - being followed up
- Still investigating issues with INFN-T1 transfer failures via RAL FTS
- No CRC shifter for next 3 months - encourage signup
- ATLAS Data Ocean Project
- Industry R&D Collaboration with Google Cloud Platform
- Integrate GCP with ADC
- Allow ATLAS to explore different computing models for HL-LHC
- Allow ATLAS user analysis to benfit from the Google infrastructure
- Give Google real science use cases to improve their cloud platform
- whitepaper: https://cds.cern.ch/record/2299146/files/ATL-SOFT-PUB-2017-002.pdf
- CA Cloud Squad Actions
- Open Issues and Ongoing Discussions
- WLCG and General Computing News
- Security News
- gLite/EMI News
- ROC_Canada News
ABCD Determination and Monitoring
SSB Results
SAM Results (based on VO tests)
APEL Accounting
- ACTION ITEM FOR SITES: Sites please regularly check and confirm that your historical APEL data has been published and looks correct when comparing with batch system utilization
APEL Synchronization Test Links
Production and Usage Status
--
Leslie Groer - 2018-02-20
Comments
This topic: AtlasCanada
> WebHome >
GridActivities >
ATLASCanadaTier-2Operations > T2WeeklyReport20180220
Topic revision: r1 - 2018-02-20 - LeslieGroer